Eliminating the risk, by knowing your responsibilities under AS/ NZ 61439:2016
Y our Switchboard Y our Site Y our Responsibility: Eliminating - - PowerPoint PPT Presentation
Y our Switchboard Y our Site Y our Responsibility: Eliminating the risk, by knowing your responsibilities under AS/ NZ 61439:2016 Principal Sponsor 13-15 November 2018 Rotorua, NZ AS/NZS61439 - The Changes Standards Australia/ New Zealand
Principal Sponsor
13-15 November 2018 Rotorua, NZ
Eliminating the risk, by knowing your responsibilities under AS/ NZ 61439:2016
Standards Australia/ New Zealand introduced ASNZS61439 in M ay 2017 with a 5 year phasing in period. Pre M ay 2021 Either ASNZS3439, ASNZS61439 or IEC61439 may be specified for Switchboard design and construction in Australia and New Zealand
Principal Sponsor
13-15 November 2018 Rotorua, NZ
Post M ay 2021 ASNZS3439 can no longer be referenced. Only ASNZS61439 or IEC61439 may be specified for Switchboard design and construction in Australia and New Zealand reference to TTA (type tested assembly) or PTTA (partial type tested assembly) disappears, assemblies now have 13 criteria that they need to be verified to, using 1 of the 3 following mythologies:
within the standard
accountability and
Shaun
Principal Sponsor
13-15 November 2018 Rotorua, NZ
accountability and responsibility
installation
Shaun
now that partial type testing has been removed from within with in ASNZS 61439 and replaced with full type testing What does that mean?
Principal Sponsor
13-15 November 2018 Rotorua, NZ
Original M anufacturer e.g. S ystem Designer & M anufacturer i.e. CUBIC Device M anufacturer e.g. T erasaki
Principal Sponsor
13-15 November 2018 Rotorua, NZ
i.e. CUBIC Assembly M anufacturer e.g. Switchboard Builder
Final Assembly End User (Specifier)
the key here is the annex C “ information template” and annex D “ verification document ”
IEC 61439 = agreements and clarifications between manufacturers and end users
Principal Sponsor
13-15 November 2018 Rotorua, NZ
Principal Sponsor
13-15 November 2018 Rotorua, NZ
Principal Sponsor
13-15 November 2018 Rotorua, NZ
Principal Sponsor
13-15 November 2018 Rotorua, NZ
Principal Sponsor
13-15 November 2018 Rotorua, NZ
Principal Sponsor
13-15 November 2018 Rotorua, NZ
Principal Sponsor
13-15 November 2018 Rotorua, NZ
Principal Sponsor
13-15 November 2018 Rotorua, NZ
Principal Sponsor
13-15 November 2018 Rotorua, NZ
Principal Sponsor
13-15 November 2018 Rotorua, NZ
Principal Sponsor
13-15 November 2018 Rotorua, NZ
Principal Sponsor
13-15 November 2018 Rotorua, NZ
Principal Sponsor
13-15 November 2018 Rotorua, NZ
Electrical system Short-circuit withstand Protection of persons against electric shock Installation environment
Principal Sponsor
13-15 November 2018 Rotorua, NZ
Installation environment Installation method Storage and handling Operating arrangements M aintenance and upgrade capabilities Current carrying capability
Cable Size & Layout Transformer Isolation
Principal Sponsor
13-15 November 2018 Rotorua, NZ
Cable Size & Layout Easter Shutdown Ingress Protection Rating Assembly on site & Testing Transformer Isolation Temporary Switchboard for Essential Supplies Identifying Redundant Cables & Circuits
echnical Verification of the M ain Switchboard
Principal Sponsor
13-15 November 2018 Rotorua, NZ
erasaki
Principal Sponsor
13-15 November 2018 Rotorua, NZ
Principal Sponsor
13-15 November 2018 Rotorua, NZ
Principal Sponsor
13-15 November 2018 Rotorua, NZ
Principal Sponsor
13-15 November 2018 Rotorua, NZ
Principal Sponsor
13-15 November 2018 Rotorua, NZ
Principal Sponsor
13-15 November 2018 Rotorua, NZ
echnical Evaluation of the M ain Switchboard
echnical Design Verification information supplied using AS/ NZS61439 - Annex D - Design Verification documentation
Principal Sponsor
13-15 November 2018 Rotorua, NZ
template
Principal Sponsor
13-15 November 2018 Rotorua, NZ
echnical Validation of the M ain Switchboard
Principal Sponsor
13-15 November 2018 Rotorua, NZ
Annex C – User information template
erasaki
Principal Sponsor
13-15 November 2018 Rotorua, NZ
Principal Sponsor
13-15 November 2018 Rotorua, NZ
Principal Sponsor
13-15 November 2018 Rotorua, NZ
Principal Sponsor
13-15 November 2018 Rotorua, NZ
echnical Verification of the M ain Switchboard
Principal Sponsor
13-15 November 2018 Rotorua, NZ
echnical Evaluation of the M ain Switchboard
echnical Validation of the M ain Switchboard