Welcome! Please sign in on your mobile device: - - PowerPoint PPT Presentation

welcome
SMART_READER_LITE
LIVE PREVIEW

Welcome! Please sign in on your mobile device: - - PowerPoint PPT Presentation

Orange County Public Schools Deerwood Elementary Replacment Welcome! Please sign in on your mobile device: http://communitymeeting.ocps.net/ 100% Design Community Meeting Deerwood Elementary Replacement March 1, 2018 1 Superintendent Dr.


slide-1
SLIDE 1

Orange County Public Schools

1 Deerwood Elementary Replacment

100% Design Community Meeting Deerwood Elementary Replacement March 1, 2018

Welcome!

Please sign in on your mobile device:

http://communitymeeting.ocps.net/

Superintendent Dr. Barbara Jenkins Chief Facilities Officer John Morris

slide-2
SLIDE 2

Orange County Public Schools

2 Deerwood Elementary Replacment

Deerwood Elementary School Replacement Meeting Agenda

March 1, 2018 6:00 PM

  • Welcome – School Board Member: Daryl Flynn
  • Introductions – Lauren Roth/ Facilities Communications
  • Project Update – Architect:

Contractor: Pirtle Construction Co.

  • Questions and Answers
  • Adjournment
slide-3
SLIDE 3

Orange County Public Schools

3 Deerwood Elementary Replacment

Cypress Springs Elementary North

Surrounding Context

  • S. Econolohatchee Trail

Curry Ford Rd.

Rio Pinar Country CLub Faith Assembly

  • f God

S.R. 417 Deerwood ES Site Lake Underhill Rd.

Rio Pinar Country CLub Eastland Baptist Church Florida Hospital

slide-4
SLIDE 4

Orange County Public Schools

4 Deerwood Elementary Replacment

S . E C O N L O C K H A T C H E E T R A I L O R I E N T E S T R E E T

north

0’ 100 ’

Existing Retention Existing Wetlands Existing Site +/- 18.1 Acres Existing Curb Cuts Existing Curb Cuts North

Site Aerial Map

slide-5
SLIDE 5

Orange County Public Schools

5 Deerwood Elementary Replacment

north 2 STORY 650 STUDENT ELEMENTARY SCHOOL Bus Drop

FRONT DOOR

Service Parent Drop Existing Retention

0’ 100’

S . E C O N L O C K H A T C H E E T R A I L O R I E N T E S T R E E T

Phase Separation Line Retention

Site Plan PHASE 1 – June 2018 – June 2019

Bike Racks Bike Racks

Future Portables

slide-6
SLIDE 6

Orange County Public Schools

6 Deerwood Elementary Replacment

north 2 STORY 650 STUDENT ELEMENTARY SCHOOL Bus Drop

FRONT DOOR

Service Parent Drop Existing Retention

0’ 100’

S . E C O N L O C K H A T C H E E T R A I L O R I E N T E S T R E E T

Retention

Site Plan PHASE 2 – June 2019 – September 2019

Bike Racks Bike Racks

Future Portables Tot Youth Play Field Courts Retention Retention Covered Play New Campus Data 633 student stations 133 paved parking spaces 77,293 square feet 24 unpaved parking spaces 202 car stacking (31%) Planned for 12 Buses Existing Campus 111 paved pkg. spaces 40 unpaved pkg. spaces 52 car stacking 9 Buses

slide-7
SLIDE 7

Orange County Public Schools

9 Deerwood Elementary Replacment

Exterior Elevations

slide-8
SLIDE 8

Orange County Public Schools

10 Deerwood Elementary Replacment

Exterior Elevations

slide-9
SLIDE 9

Orange County Public Schools

11 Deerwood Elementary Replacment

Exterior Elevations

slide-10
SLIDE 10

Orange County Public Schools

12 Deerwood Elementary Replacment

  • ADMIN. RECEPTION
  • ADMIN. RECEPTION

Interior Spaces (example images from previous projects)

