Where did we come from? ~ A quest for the physics that operates at - - PowerPoint PPT Presentation

▶
where did we come from
SMART_READER_LITE
LIVE PREVIEW

Where did we come from? ~ A quest for the physics that operates at - - PowerPoint PPT Presentation

MPI fr Astrophysik Where did we come from? ~ A quest for the physics that operates at the beginning of our Universe ~ Eiichiro Komatsu [Scientific Member since 2012 ] CPTS Sektionssitzung, February 23, 2017 Fluctuations existed Spectroscopy of


slide-1
SLIDE 1

Where did we come from?

~A quest for the physics that operates at the beginning of our Universe~

Eiichiro Komatsu [Scientific Member since 2012] CPTS Sektionssitzung, February 23, 2017

MPI für Astrophysik

Fluctuations existed at the beginning… …they grew gravitationally to form galaxies, stars, us Spectroscopy of the whole Universe!

slide-2
SLIDE 2

I am…

  • a “cosmologist”
  • or, someone between astronomy and physics
  • Theoretical and observational. I divide my research

time into

  • ~2/3 theory, ~1/3 data analysis
slide-3
SLIDE 3

Where did I come from?

500 km (only 2.5 hours by a bullet train “Shinkansen”!) Before I tell you where you came from…

slide-4
SLIDE 4

Where is our former president?

in office since Jan 1, 2017

slide-5
SLIDE 5

Where did I come from?

500 km (only 2.5 hours by a bullet train “Shinkansen”!) Before I tell you where you came from…

slide-6
SLIDE 6

Where did I come from?

Before I tell you where you came from…

KANSAI = Bayern in Japan

Bayern in Japan!!, because

  • We speak funny dialects,
  • Everyone else makes fun of us,
  • But we are very proud of ourselves,
  • Because we were once the center of the country

KANSAI Area

slide-7
SLIDE 7

“The Capital” 1.5 million Merchants and Comedians 2.7 million Beef and shoes 1.5 million

Takara-zuka

30 km 50 km (220k)

KANSAI Area

slide-8
SLIDE 8

Two things about Takarazuka that every single Japanese knows

Female-only Musical Performance

KAGEKI “Revue”

slide-9
SLIDE 9

Godfather of “Manga” and “Anime”

Osamu Tezuka

Two things about Takarazuka that every single Japanese knows

slide-10
SLIDE 10

Where did I come from?

Tohoku University in Sendai (1993–1999)

slide-11
SLIDE 11

Where did I come from?

In 1999: to Princeton Univ. (25 years old)

slide-12
SLIDE 12

Why did I leave Japan?

  • Because science I wanted to do for my PhD, i.e., to

learn about the beginning of the Universe using the light from the Big Bang, was not possible in Japan in 1999

slide-13
SLIDE 13

Sky in Optical (~0.5μm)

slide-14
SLIDE 14

Sky in Microwave (~1mm)

slide-15
SLIDE 15

Light from the fireball Universe filling our sky (2.7K) The Cosmic Microwave Background (CMB)

Sky in Microwave (~1mm)

slide-16
SLIDE 16

WMAP Science Team

July 19, 2002

  • WMAP was launched on June 30, 2001
  • The WMAP mission ended after 9 years of operation
slide-17
SLIDE 17
slide-18
SLIDE 18
slide-19
SLIDE 19

Outstanding Questions

  • Where does anisotropy in CMB temperature come

from?

  • This is the origin of galaxies, stars, planets, and

everything else we see around us, including

  • urselves
  • The leading idea: quantum fluctuations in

vacuum, stretched to cosmological length scales by a rapid exponential expansion of the universe called “cosmic inflation” in the very early universe

slide-20
SLIDE 20

Our Origin

  • WMAP taught us that

galaxies, stars, planets, and ourselves originated from tiny fluctuations in the early Universe

slide-21
SLIDE 21
slide-22
SLIDE 22

Kosmische Miso Suppe

  • When matter and radiation were hotter than 3000 K,

matter was completely ionised. The Universe was filled with plasma, which behaves just like a soup

  • Think about a Miso soup (if you know what it is).

