Water Quality Control on CDOT Projects in the Chatfield Basin CDOT OVERSITE Intense monitoring and inspection conducted during construction Daily sediment and erosion control inspections Bi-Weekly inspections Monthly audits


slide-1
SLIDE 1

Water Quality Control

  • n CDOT Projects

in the Chatfield Basin

slide-2
SLIDE 2

CDOT OVERSITE

 Intense monitoring and inspection

conducted during construction

 Daily sediment and erosion control inspections  Bi-Weekly inspections  Monthly audits

slide-3
SLIDE 3

CDOT OVERSITE

 After construction is completed,

monitoring and inspections continue

 Monthly inspections  Inspections continue until project reaches

70% vegetation

slide-4
SLIDE 4

In-Active Construction Projects

 I-25 - Meadows to Fifth  US 85 – Sedalia Extensions

slide-5
SLIDE 5

Active Projects

 US 85 Titan to Cook Ranch  I-25 Douglas Lane to 5th St.

slide-6
SLIDE 6

US 85 – Titan to Cook Ranch Project Information

 1 mile of reconstruction  Pilot Project where the Contractor holds the

stormwater permit

 Cross culverts under US 85 with median inlets  Extension of 6 ft x 6 ft CBC

slide-7
SLIDE 7

US 85 – Titan to Cook Ranch Temporary BMPs

 Slope roughening  Retention ponds  Tracking pads  Blankets  Erosion logs  Silt Fence  Rock checks

slide-8
SLIDE 8

US 85 – Titan to Cook Ranch Permanent BMPs

 5 Water Quality Ponds  Drainage ditches to water quality ponds  Utilizing an existing pond  Riprap

slide-9
SLIDE 9

Slopes Roughened as Work Progresses

slide-10
SLIDE 10

Interim Excavations Capture Surface Runoff and Sediment in retention ponds

slide-11
SLIDE 11

Tracking Pads for Vehicles Leaving Site

slide-12
SLIDE 12

Riprap Placed in Areas of Concentrated Flows as Permanent BMP

slide-13
SLIDE 13

CBC Extended and Temporary BMP Installed

slide-14
SLIDE 14

Slopes Stabilized with Topsoil, Soil Amendment, Seed and Mulch.

slide-15
SLIDE 15

I-25 Douglas Lane to 5th St. Project Information

 Included reconstruction of I-25/Plum Creek

Interchange

 Most construction is complete  All water quality structures are built and in

  • peration

 Final seeding and planting to be done April/May

2010

slide-16
SLIDE 16

I-25 Douglas Lane to 5th St. Project Information

 Pipe work for a water quality pond planned for

future project incorporated into this project

 Pond to be located East of I-25 and East of the

Frontage Rd.

 Pond to be constructed by CDOT Maintenance in

Summer 2010

slide-17
SLIDE 17

Sediment Pond at the NE Quadrant of Interchange

slide-18
SLIDE 18

Sediment Pond at the SW Quadrant

slide-19
SLIDE 19

Outlet Structure West of I-25 at the Southbound on-ramp

slide-20
SLIDE 20

Detention Pond that drains into Plum Creek

slide-21
SLIDE 21

Riprap along Plum Creek under the I-25 Bridge

slide-22
SLIDE 22

Future Projects under Design

 I-25 Lincoln to County Line  I-25 at Happy Canyon  US 85 Cook Ranch to Louviers