LOBBY LOBBY

slide-11
SLIDE 11

Orange County Public Schools

13 Deerwood Elementary Replacment

MUSIC COMPUTER LAB CLASSROOM

Interior Spaces (example images from previous projects)

ART

slide-12
SLIDE 12

Orange County Public Schools

14 Deerwood Elementary Replacment

MUSIC COMPUTER LAB CLASSROOM

Interior Spaces (example images from previous projects)

ART

slide-13
SLIDE 13

Orange County Public Schools

15 Deerwood Elementary Replacment

COVERED PLAY CANOPY

Exterior Elements (example images from previous projects)

PLAY LOTS OUTDOOR COURTS

slide-14
SLIDE 14

Orange County Public Schools

16 Deerwood Elementary Replacment

Sustainability

Site 49-E-W-4 Elementary School is designed to meet Green Globes sustainable building standards. Sustainable Features Include: Site

  • Native/low water plants – reduce water consumption
  • Low Impact Design (LID) stormwater design

Building

  • 10% more energy efficient than ASHRAE 90.1 standard
  • Lighting system and power outlets designed to turn lights and

power off in unoccupied spaces (energy reduction)

  • High Efficiency Chillers (10% energy reduction)
  • Light colored roof to reduce heat gain and improves energy

performance

  • Energy Star rated equipment
  • Water saving toilets, faucets, and fixtures
  • All classrooms have daylighting
  • Over 75% of ALL spaces have daylighting
  • Thermal efficient windows/glazing
slide-15
SLIDE 15

Orange County Public Schools

17 Deerwood Elementary Replacment

  • Hungerford Elementary School Replacement
  • Maxey ES Replacement / Site 207-E-W-7
  • Laureate Park Elementary School
  • Meadow Woods Elementary School Replacement
  • Ventura Elementary School Replacement
  • Bay Lake Elementary School
  • Independence Elementary School
  • Eagle Creek Elementary School
  • John Young Elementary School Replacement
  • Wheatley Elementary School
  • Shingle Creek Elementary School Replacement
  • Prairie Lake Elementary School
  • Sun Blaze Elementary School
  • Sun Ridge Elementary School
  • Forsyth Woods Elementary School
  • Keene's Crossing Elementary School
  • Westbrooke Elementary School
  • Audubon Park Elementary School
  • Sunset Park Elementary School
  • Columbia Elementary School
  • Moss Park Elementary School
  • Catalina Elementary School
  • Wyndham Lakes Elementary School
  • Wolf Lake Elementary School
  • Castle Creek Elementary School
  • Stone Lakes Elementary School
  • Millennia Elementary School
  • Vista Lakes Elementary School
  • Sand Lake Elementary School
  • Whispering Oak Elementary School
  • McCoy Elementary School
  • Andover Elementary School
  • East Lake Elementary School
  • West Oaks Elementary School
  • West Creek Elementary School
  • Dillard Street Elementary School
  • Hiawassee Elementary School
  • Eagle's Nest Elementary School
  • Thornebrooke Elementary School
  • Three Points Elementary School
  • Avalon Elementary School
  • Camelot Elementary School
  • Endeavor Elementary School
  • Citrus Elementary School
  • North Lake Park Community School
  • Riverdale Elementary School
  • Lakeville Elementary School
  • Lawton Chiles Elementary School

PREVIOUS OCPS SCHOOLS USING THE SAME/SIMILAR PROTOTYPE

slide-16
SLIDE 16

Orange County Public Schools

18 Deerwood Elementary Replacment

Schedule

Design, Permitting, Bidding PHASE 1 New Campus Construction (11 Months) May 2019 Sept 2017 June 2018 Sept. 2019 Move-In August 2019 PHASE 2 Demo Existing School Complete Fields & Retention

March 2018

slide-17
SLIDE 17

Orange County Public Schools

19 Deerwood Elementary Replacment

Thank you to the Orange County taxpayers, who make our construction program possible.

Questions?