Imagine throwing Tofus into a Miso soup, while changing the density of Miso

  • And imagine watching how ripples are created and

propagate throughout the soup

slide-23
SLIDE 23
slide-24
SLIDE 24

Outstanding Questions

  • Where does anisotropy in CMB temperature come

from?

  • This is the origin of galaxies, stars, planets, and

everything else we see around us, including

  • urselves
  • The leading idea: quantum fluctuations in

vacuum, stretched to cosmological length scales by a rapid exponential expansion of the universe called “cosmic inflation” in the very early universe

slide-25
SLIDE 25

Data Analysis

  • Decompose temperature

fluctuations in the sky into a set of waves with various wavelengths

  • Make a diagram showing the

strength of each wavelength

slide-26
SLIDE 26

Long Wavelength Short Wavelength 180 degrees/(angle in the sky)

Amplitude of Waves [μK2]

WMAP 9-year Data (2013)

slide-27
SLIDE 27
slide-28
SLIDE 28

Long Wavelength Short Wavelength 180 degrees/(angle in the sky)

Amplitude of Waves [μK2]

WMAP 9-year Data (2013)

Sound waves in the Universe. Predicted by Rashid Sunyaev and others in 1970

slide-29
SLIDE 29

Long Wavelength Short Wavelength

Measuring Abundance of H&He

Amplitude of Waves [μK2]

180 degrees/(angle in the sky)

Density of H&He

slide-30
SLIDE 30
  • We determined the

abundance of various components in the Universe (2003–2013)

  • As a result, we came to

realise that we do not understand 95%

  • f our Universe…

H&He Dark Matter Dark Energy

Cosmic Pie Chart

slide-31
SLIDE 31

Origin of Fluctuations

  • Who dropped those Tofus into the cosmic Miso

soup?

slide-32
SLIDE 32

Leading Idea

  • Quantum Mechanics at work in the early Universe
  • Heisenberg’s Uncertainty Principle:
  • [Energy you can borrow] x [Time you borrow] ~ h
  • Time was very short in the early Universe = You could

borrow a lot of energy

  • Those energies became the origin of fluctuations
  • How did quantum fluctuations on the microscopic scales

become macroscopic fluctuations over cosmological sizes?

Mukhanov & Chibisov (1981); Guth & Pi (1982); Hawking (1982); Starobinsky (1982); Bardeen, Turner & Steinhardt (1983)

slide-33
SLIDE 33

Cosmic Inflation

  • In a tiny fraction of a second, the size of an atomic

nucleus became the size of the Solar System

  • In 10–36 second, space was stretched by at least

a factor of 1026

Starobinsky (1980); Sato (1981); Guth (1981); Linde (1982); Albrecht & Steinhardt (1982)

slide-34
SLIDE 34

Stretching Micro to Macro

Inflation!

Quantum fluctuations on microscopic scales

  • Quantum fluctuations cease to be quantum
  • Become macroscopic, classical fluctuations
slide-35
SLIDE 35

Key Predictions of Inflation

  • Fluctuations we observe today in CMB and

the matter distribution originate from quantum fluctuations generated during inflation

  • There should also be ultra-long-wavelength

gravitational waves generated during inflation

ζ

scalar mode

hij

tensor mode

slide-36
SLIDE 36

We measure distortions in space

  • A distance between two points in space
  • ζ: “curvature perturbation” (scalar mode)
  • Perturbation to the determinant of the spatial metric
  • hij: “gravitational waves” (tensor mode)
  • Perturbation that does not change the determinant (area)

d`2 = a2(t)[1 + 2⇣(x, t)][ij + hij(x, t)]dxidxj

X

i

hii = 0

slide-37
SLIDE 37

Heisenberg’s Uncertainty Principle

  • [Energy you can borrow] x [Time you borrow] =

constant

  • Suppose that the distance between two points

increases in proportion to a(t) [which is called the scale factor] by the expansion of the universe

