Ze Zero-To Touc uch h En Ener ergy gy Au Audi dit
- Findin
ing g a Au Automat ated ed Soluti tion
- n for Energy
gy Audit
? Zero-To Ze Touc uch h En Ener ergy gy Au Audi dit - - - PowerPoint PPT Presentation
? Zero-To Ze Touc uch h En Ener ergy gy Au Audi dit - Findin ing g a Au Automat ated ed Soluti tion on for Energy gy Audit NPCL is a joint venture between RP-Sanjiv Goenka Group, a leading business house in India and Greater
ing g a Au Automat ated ed Soluti tion
gy Audit
NOIDA POWER COMPANY LIMITED
NPCL is a joint venture between RP-Sanjiv Goenka Group, a leading business house in India and Greater Noida Industrial Development Authority, an autonomous body of U.P. Government responsible for town planning and infrastructure development.
Operati ration
l Area: a: 335 sq.km km Custo tomer mer Base: e: 85 K
MVA
Peak Load: : 180 MVA 10x Incre rease ase in Custo tomer mer Base e & Peak k Load Load
33 kV Substation 33/11 kV Substation
Transformer M3 M2 M6 M7 M8 M9 M1 M4 M5 33 kV Consumer Meter 33 kV Consumer Meter LT Consumer Meters 11 kV Consumer Meter Outgoing Meter Incoming Meter Outgoing Meter
33/11 kV Substation 33 kV Substation
M1 M3 M2 M4
Loss = M1 – (M2 + M3 + M4)
33 kV Consumer Meter 33 kV Consumer Meter Outgoing Meter Incoming Meter M1 M2 M3 M4
33/11 kV Substation
Transformer M5 M6 M7 M8 M9
Loss= M5 – (M6 + M7 + M8 + M9)
LT Consumer Meters 11 kV Consumer Meter Outgoing Meter M5 M6 M7 M8 M9
33/11 kV Substation 33 kV Substation
M1 M3 M2 M4
33/11 kV Substation
Transformer M5 M6 M7 M8 M9
Loss= M1 – (M2 + M3 + …+ M9)
Pre-Requisite of Energy Audit = Meter Hierarchy Tree.
M M M M
Establish Hierarchy
AU IT
D Micro-Manage Audit Capture Network Updates
Accurately capture all the Metering Points present in the network and place them in a logical hierarchical tree. Micro-Manage Audit by introducing more Meter Levels in the hierarchical tree. Capture and update the hierarchical tree in case of any Network changes such as Network Extension, Switching, etc.
33/11 kV Substation 33 kV Substation
M1 M3 M2 M4
Initiate Back Trace from Meter Meter Encountered? Consumer Meter? Continue Back Tracing Retrieve Meter Record from DB Assign as Parent Retrieve Next Meter Record from DB No Yes Yes No
Problem Statement: Accurately capture all the Metering Points present in the network and place them in a logical hierarchical tree. Solution: For each Meter present in the DB, use back- tracing to find its Parent Meter (Non- Consumer).
Establish Hierarchy
M M M M
Substation Meter DT Meter Consumer Meter Auditing Error Existing Hierarchy Substation Meter DT Meter Consumer Meter Auditing Error Boundary Meter Division Meter Newly Introduced Levels Updated Hierarchy Legends:
Segment with excessive Energy Loss Normal Segment
Large Area
Reduced Area of Focus
Substation Level Feeder Level DT Level Substation Level Feeder Level DT Level Division Level Boundary Level Nodal Level Switching Level Pre-GIS Post-GIS
Problem Statement: In the Existing levels of Hierarchy the “Inspection Area” (Area of Focus) is too big. This is resulting in higher rates of “Resolution Time” Solution: Introduce more layers (i.e. Meters) into the Hierarchical Tree in order increase the number
Micro-Manage Audit
AU IT
Substation
M1
Substation
M2 M3 M4 M5 M6 M7
Transformer
M1 M5 M3 M6 M7 M4 M2
Meter Hierarchy Switch Closed Switch Open
Substation
M1
Substation
M2 M3 M4 M5 M7 M8
Transformer
M1 M5 M3 M6 M7 M4 M2
Switch Open Switch Closed Meter Hierarchy Updated
Project Created in SAP Design Created in GIS Network Proposed in GIS Proposed Network Approved Nw Augmentation Started Field Verification Done Design Approved in GIS Design Data Posted Design Data Synced with SAP Project Created in SAP Design Created in GIS Network Proposed in GIS Proposed Network Approved Nw Augmentation Started Field Verification Done Design Approved in GIS Design Data Posted Design Data Synced with SAP Energy Audit Extract Triggered Existing Process Flow Updated Process Flow
Problem Statement: Update the Hierarchical Tree in case of any Network Changes such as Network Extensions, Network Switching, etc. Solution: Since all changes made to the network are routed via Business Process, update the Process Flow to trigger Energy Audit extract whenever Network Changes are captured.
Capture Network Updates
Since the Data is extract only after going through multiple layers of QAQC, the reliability
greatly enhanced
Enhanced Reliability
Introduction of Additional layers have drastically reduced the Timelines associated with locating the issue
Reduced Processing Time
The triggering, extraction and delivery hierarchical tree is completely automated thereby eliminating any chance of user- related error.
Completely Automated
Solution is designed in such a way that any augmentation to the network (big/small) can easily be captured and passed on to the hierarchical tree.
Scalable Solution
Red Planet Solutions 25-12, Level 25, Q-Sentral, 2A Jalan Stesen Sentral 2, Kuala Lumpur Sentral, 50470 Kuala Lumpur
Swami (Senior Consultant)
+91-9884183818 swami@redplanetconsulting.com www.redplanetconsulting.com
Solutions Malaysia