WELCOME! Our Path to Our Permanent Home June 27, 2014 Current - - PowerPoint PPT Presentation

welcome
SMART_READER_LITE
LIVE PREVIEW

WELCOME! Our Path to Our Permanent Home June 27, 2014 Current - - PowerPoint PPT Presentation

WELCOME! Our Path to Our Permanent Home June 27, 2014 Current Facility Outlook FCS SJBA Future Property Criteria GAC requires 4 acres min for our population Minimum 30K square feet Must be zoned M1 for education Must be on


slide-1
SLIDE 1

Our Path to Our Permanent Home

June 27, 2014

WELCOME!

slide-2
SLIDE 2

Current Facility Outlook

FCS SJBA

slide-3
SLIDE 3

Future Property Criteria

  • GAC requires 4 acres min for our population
  • Minimum 30K square feet
  • Must be zoned M1 for education
  • Must be on sewer, septic field takes 1- 2 acres

for drainage

  • Must have adequate parking/traffic flow
slide-4
SLIDE 4

TIMELINE

22222220

2011-2014

Meetings with top Atlanta Catholic Benefactors

2011-2014

Evaluate properties: Design/Build /Lease/Purchase

2011 2013

Real Estate: JB Bader Advisors:Vic Maloof & Mike Weigel

Feasibility Study: Dita Peatross, Architect 2013

slide-5
SLIDE 5

TIMELINE

June 4, 2014

Schematic Plans & Construction Estimates

June 3, 2014

Due Diligence started by John Oliver

June 2, 2014

Contract on H.I.T. Property

slide-6
SLIDE 6

H.I.T. FACILITY

  • 4.4 Acres/15 sq ft, 1 floor
  • 5 years old
  • Three sides brick, back stucco
  • Fully sodded fenced soccer field & playground area
  • Asking price 1.8M, contract 1.4M
  • Build out costs to be rolled into loan after purchase
  • Contract Terms- 90 Day Due Diligence. Financing-

120 days, Close 15 days after.

  • Construction Schedule- 9M, move in Aug 2015
slide-7
SLIDE 7

PROJECT TEAM

Anthony Ferrari

Building Project Manager

Vic Maloof

FAIA, FCMAA, RIBA, FBIA Architect Advisor

Mike Flanigan & Tommy Gravitt

  • Bldg. Consultants

John Oliver

Vice President URS Corporation Due Diligence

Mike Weigel

President

A.M. Weigel Construction Construction Advisor

slide-8
SLIDE 8

DUE DILIGENCE

  • Conceptual Design
  • Civil Engineering Analysis Assessment
  • Alta Land Title Survey
  • Topographical Survey
  • Property Condition Assessment
  • Phase 1 Environmental Assessment
  • Traffic Study
slide-9
SLIDE 9

PROJECT COST

Property $1.4 M Build-out $2-2.4M TOTAL $3.6-3.8M

slide-10
SLIDE 10

FINANCING PLAN

Raise $870K down payment for the project Take a 20 yr loan for the remaining balance

slide-11
SLIDE 11

STRATEGY

  • PARENT COMMITMENT

1

  • CROWDFUNDING

2

slide-12
SLIDE 12
slide-13
SLIDE 13

HOW IT WORKS

  • 870K / 130 FAMILIES = $6,692/FAMILY
  • 130 x 20 = 2600
  • 2600 x $50 = $130K
  • 130 x 135 = 17,550
  • 17,550 x $50 =

1 2 3

$877,500

slide-14
SLIDE 14

SUCCESS STORY

  • Mrs. Kristi Brannen

Founder and Director The Kings Academy Woodstock, GA

slide-15
SLIDE 15
slide-16
SLIDE 16

HOW CAN YOU HELP?

1

  • CONTRIBUTE
  • Donate at least 2K toward the property

2

  • PROMOTE
  • Get our Causevox page to as many as possible

3

  • PRAY
  • Take part in spiritual efforts lead by Maria Smith
slide-17
SLIDE 17

CLOSING

Question & Answer

  • St. John Bosco…Pray for us!