Welland,Ontario Assessing Climate Change Risk to Stormwater and Wastewater Infrastructure Ben Harding, AMEC (Boulder, CO) Peter Nimmrichter, AMEC (Mississauga, ON) Great Lakes Mayors Conference June 16, 2011 1 Outline


slide-1
SLIDE 1

Welland,Ontario Assessing Climate Change Risk to Stormwater and Wastewater Infrastructure

1

Great Lakes Mayors Conference June 16, 2011 Ben Harding, AMEC (Boulder, CO) Peter Nimmrichter, AMEC (Mississauga, ON)

slide-2
SLIDE 2

Outline

2

slide-3
SLIDE 3

Project Overview Who?

Niagara Water Strategy

  • 3
slide-4
SLIDE 4

Project Overview Where?

ONTARIO

4

NEW YORK City of Welland Urban Boundary (approximate)

slide-5
SLIDE 5

Project Overview How? – The PIEVC Protocol

Scoping study completed in March 2007 (Protocol v1) Four infrastructure categories

– buildings – roads and associated structures

5

– roads and associated structures – stormwater and wastewater systems – water resources

Sampling strategy completed 1st national assessment Current Protocol v9 (April 2009)

slide-6
SLIDE 6

Infrastructure of interest? Do we have data? Loads and impacts?

Project Overview How? – The PIEVC Protocol

6

More analyses required? Recommendations

slide-7
SLIDE 7

Project Overview How? – The PIEVC Protocol

Infrastructure Details Site Setting

Step 1 – Project Definition

7 Site Setting Climate Data

slide-8
SLIDE 8

Project Overview How? – The PIEVC Protocol

Judgment on Significance Judgment on Likelihood

Step 2 – Data Gathering

8 Judgment on Likelihood Judgment on Response Judgment on Uncertainty

  • IDF analyses
slide-9
SLIDE 9

Project Overview How? – The PIEVC Protocol

Step 3 – Risk Assessment

Judgement on Significance Judgement on Likelihood 9 Judgement on Likelihood Judgement on Response Judgement on Uncertainty

* Vulnerability assessment workshop

slide-10
SLIDE 10

Step 4 – Engineering Analysis

Existing Load Projected Climate Change Load

Project Overview How? – The PIEVC Protocol

10 Projected Climate Change Load Projected Loads from other changes Existing Capacity Projected Additional Capacity

slide-11
SLIDE 11

Step 5 – Recommendations

Project Overview How? – The PIEVC Protocol

11 Remedial Action Mgmt Action No Action Additional Study Required

slide-12
SLIDE 12

Project Overview What? – The Infrastructure

12

Stormwater Collection System Wastewater / Combined Collection and Treatment System

slide-13
SLIDE 13

Project Overview What? – A Changing Climate

The Long List of Variables:

  • High/Low Temperature
  • Snow Accumulation
  • Heat & Cold Waves
  • Blowing Snow/Blizzard
  • Extreme Diurnal Temperature Variability
  • Lightning