VENTILATE FACADE | HISTORY In the early 50s the Building Research - - PowerPoint PPT Presentation

ventilate facade history in the early 50s the building
SMART_READER_LITE
LIVE PREVIEW

VENTILATE FACADE | HISTORY In the early 50s the Building Research - - PowerPoint PPT Presentation

VENTILATE FACADE | HISTORY In the early 50s the Building Research Station in UK showed the advantages of having a ventilated cavity in front of the building wall. Alcoa Building (1951|1953|PITTSBURGH|PENNSYLVANIA ) VENTILATE FACADE | BENEFITS


slide-1
SLIDE 1
slide-2
SLIDE 2
slide-3
SLIDE 3
slide-4
SLIDE 4
slide-5
SLIDE 5
slide-6
SLIDE 6

VENTILATE FACADE | HISTORY In the early 50s the Building Research Station in UK showed the advantages of having a ventilated cavity in front of the building wall.

Alcoa Building (1951|1953|PITTSBURGH|PENNSYLVANIA)

slide-7
SLIDE 7

VENTILATE FACADE | BENEFITS The building wall is protected from the hot radiation in summer The chimney effect generates ventilation that make the temperature decrease The air cavity is a thermal intermediate between the internal and external sides The panels protect the walls from the bad weather conditions

slide-8
SLIDE 8

MEG FIXING SYSTEMS | Visible mechanical fixing on an aluminium backing structure

slide-9
SLIDE 9

MEG FIXING SYSTEMS | Invisible fixing with overlapping panel strips (weatherboarding or lap siding)

slide-10
SLIDE 10

MEG FIXING SYSTEMS | Invisible fixing with profiled edged panels in horizontal running aluminium hook profile

slide-11
SLIDE 11

MEG FIXING SYSTEMS | Invisible fixing with profiled edged panels in horizontal running aluminium hook profile

slide-12
SLIDE 12

MEG FIXING SYSTEMS | Gluing on aluminium substructure

slide-13
SLIDE 13

MEG | CREATE A VENTILATE FACADE

  • Dynamic wind strenght
  • Distance from MEG panels
  • Calculate panel expansion with fix and movable fixing
  • Air cavity behind the panels
  • Measure the size of the panels for the layout of your facades
  • Calculate the isolation materials tickness
  • Vertical aluminium sub-structure dilatation.
  • Anchoring in the proper way the aluminium or wood structure to the existing building
slide-14
SLIDE 14

MEG | FIXED POINT The «FIXED POINT» must be placed in the centre of every MEG panels in order to not allow further changes of position.

slide-15
SLIDE 15

MEG | ISOLATING MATERIAL Rock Wool Glass Wool Polystyrene extruded Polystyrene extruded with graphite Structural polyurethane

slide-16
SLIDE 16

MEG | Casa O |2015|CAGLIARI|ITALY

slide-17
SLIDE 17

MEG | Casa O |2015|CAGLIARI|ITALY

slide-18
SLIDE 18

MEG | TRAIN STATION |2012|KOKSIJDE|BELGIO

slide-19
SLIDE 19

MEG | TRAIN STATION |2012|KOKSIJDE|BELGIUM

slide-20
SLIDE 20

MEG | TRAIN STATION |2012|KOKSIJDE|BELGIUM

slide-21
SLIDE 21

MEG | Triennale |2009|INCHEON|SOUTH KOREA

slide-22
SLIDE 22

MEG | Triennale |2009|INCHEON|SOUTH KOREA

slide-23
SLIDE 23

MEG |Tuincentrum Pelckmans | 2010|TURNHOUT|BELGIUM

slide-24
SLIDE 24

MEG |Tuincentrum Pelckmans | 2010|TURNHOUT|BELGIUM

slide-25
SLIDE 25

MEG |“Nest” Casa Clima |2011|CERVIA|ITALY

slide-26
SLIDE 26

MEG |“Nest” Casa Clima |2011|CERVIA|ITALY

slide-27
SLIDE 27

MEG| RESIDENCE TASSIN |2014|FRANCE

slide-28
SLIDE 28

MEG| RESIDENCE TASSIN |2014|FRANCE

slide-29
SLIDE 29

MEG| SCHOOL | 2013|DANZICA|POLAND

slide-30
SLIDE 30

MEG| ABET PARK | 2013|CHAMBERY|FRANCE

slide-31
SLIDE 31

MEG|MUSEO ABET LAMINATI|2013|BRA|ITALY

slide-32
SLIDE 32

MEG|MUSEO ABET LAMINATI|2013|BRA|ITALY

slide-33
SLIDE 33

MEG|BRABBEL SCHOOL|2010|BELGIUM

slide-34
SLIDE 34

MEG|DE ZEVEN TORENTJES HOSPITAL | 2011|BRUGES|BELGIUM

slide-35
SLIDE 35

MEG|DE ZEVEN TORENTJES HOSPITAL | 2011|BRUGES|BELGIUM

slide-36
SLIDE 36

MEG|RESIDENTIAL BUILDING|2014|LEBANON

slide-37
SLIDE 37

MEG|RESIDENTIAL BUILDING|2015|LEBANON

slide-38
SLIDE 38

MEG|RESIDENTIAL BUILDING|2013|LEBANON

slide-39
SLIDE 39

MEG|JOSEPH SFEIR CENTER|2014|LEBANON

slide-40
SLIDE 40

www.abet-laminati.it 40

APPLICAZIONI