Ze Zero-To Touc uch h En Ener ergy gy Au Audi dit

  • Findin

ing g a Au Automat ated ed Soluti tion

  • n for Energy

gy Audit

?

slide-2
SLIDE 2

NPCL

NOIDA POWER COMPANY LIMITED

NPCL is a joint venture between RP-Sanjiv Goenka Group, a leading business house in India and Greater Noida Industrial Development Authority, an autonomous body of U.P. Government responsible for town planning and infrastructure development.

Operati ration

  • nal

l Area: a: 335 sq.km km Custo tomer mer Base: e: 85 K

MVA

Peak Load: : 180 MVA 10x Incre rease ase in Custo tomer mer Base e & Peak k Load Load

slide-3
SLIDE 3

33 kV Substation 33/11 kV Substation

Transformer M3 M2 M6 M7 M8 M9 M1 M4 M5 33 kV Consumer Meter 33 kV Consumer Meter LT Consumer Meters 11 kV Consumer Meter Outgoing Meter Incoming Meter Outgoing Meter

slide-4
SLIDE 4

33/11 kV Substation 33 kV Substation

M1 M3 M2 M4

Loss = M1 – (M2 + M3 + M4)

33 kV Consumer Meter 33 kV Consumer Meter Outgoing Meter Incoming Meter M1 M2 M3 M4

slide-5
SLIDE 5

33/11 kV Substation

Transformer M5 M6 M7 M8 M9

Loss= M5 – (M6 + M7 + M8 + M9)

LT Consumer Meters 11 kV Consumer Meter Outgoing Meter M5 M6 M7 M8 M9

slide-6
SLIDE 6

33/11 kV Substation 33 kV Substation

M1 M3 M2 M4

33/11 kV Substation

Transformer M5 M6 M7 M8 M9

Loss= M1 – (M2 + M3 + …+ M9)

Pre-Requisite of Energy Audit = Meter Hierarchy Tree.

slide-7
SLIDE 7

M M M M

Establish Hierarchy

AU IT

D Micro-Manage Audit Capture Network Updates

Accurately capture all the Metering Points present in the network and place them in a logical hierarchical tree. Micro-Manage Audit by introducing more Meter Levels in the hierarchical tree. Capture and update the hierarchical tree in case of any Network changes such as Network Extension, Switching, etc.

slide-8
SLIDE 8

33/11 kV Substation 33 kV Substation

M1 M3 M2 M4

Initiate Back Trace from Meter Meter Encountered? Consumer Meter? Continue Back Tracing Retrieve Meter Record from DB Assign as Parent Retrieve Next Meter Record from DB No Yes Yes No

slide-9
SLIDE 9

Problem Statement: Accurately capture all the Metering Points present in the network and place them in a logical hierarchical tree. Solution: For each Meter present in the DB, use back- tracing to find its Parent Meter (Non- Consumer).

Establish Hierarchy

M M M M

slide-10
SLIDE 10

Substation Meter DT Meter Consumer Meter Auditing Error Existing Hierarchy Substation Meter DT Meter Consumer Meter Auditing Error Boundary Meter Division Meter Newly Introduced Levels Updated Hierarchy Legends:

Segment with excessive Energy Loss Normal Segment

Large Area

  • f Focus

Reduced Area of Focus

slide-11
SLIDE 11

Substation Level Feeder Level DT Level Substation Level Feeder Level DT Level Division Level Boundary Level Nodal Level Switching Level Pre-GIS Post-GIS

slide-12
SLIDE 12

Problem Statement: In the Existing levels of Hierarchy the “Inspection Area” (Area of Focus) is too big. This is resulting in higher rates of “Resolution Time” Solution: Introduce more layers (i.e. Meters) into the Hierarchical Tree in order increase the number

  • f “Audit Sections” thereby reducing the Area
  • f Focus.

Micro-Manage Audit

AU IT

D

slide-13
SLIDE 13

Substation

M1

Substation

M2 M3 M4 M5 M6 M7

Transformer

M1 M5 M3 M6 M7 M4 M2

Meter Hierarchy Switch Closed Switch Open

slide-14
SLIDE 14

Substation

M1

Substation

M2 M3 M4 M5 M7 M8

Transformer

M1 M5 M3 M6 M7 M4 M2

Switch Open Switch Closed Meter Hierarchy Updated

slide-15
SLIDE 15

Project Created in SAP Design Created in GIS Network Proposed in GIS Proposed Network Approved Nw Augmentation Started Field Verification Done Design Approved in GIS Design Data Posted Design Data Synced with SAP Project Created in SAP Design Created in GIS Network Proposed in GIS Proposed Network Approved Nw Augmentation Started Field Verification Done Design Approved in GIS Design Data Posted Design Data Synced with SAP Energy Audit Extract Triggered Existing Process Flow Updated Process Flow

slide-16
SLIDE 16

Problem Statement: Update the Hierarchical Tree in case of any Network Changes such as Network Extensions, Network Switching, etc. Solution: Since all changes made to the network are routed via Business Process, update the Process Flow to trigger Energy Audit extract whenever Network Changes are captured.

Capture Network Updates

slide-17
SLIDE 17

Since the Data is extract only after going through multiple layers of QAQC, the reliability

  • f Energy Audit Reports is

greatly enhanced

Enhanced Reliability

Introduction of Additional layers have drastically reduced the Timelines associated with locating the issue

Reduced Processing Time

The triggering, extraction and delivery hierarchical tree is completely automated thereby eliminating any chance of user- related error.

Completely Automated

Solution is designed in such a way that any augmentation to the network (big/small) can easily be captured and passed on to the hierarchical tree.

Scalable Solution

slide-18
SLIDE 18

Red Planet Solutions 25-12, Level 25, Q-Sentral, 2A Jalan Stesen Sentral 2, Kuala Lumpur Sentral, 50470 Kuala Lumpur

Swami (Senior Consultant)

+91-9884183818 swami@redplanetconsulting.com www.redplanetconsulting.com

Solutions Malaysia