Works Lockmiths and Welding Prask tda 155/4 500 04 Hradec Krlov - - PowerPoint PPT Presentation

works lockmith s and welding
SMART_READER_LITE
LIVE PREVIEW

Works Lockmiths and Welding Prask tda 155/4 500 04 Hradec Krlov - - PowerPoint PPT Presentation

Works Lockmiths and Welding Prask tda 155/4 500 04 Hradec Krlov Czech Republic tel./phone: +420 498 522 111 www.wlwgroup.cz Who we are? Established on April 27, 2011 on the basis of twenty years of experience


slide-1
SLIDE 1

Works – Lockmith’s and Welding

Pražská třída 155/4 500 04 Hradec Králové Czech Republic tel./phone: +420 498 522 111 www.wlwgroup.cz

slide-2
SLIDE 2

Who we are?

  • Established on April 27, 2011 on the basis of

twenty years of experience

  • Installation of Technological Equipment
  • Manufacturing and installation of piping systems

Manufacturing and installation of Steel Structures

  • Realization of “turnkey” investment units. With

customer studies

slide-3
SLIDE 3

Organizational chart

MANAGING DIRECTOR Marie Dvorakova HEAD OF PROJECT MANAGERS Miroslav Jakubský PROJECT MANAGERS (3 Persons) + 1 person - specialist for French market Xavier Walch PURCHASE DEPARTMENT Boleslav Niedoba EXTERNAL DESIGN OFFICE BUSINESS AND MARKETING MANAGERS Zdena Tenglerova ACCOUNTING DEPARTMENT Zuzana Tomenukova EXTERNAL TAX SPECIALIST

  • Ing. Monika Hujerova

SAFETY MANAGER HIRING OF THE STAFF MANPOWER PLANNING Aleš Polák Safety technicians

  • n sites

QUALITY MANAGER Josef Feifer WELDING ENGINEER

  • Ing. Jiří Vlček

TECHNICAL AND HAND OVER DOCUMENTATION TECHNICIANS PRODUCTION DEPARTMENT Petr Koza INSTALLATION GROUPS 5 Site managers WORKSHOP PRODUCTION WORKSHOP & INSTALLATIONS STORING & TOOLS STORING

slide-4
SLIDE 4

Our human resources

5% 8% 3% 5% 79%

Administration Projects managers Quality manager & International welding technologist Safety managers Employed and self employed

Our workers and cooperation have following authorization: Slinger, Crane Operator, mobile platform operator, Forklift Driver.

slide-5
SLIDE 5

Our production capacities

Stainless SteelWorkshop

Total area of the workshop: 2000 m² with 5T crane

  • New areal of 8500 m ²
  • New workshop 1500 m ² with crane 5T
  • Plasma cutter 4m x 2m, Th 1,5 - 25/40 incl.

pipe cutting and water spraying for stainless steel cutting

DEC 2019

slide-6
SLIDE 6

x5 x15 x5 x5 x2 x1 x3 x2 x2 x1

Transporters TIG welding machine MIG / MAG welding machine Ventilated welding helmet George fisher Hand Plasma cutter 1.6T Forklift 3.5T Forklift Drill press Band-saw

Our production capacities

slide-7
SLIDE 7

Full Investment Unit Management

"Turnkey„ Projects

Painting

Scaffolding

Electro + MaR CNC machining Plastic piping

Mechanism

NDT Transport

  • n site

Insulation Site facilities

slide-8
SLIDE 8

Certifications :

  • Execution of steel structures - EN 1090-2
  • Pressure vessels - PED 2014/68 / EU (PED: Pressure Equipment Directive).
  • Quality requirements for fusion welding processes - ČSN EN ISO 3834-2: 2006

Certifications and Authorizations

Authorizations :

  • Installation and repair of a dedicated gas equipment - type a, b, c, d, e, f, g -TICR

(Technical Institute of the Czech Republic)

  • Production, installation and repair of a dedicated pressure equipment
  • Installation and repair of technical equipment dedicated to gas and technical

equipment under pressure - mining areas - issued by the mining office.

slide-9
SLIDE 9

Our Welding qualification

  • FM4 - FM1 - CS
  • Th = 1 mm to Inf

Proc : 135 / 141 + 111

  • Ø 25 to Inf
  • FM5 - SS
  • Th = 1 mm to Inf m

Proc 141 + 111

  • Ø 12 to Inf
  • W41 - Ni
  • Th = 2.8 to 5.6 mm

Proc 141

  • Ø 30.15 to Inf
  • Position H-L045
  • EN ISO 9606-1
slide-10
SLIDE 10

Our mobility

Installation works:

  • Czech Repulic
  • Slovakia
  • Norway
  • Faroe Island
  • United Kingdom
  • Germany
  • France
  • Slovenia
  • Spain
  • Switzerland
  • Poland

Deliveries:

  • Russia
  • Pakistan
  • Belgium
  • Mexico
slide-11
SLIDE 11

Our achievements in pictures…

  • Supply, pre-assembly and installation of ON & OFF SKID – Process equipment of hydrogen production
  • plant. Delivery to Russia at Antipinsky.
  • 30.000 Nm3 / h hydrogen plant
  • Packing in containers incl. necessary marking
  • Builder folder (according ASME norm) and installation folder
slide-12
SLIDE 12
  • Petrochemical sector
  • Line identification, production of the

manufacturer's file and assembly

  • 22 containers of 85m3

Stainless steel piping production for Pakistan

slide-13
SLIDE 13

Production and installation of stainless steel platform for food industry

slide-14
SLIDE 14

Stainless steel pipe installation (double jacket piping) for food industry next ..

slide-15
SLIDE 15

Realization of Skid units

slide-16
SLIDE 16

Transport on the position of heavy equipment

slide-17
SLIDE 17

Installation of technological equipment

  • Autoclave installation for

AirFrance, Paris CDG.

  • Electrical connection and

pipe.

slide-18
SLIDE 18

Industrial displacement

  • From Spain to the Czech Republic
  • Combination of new technology

with the old one – e.g. green tower

slide-19
SLIDE 19
  • Dismantling ducts and existing steel structure
  • Manufacture and installation new steel structure
  • Disassembly of old exchanger
  • Manufacture and installation of a new heat

exchanger of about 48T

  • Connection of the heat exchanger with new pipes

to the existing lines.

CS Cabot – Soot Production

1st CABOT Safety Challenge on 12 subcontractors

slide-20
SLIDE 20

Cooperation with vessel producers Vessels installation

Tanks and vessels

Production of small pressure tanks according to PED

slide-21
SLIDE 21

Galvanizing Basin Manufacturing Delivery for Mexico

slide-22
SLIDE 22

Piping

slide-23
SLIDE 23
  • Wide spectrum of activities

Steel Structures / Piping / Technology - Installation Production from different type of materials

  • Long-term cooperation with verified subcontractors
  • Quality and safety monitoring
  • Big scale of Certification
  • Open to innovation

Conclusion / Contact