Technical (and other) challenges associated with welding and inspection of CRA pipelines Matt Lancien , Materials & Welding Engineer, SPEC Pty Ltd We Welding in in the the indus ndustr try We Welding in in our our indus ndustr try DNV AWS


slide-1
SLIDE 1

Technical (and other) challenges associated with welding and inspection of CRA pipelines

Matt Lancien, Materials & Welding Engineer, SPEC Pty Ltd

slide-2
SLIDE 2

We Welding in in the the indus ndustr try

slide-3
SLIDE 3

We Welding in in our

  • ur indus

ndustr try

ASME DNV AWS D1.1

slide-4
SLIDE 4

We Welding of

  • f CRA

CRA HP HP/HT /HT Pi Pipeli pelines nes

DNV‐OS‐F101 + DNV JIP + Company specification

slide-5
SLIDE 5

ND NDT of

  • f CRA

CRA Pi Pipel pelines es

Carbon Steel Pipelines: same/similar material for pipe & weld

slide-6
SLIDE 6

ND NDT of

  • f CRA

CRA Pi Pipel pelines es

CRA pipelines: dissimilar materials for pipe & weld & CRA layer

  • High anisotropy (grain orientation)
  • Scatter of ultrasound
  • Varying speed of sound transmission
  • Specific calibration block & qualification program
  • Training of operators
slide-7
SLIDE 7

Desi Design gn

Specify an achievable & consistent flaw acceptance criteria

Planned buckles over ZRBs / DIs Unplanned buckles

slide-8
SLIDE 8

CRA CRA Li Linepipe nepipe Procur

  • curem

emen ent

slide-9
SLIDE 9

Qualific alificatio ions ns & Te Testing

2: Inherent welding flaws 1: WPS & Welders qualifcation 3: NDT procedure qualification

slide-10
SLIDE 10

We Welding Pre Preparat ation

slide-11
SLIDE 11

Ma Main Line Line We Welding Process

  • cess
slide-12
SLIDE 12

We Welding Qualific alificatio ions

2: Manual welding (GTAW) for repairs & tie‐ins 1: Automatic welding (GMAW) for main line

slide-13
SLIDE 13

We Welding & Pu Purge rge Mo Monito toring

Strict control on welding parameters

slide-14
SLIDE 14

CRA CRA Root

  • ot Pa

Pass Inspection Inspection

slide-15
SLIDE 15

CRA CRA Root

  • ot Pa

Pass Inspection Inspection

slide-16
SLIDE 16

CRA CRA Root

  • ot Pa

Pass Inspection Inspection

slide-17
SLIDE 17

AU AUT Qualific alificatio ion

Comprehensive program to demonstrate sizing/detection capability of the AUT system:

  • Significant number of defects (minimum of 122 flaws seeded across the weld volume)
  • All flaws need to be representative of production inherent flaws and actual ECA criteria
slide-18
SLIDE 18

AU AUT Qualific alificatio ion

Comprehensive program to demonstrate sizing/detection capability of the AUT system:

  • Comparing AUT predicted flaw sizes with actual flaw sizes (oversizing and undersizing)
slide-19
SLIDE 19

Qualifie alified Pe Pers rsonnel

  • Welding Engineer ‐ Operator and Contractor
  • NDT Level 3 in RT & UT (PA & TOFD) ‐ Operator and

Contractor

  • Experienced QC Welding & NDT Inspectors (surveillance)
  • Trained and familiarised welder and operators (training

school and pipe cycling) CONTINUITY is the key ! The same people involved at qualification will follow on offshore pipeline production

slide-20
SLIDE 20

The The Lucky Lucky Coun Country

Engineers – 8 on / 4 off WA & NT – 3 on / 3 off Welders – 13 on / 3 off Bass Strait – 2 on / 2 off Changes are needed to ensure consistent pipeline production

slide-21
SLIDE 21

Less Less Of Offshor hore Weld lding ing

Most of the pipeline production removed from critical path and performed outside Australia (South East Asia, etc.)

slide-22
SLIDE 22

EPCI EPCI Con Contr tracti acting ng

  • EPCI procure his pipes according to the agreed project

specification therefore they have to weld it together

  • Only 3 pipe mills in the world (Japan & Germany)
  • SMEs and Company reps to work as an integrated team with

the installation contractors

  • It’s done this way for complex SURF projects overseas
  • “You’re building my house but not living in it later on” so

managing risks can’t be left to Contractor only who doesn’t share the same risks as the Operator

slide-23
SLIDE 23

In In‐house house ex expertise

Installation contractors and specialised subcontractors have their own welding center of excellence with permanent R&D projects to improve the productivity and quality of pipeline welding and inspection.

slide-24
SLIDE 24
slide-25
SLIDE 25

Surf Surface ace Te Tension Tr Transfer (S (STT)

slide-26
SLIDE 26
slide-27
SLIDE 27

Re Recent we welding technol chnology gy

slide-28
SLIDE 28

Pre Previous ND NDT technology chnology

“Old School” Radiography Technology, everybody can “see”

slide-29
SLIDE 29

Re Recent ND NDT te technology

Ultrasonic Technology, not everybody can “see” and interpret

slide-30
SLIDE 30

Re Recent ND NDT te technology

More NDT companies = competition drives to innovation

slide-31
SLIDE 31

The The ne next fr fron

  • ntier

tier in in WA WA?

slide-32
SLIDE 32

The The “T “Terrace”

  • Talking and knowledge sharing
  • We have laid more CRA flowlines in WA in the last 5 years

than any other country so by now we should know how do to get it right

  • But there is no silver bullet, every project is different and

when technical issues arise we work together to solve it and sometimes learn to give up on specs or design !!