Investing in Roads NOW For our FUTURE
1
WELCOME 1 Road Commission of Kalamazoo County (RCKC): Contact: - - PowerPoint PPT Presentation
Investing in Roads NOW For our FUTURE WELCOME 1 Road Commission of Kalamazoo County (RCKC): Contact: info@kalamazoocountyroads.com, 269-381-3171 Representatives for RCKC Tonight: Joanna I. Johnson, Managing Director Travis Bartholomew,
Investing in Roads NOW For our FUTURE
1
Road Commission of Kalamazoo County (RCKC): Contact: info@kalamazoocountyroads.com, 269-381-3171 Representatives for RCKC Tonight: Joanna I. Johnson, Managing Director Travis Bartholomew, Operations Director Mark Worden, Project Superintendent
2
Representatives for Kalamazoo Township Tonight: Ron Reid, Township Supervisor Don Martin, Trustee Kalamazoo Township: Contact: Donald Martin, Kalamazoo Township martindd@ktwp.org, 269-381-8080
3
Prime Contractor: Rieth Riley Construction Company Collin Klett, Project Manager 269-343-4525 Bill Masura, Estimator/Project Manager Sub-contractors: JL Milling Company Capporosi Construction Company
4
25 Miles of Road Improvements
32,545 Tons of Hot Mix Asphalt (HMA)
220,049 S quare Y ards of Cold Milling
356 Drainage S pillways
87 Drainage S tructures
823 Feet Concrete Curb and Gutter
223 S top S igns Replaced $2,300 ($1,700; 2014)
(RCKC S ign Maint enance Program)
Tree Trimming $2,300 ($1,800; 2014)
(RCKC Roadside Vegetation Maintenance Program)
Brush Removal $7,300 ($3,480; 2014)
(RCKC Brush Cont rol Maint enance Program)
5
Est imat ed Tot al: $3,027,000.00 Final Tot al: $2,700,000.00
Approximately -$327,000 Number of Change Orders 12
S
End Dat e: November 1st S
Not counting requests to the Highway
6
7
8
2015 = 51% Poor 2016 = 33% Poor
1 2 3 4 5 6 7 8 9 10
5.210 4.354 5.093 5.674 5.031 5.150 5.947 5.877 5.279 5.955 5.217 4.484 5.522 5.891 3.461
1 2 3 4 5 6 7 8 9 10
Average PASER Rating by Township
2015 = 4.53 2016 = 5.947
Preventive Maintenance Projects will include treating road surfaces with a combination of spot cold milling, hot mix asphalt (HMA) wedging, crack fill, and chip seal. Rehabilitation Projects will require more extensive repairs, cold milling the entire road surface to a depth of 1-2 inches and replacing it with
Reconstruction Projects require the most work to repair the road. These will require removing 3-4 inches of the existing asphalt pavement and repaving the road with 2 lifts of HMA overlay.
repair;
with materials that will support the new asphalt pavement.
11
12
What year is my road going to be completed? Please refer to the road/ proj ect listing which is also available on the Kalamazoo Township website. How were projects selected? Proj ects were selected based on asset management principles and determining the right fix at the right time within budget. Additional information on asset management can be found on the RCKC website “ Road Data” page. All, local roads could not be completed in one year. What qualifies as a drainage problem? Water standing for 48 hours and that occupies a lane width after a rain
garbage, etc.
13
How will roads selected be maintained? Roads will continue to have routine maintenance activities until
maintenance issues, pothole issues, etc. What is the time frame for 2016 projects to be completed? 2016 proj ects will begin this week with a completion date of October 10.
14
What type of access will be available during construction? Access to your home will be maintained at all times. What will be the hours of construction operations? Hours of construction may be from 7:00am – S unset, Monday – S aturday.
15
What about garbage pick-up and mail delivery? Garbage and mail service will also have access. Can we park on the road/road shoulder? Please do not park on the road or shoulder of the road to allow for construction equipment to safely operate. What about lawn restoration? Please note contractors will be working to restore lawn restoration with drainage repairs. Please be patient as priority work and weather may impact this area.
16
What kind of delays can we expect? Delays may vary based on the construction activity. Please be patient as we will try to minimize the impact to allow safe passage. What about asking for additional work – driveways, etc.? Additional work will not be available by our contractors during road repair.
17
19
WESTWOOD NEIGHBORHOOD AREA
20
EASTWOOD NEIGHBORHOOD AREA
21
NORTHWOOD NEIGHBORHOOD AREA
Sign UP: From your Mobile Phone go to RCKC Website (aut omat ic mobile
From your Computer to RCKC website. Y
Alerts provided to your choice: Emails Home Phone Text Mobile Phone
22
How will we receive updates on construction? Updates will be available on websites, Facebook pages AND RCKC Connect. What is the process for communicating questions? Don Martin for Kalamazoo Township martindd@ktwp.org directly to RCKC office/ RCKC website or by email info@kalamazoocountyroads.com
23
Investing in Roads NOW For our FUTURE
24