  • Define the “expansion rate of the universe” as

H ≡ ˙ a a [This has units of 1/time]

slide-38
SLIDE 38

Fluctuations are proportional to H

  • [Energy you can borrow] x [Time you borrow] =

constant

  • Then, both ζ and hij are proportional to H
  • Inflation occurs in 10–36 second - this is such a short

period of time that you can borrow a lot of energy! H during inflation in energy units is 1014 GeV H ≡ ˙ a a [This has units of 1/time]

slide-39
SLIDE 39

Long Wavelength Short Wavelength

180 degrees/(angle in the sky) Amplitude of Waves [μK2]

slide-40
SLIDE 40

180 degrees/(angle in the sky) Amplitude of Waves [μK2]

Long Wavelength Short Wavelength

Removing Ripples: Power Spectrum of Primordial Fluctuations

slide-41
SLIDE 41

180 degrees/(angle in the sky) Amplitude of Waves [μK2]

Long Wavelength Short Wavelength

Removing Ripples: Power Spectrum of Primordial Fluctuations

slide-42
SLIDE 42

180 degrees/(angle in the sky) Amplitude of Waves [μK2]

Long Wavelength Short Wavelength

Removing Ripples: Power Spectrum of Primordial Fluctuations

slide-43
SLIDE 43

180 degrees/(angle in the sky) Amplitude of Waves [μK2]

Long Wavelength Short Wavelength

Let’s parameterise like

Wave Amp. ∝ `ns−1

slide-44
SLIDE 44

180 degrees/(angle in the sky) Amplitude of Waves [μK2]

Long Wavelength Short Wavelength

Wave Amp. ∝ `ns−1

WMAP 9-Year Only [2013]: ns=0.972±0.013 (68%CL)

2001–2010

slide-45
SLIDE 45

South Pole Telescope [10-m in South Pole] Atacama Cosmology Telescope [6-m in Chile]

Amplitude of Waves [μK2]

1000 100

2001–2010

WMAP Collaboration [2013]

slide-46
SLIDE 46

1000 100

South Pole Telescope [10-m in South Pole] Atacama Cosmology Telescope [6-m in Chile]

Amplitude of Waves [μK2]

ns=0.965±0.010

2001–2010

WMAP Collaboration [2013]

slide-47
SLIDE 47

1000 100

South Pole Telescope [10-m in South Pole] Atacama Cosmology Telescope [6-m in Chile]

Amplitude of Waves [μK2]

2001–2010

ns=0.961±0.008

~5σ discovery of ns<1 from the CMB data combined with a galaxy survey data

WMAP Collaboration [2013]

slide-48
SLIDE 48

Residual

Planck 2013 Result!

180 degrees/(angle in the sky)

Amplitude of Waves [μK2]

2009–2013

ESA

slide-49
SLIDE 49

Residual

Planck 2013 Result!

180 degrees/(angle in the sky)

Amplitude of Waves [μK2]

2009–2013

ns=0.960±0.007

First >5σ discovery of ns<1 from the CMB data alone

ESA

slide-50
SLIDE 50

Predicted in 1981. We discovered it finally in 2013

  • Inflation must end
  • Inflation predicts ns~1, but not exactly

equal to 1. Usually ns<1 is expected

  • The discovery of ns<1 has been the

dream of cosmologists since 1992, when the CMB anisotropy was first discovered and ns~1 (to within 30%) was indicated

Slava Mukhanov (LMU) said in his 1981 paper that ns should be less than 1

He was awarded Max Planck Medal in 2015

slide-51
SLIDE 51

How do we know that primordial fluctuations were of quantum mechanical origin?

slide-52
SLIDE 52

[Values of Temperatures in the Sky Minus 2.725 K] / [Root Mean Square]

Fraction of the Number of Pixels Having Those Temperatures Quantum Fluctuations give a Gaussian distribution of temperatures. Do we see this in the WMAP data?

slide-53
SLIDE 53

[Values of Temperatures in the Sky Minus 2.725 K] / [Root Mean Square]

Fraction of the Number of Pixels Having Those Temperatures

YES!!

