zero to ze touc uch h en ener ergy gy au audi dit findin
play

? Zero-To Ze Touc uch h En Ener ergy gy Au Audi dit - - PowerPoint PPT Presentation

? Zero-To Ze Touc uch h En Ener ergy gy Au Audi dit - Findin ing g a Au Automat ated ed Soluti tion on for Energy gy Audit NPCL is a joint venture between RP-Sanjiv Goenka Group, a leading business house in India and Greater


  1. ? Zero-To Ze Touc uch h En Ener ergy gy Au Audi dit - Findin ing g a Au Automat ated ed Soluti tion on for Energy gy Audit

  2. NPCL is a joint venture between RP-Sanjiv Goenka Group, a leading business house in India and Greater Noida Industrial Development Authority, an autonomous body of U.P. Government responsible for town planning and infrastructure development. NPCL NOIDA POWER COMPANY LIMITED Custo tomer mer Base: e: 85 K Operati ration onal l Area: a: 335 sq.km km 10x Incre rease ase in Peak Load: : 180 MVA Custo tomer mer Base e & Peak k MVA Load Load

  3. 33 kV Consumer M3 Meter Outgoing Meter 33 kV M 1 Substation 33 kV Consumer M2 Meter 11 kV Consumer M6 M7 Meter Incoming M4 Meter LT M5 M8 Consumer 33/11 kV Meters Outgoing Substation Meter M9 Transformer

  4. 33 kV Consumer M3 Meter Outgoing Meter 33 kV M 1 Substation 33 kV Consumer Meter M2 Incoming M 1 M4 Meter Loss = M1 – (M2 + M3 + M4) 33/11 kV Substation M2 M 4 M3

  5. M5 M6 M8 M9 M7 Loss= M5 – (M6 + M7 + M8 + M9) 11 kV Consumer M6 Meter M7 33/11 kV LT M5 M8 Consumer Substation Meters Outgoing Meter M9 Transformer

  6. Pre-Requisite of Energy M3 Audit = Meter Hierarchy Tree. 33 kV M 1 Substation M2 M6 M7 M4 33/11 kV 33/11 kV M5 M8 Substation Substation M9 Transformer Loss= M1 – (M2 + M3 + …+ M9)

  7. Capture M Establish Micro-Manage D IT AU Network Hierarchy Audit M M M Updates Capture and update the Accurately capture all the Micro-Manage Audit by hierarchical tree in case of any Metering Points present in introducing more Meter Network changes such as the network and place them Levels in the hierarchical Network Extension, Switching, in a logical hierarchical tree. tree. etc.

  8. M3 33 kV 33/11 kV M 1 M4 Substation Substation M2 Retrieve Meter Record from DB No Yes No Initiate Back Trace Meter Continue Back Consumer Assign as Parent from Meter Encountered? Tracing Meter? Yes Retrieve Next Meter Record from DB

  9. M Problem Statement: Accurately capture all the Metering Points M M M present in the network and place them in a Establish Hierarchy logical hierarchical tree. Solution: For each Meter present in the DB, use back- tracing to find its Parent Meter (Non- Consumer).

  10. Existing Hierarchy Auditing Error Consumer Substation DT Meter Meter Meter Large Area of Focus Legends: Segment with excessive Energy Loss Normal Segment Reduced Updated Area of Focus Hierarchy Boundary Consumer Substation Division DT Meter Meter Meter Meter Meter Auditing Error Newly Introduced Levels

  11. Post-GIS Substation Level Pre-GIS Feeder Level DT Level Substation Level Feeder Level Division Level DT Level Boundary Level Nodal Level Switching Level

  12. Problem Statement: D IT AU In the Existing levels of Hierarchy the “Inspection Area” (Area of Focus) is too big. Micro-Manage This is resulting in higher rates of “Resolution Audit Time” Solution: Introduce more layers (i.e. Meters) into the Hierarchical Tree in order increase the number of “Audit Sections” thereby reducing the Area of Focus.

  13. Substation Substation M2 M 1 Switch Closed Switch Open M3 M4 M1 M2 Meter M5 M6 Hierarchy M3 M4 M5 M7 Transformer M6 M7

  14. Substation Substation M2 M 1 Switch Open Switch Closed M3 M4 M1 Meter M2 M5 Hierarchy M7 Updated M3 M4 M5 M8 Transformer M6 M7

  15. Project Created in Design Created in Network Proposed Network Nw Augmentation SAP GIS Proposed in GIS Approved Started Existing Design Data Synced Design Approved in Field Verification Design Data Posted Process Flow with SAP GIS Done Updated Process Flow Project Created in Design Created in Network Nw Augmentation Proposed Network SAP GIS Proposed in GIS Approved Started Energy Audit Design Data Synced Design Approved in Field Verification Design Data Posted Extract Triggered with SAP GIS Done

  16. Problem Statement: Update the Hierarchical Tree in case of any Network Changes such as Network Extensions, Capture Network Network Switching, etc. Updates Solution: Since all changes made to the network are routed via Business Process, update the Process Flow to trigger Energy Audit extract whenever Network Changes are captured.

  17. Reduced Enhanced Reliability Processing Time Since the Data is extract only Introduction of Additional layers after going through multiple have drastically reduced the layers of QAQC, the reliability Timelines associated with of Energy Audit Reports is locating the issue greatly enhanced Completely Automated Scalable Solution The triggering, extraction and Solution is designed in such delivery hierarchical tree is a way that any augmentation completely automated thereby to the network (big/small) eliminating any chance of user- can easily be captured and related error. passed on to the hierarchical tree.

  18. Swami (Senior Consultant) Red Planet Solutions swami@redplanetconsulting.com 25-12, Level 25, Q-Sentral, 2A Jalan Stesen Sentral 2, +91-9884183818 Kuala Lumpur Sentral, Solutions Malaysia 50470 Kuala Lumpur www.redplanetconsulting.com

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend