Wide Hollow Project Sponsored By Oneida SWCD John Wittman - - PowerPoint PPT Presentation

wide hollow project
SMART_READER_LITE
LIVE PREVIEW

Wide Hollow Project Sponsored By Oneida SWCD John Wittman - - PowerPoint PPT Presentation

Wide Hollow Project Sponsored By Oneida SWCD John Wittman (Chairman) Wide Hollow Watershed Map Past Projects. Wrights Creek Stream bank Restoration This project concluded in 2008 Installed 2257 Feet of Fence Excluded 4.5


slide-1
SLIDE 1

Sponsored By Oneida SWCD John Wittman (Chairman)

Wide Hollow Project

slide-2
SLIDE 2

Wide Hollow Watershed Map…

slide-3
SLIDE 3

Past Projects….

 Wrights Creek Stream bank Restoration

 This project concluded in 2008  Installed 2257 Feet of Fence  Excluded 4.5 Acres  Reduction of 8,823 Tons of Sediment  52 Foot Average Riparian Buffer along Wrights Creek  Both sides of the stream were fenced to reduce livestock

impacts

slide-4
SLIDE 4

Past Projects Continued…

 Daniels Non Point Sediment Reduction Project  (Ongoing) Currently in its 3rd year

 12 Troughs  180 Cubic yards of Heavy use Protection  27,000 Feet of Pipeline Stock water conveyance  2 Spring Developments  2,900 Feet of Fence  10,959 Feet of Terrace  49 Water and Sediment Basins  386 Acres of Pasture Planting

slide-5
SLIDE 5

Stream exclusion…

slide-6
SLIDE 6

Wid ide Hol

  • llow P

Projec

  • ject Go

Goal als…

 Install Water and Sediment Basins on Dry Crop Land  120 Water & Sediment Basins  17,400 Feet of Terraces  12,300 Feet of Pipe for Stock water Conveyance  2 Solar Pumping Systems  16,700 Feet of Barbed Wire Fence  100 Feet of Corral Fence  12 Water Troughs  140 Cubic Yards of Heavy Use Protection  200 Cubic Yards of Corral Berm  1 Spring Development  1 Water Well  10,000 Gallon Storage Tank

slide-7
SLIDE 7

Riparian Exclusion…

slide-8
SLIDE 8

Wid ide Hol

  • llow P

Projec

  • ject B

Budg dget

 Administrative:

 319-19,031  Match-4,500  Total-23,531

 Sub contractual:

 319-218,401  Match- 158,641  Total- 377,043

 Travel:

 319-7,946  Match-2,249  Total-10,195

 Supplies, operating and

equipment:

 319-4,370  Match-2,913  Total-2,784

slide-9
SLIDE 9

Sediment Basins will be installed to reduce sheet and rill erosion…

slide-10
SLIDE 10

Any Q y Questio ions?