Water Quality Control on CDOT Projects in the Chatfield Basin CDOT OVERSITE Intense monitoring and inspection conducted during construction Daily sediment and erosion control inspections Bi-Weekly inspections Monthly audits


  1. Water Quality Control on CDOT Projects in the Chatfield Basin

  2. CDOT OVERSITE  Intense monitoring and inspection conducted during construction  Daily sediment and erosion control inspections  Bi-Weekly inspections  Monthly audits

  3. CDOT OVERSITE  After construction is completed, monitoring and inspections continue  Monthly inspections  Inspections continue until project reaches 70% vegetation

  4. In-Active Construction Projects  I-25 - Meadows to Fifth  US 85 – Sedalia Extensions

  5. Active Projects  US 85 Titan to Cook Ranch  I-25 Douglas Lane to 5 th St.

  6. US 85 – Titan to Cook Ranch Project Information  1 mile of reconstruction  Pilot Project where the Contractor holds the stormwater permit  Cross culverts under US 85 with median inlets  Extension of 6 ft x 6 ft CBC

  7. US 85 – Titan to Cook Ranch Temporary BMPs  Slope roughening  Retention ponds  Tracking pads  Blankets  Erosion logs  Silt Fence  Rock checks

  8. US 85 – Titan to Cook Ranch Permanent BMPs  5 Water Quality Ponds  Drainage ditches to water quality ponds  Utilizing an existing pond  Riprap

  9. Slopes Roughened as Work Progresses

  10. Interim Excavations Capture Surface Runoff and Sediment in retention ponds

  11. Tracking Pads for Vehicles Leaving Site

  12. Riprap Placed in Areas of Concentrated Flows as Permanent BMP

  13. CBC Extended and Temporary BMP Installed

  14. Slopes Stabilized with Topsoil, Soil Amendment, Seed and Mulch.

  15. I-25 Douglas Lane to 5 th St. Project Information  Included reconstruction of I-25/Plum Creek Interchange  Most construction is complete  All water quality structures are built and in operation  Final seeding and planting to be done April/May 2010

  16. I-25 Douglas Lane to 5 th St. Project Information  Pipe work for a water quality pond planned for future project incorporated into this project  Pond to be located East of I-25 and East of the Frontage Rd.  Pond to be constructed by CDOT Maintenance in Summer 2010

  17. Sediment Pond at the NE Quadrant of Interchange

  18. Sediment Pond at the SW Quadrant

  19. Outlet Structure West of I-25 at the Southbound on-ramp

  20. Detention Pond that drains into Plum Creek

  21. Riprap along Plum Creek under the I-25 Bridge

  22. Future Projects under Design  I-25 Lincoln to County Line  I-25 at Happy Canyon  US 85 Cook Ranch to Louviers

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.