Histogram: WMAP Data Red Line: Gaussian

slide-54
SLIDE 54

Non-Gaussianity:

A Powerful Test of Quantum Fluctuations

  • The WMAP data show that the distribution of

temperature fluctuations of CMB is very precisely Gaussian

  • with an upper bound on a deviation of 0.2%
  • With improved data provided by the Planck

mission, the upper bound is now 0.03%

slide-55
SLIDE 55

CMB Research: Next Frontier

Primordial Gravitational Waves

Extraordinary claims require extraordinary evidence. The same quantum fluctuations could also generate gravitational waves, and we wish to find them

slide-56
SLIDE 56

Measuring GW

  • GW changes the distances between two points

d`2 = dx2 = X

ij

ijdxidxj d`2 = X

ij

(ij + hij)dxidxj

slide-57
SLIDE 57

Laser Interferometer

Mirror Mirror detector

No signal

slide-58
SLIDE 58

Laser Interferometer

Mirror Mirror

Signal!

detector

slide-59
SLIDE 59

Laser Interferometer

Mirror Mirror

Signal!

detector

slide-60
SLIDE 60

LIGO detected GW from binary blackholes, with the wavelength

  • f thousands of kilometres

But, the primordial GW affecting the CMB has a wavelength of billions of light-years!! How do we find it?

slide-61
SLIDE 61

Detecting GW by CMB

Isotropic electro-magnetic fields

slide-62
SLIDE 62

Detecting GW by CMB

GW propagating in isotropic electro-magnetic fields

slide-63
SLIDE 63

hot hot cold cold c

  • l

d c

  • l

d h

  • t

h

  • t

Detecting GW by CMB

Space is stretched => Wavelength of light is also stretched

slide-64
SLIDE 64

hot hot cold cold c

  • l

d c

  • l

d h

  • t

h

  • t

Detecting GW by CMB Polarisation

electron electron Space is stretched => Wavelength of light is also stretched

slide-65
SLIDE 65

hot hot cold cold c

  • l

d c

  • l

d h

  • t

h

  • t

Detecting GW by CMB Polarisation

Space is stretched => Wavelength of light is also stretched

slide-66
SLIDE 66

horizontally polarised

slide-67
SLIDE 67
slide-68
SLIDE 68

March 17, 2014

BICEP2’s announcement

slide-69
SLIDE 69
slide-70
SLIDE 70
slide-71
SLIDE 71

January 30, 2015

Joint Analysis of BICEP2 data and Planck data

slide-72
SLIDE 72
slide-73
SLIDE 73
  • Planck shows the evidence that the detected

signal is not cosmological, but is due to dust

  • No strong evidence that the detected signal

is cosmological

The search continues!!

Current Situation

1989–1993 2001–2010 2009–2013 202X–

slide-74
SLIDE 74

ESA

2025– [proposed]

JAXA

+ possibly NASA

LiteBIRD

2025– [proposed]

Target uncertainty: 100 times better than the current upper bound on the gravitational wave amplitude

slide-75
SLIDE 75

Summary

  • Left my country to study the beginning of the Universe

using physics and state-of-the-art data

  • With the WMAP team [2001–2013], we:
  • Determined the age and composition of the Universe
  • Found strong evidence for the quantum origin of

cosmic structures

  • Now hoping to find decisive evidence for inflation by

measuring primordial gravitational waves

  • The wavelength of billions of light years!
slide-76
SLIDE 76

If polarisation from GW is found…

  • Then what?
  • The next step is to nail the specific model of

inflation

slide-77
SLIDE 77

Tensor-to-scalar Ratio

  • We really want to find this quantity!

The current upper bound: r<0.07

r ⌘ hhijhiji hζ2i

slide-78
SLIDE 78

WMAP(temp+pol)+ACT+SPT+BAO+H0 WMAP(pol) + Planck + BAO

WMAP Collaboration

ruled

  • ut!