VALLEY LLEY SK SKATEP TEPARK ARK DESI SIGN REVE VEAL AL OPEN HO HOUSE SE December 5, 2019 AGENDA 1. Project Introduction 2. Project Timeline 3. Site Analysis 4. Community Consultations 5. Valley Skatepark Design 6. Addressing


slide-1
SLIDE 1

VALLEY LLEY SK SKATEP TEPARK ARK

DESI SIGN REVE VEAL AL OPEN HO HOUSE SE

December 5, 2019

slide-2
SLIDE 2

AGENDA

1. Project Introduction 2. Project Timeline 3. Site Analysis 4. Community Consultations 5. Valley Skatepark Design 6. Addressing Community Concerns 7. Next Steps

slide-3
SLIDE 3

PROJECT INTRODUCTION

  • Skateboard Park Study (2017) identified a deficiency of skateparks in the city for

wheeled sports

  • Valley Park was one of the top scoring sites within the study
  • The new facility will be multi-wheeled
  • First of 3 potential new parks - providing more spaces to keep healthy and active
  • Approximate estimated $1,650,000 construction budget
slide-4
SLIDE 4

VISION

Located in Valley Park in Hamilton’s Stoney Creek neighbourhood, Valley Skate Park will be the City’s newest action sports facility and the first community skate park designed to accommodate a variety of wheeled sports, including skateboards, BMX bikes, in-line skates and scooters. It will become a new gathering space for all ages and rider levels to practice their best tricks, as well as a place for the community to keep healthy and active.

slide-5
SLIDE 5

PROJECT INTRODUCTION & TIMELINE

Investigation

1

Design Alternatives

2

Concept Design & Budget

3

FEB 2018 Information Session AUG 2018 Project Kick-Off & Site Walk OCT 2018 Geotechnical Report SEPT 2018 Site Inventory & Analysis OCT 2018 Preliminary Budget OCT 2018 Community Design Workshop NOV 2018 Development of 3 Design Alternatives DEC 2018 Internal Review Meeting JAN 2019 Community Design Alternatives Open House FEB 2019 Preferred Design Direction MAR 2019 Design Development MAR 2019 Community Survey

DEC 2019 Public Information Centre

DEC 2019 Function Plan & Cost Estimate

slide-6
SLIDE 6

SI SITE TE AN ANAL ALYSIS YSIS

slide-7
SLIDE 7

SITE ANALYSIS

Amenities & Circulation

slide-8
SLIDE 8

SITE ANALYSIS

Topography & Surface Water Flows

slide-9
SLIDE 9

COMM MMUNITY NITY CONSUL SULTATI TIONS ONS

slide-10
SLIDE 10

INFORMATION SESSION – Winter 2018

  • Supportive comments on

the design considerations for Valley Skatepark

slide-11
SLIDE 11

COMMUNITY DESIGN WORKSHOP # 1 – FALL 2018

Base Plans & Analysis Panels Dotmocracy 3D Site Modelling Feedback Form Online Survey

WORKSHOP ACTIVITIES

slide-12
SLIDE 12

WHAT WE HEARD

  • Unique design
  • Preference for large bowls and transition terrain

features; in particular the flow bowl

  • Inclusion of a Snake Run
  • Kids/ Beginner Programming
  • Other features: custom skateable art, gaps, fun-box

features, curved vertical walls, euro gap, vert ramping, pool copping

  • Need for site amenities; sitting area, water fountain,

bike rack, shade, sport lighting and pedestrian lighting

slide-13
SLIDE 13

COMMUNITY DESIGN WORKSHOP # 2 – WINTER 2019

WORKSHOP ACTIVITIES

Feedback Form Online Survey

slide-14
SLIDE 14

COMMUNITY DESIGN WORKSHOP # 2 – WINTER 2019

ALTERNATIVE 1 ALTERNATIVE 2 ALTERNATIVE 3

slide-15
SLIDE 15

ALTERNATIVE 1

WHAT WE HEARD

slide-16
SLIDE 16

ALTERNATIVE 2

WHAT WE HEARD

slide-17
SLIDE 17

ALTERNATIVE 3

WHAT WE HEARD

slide-18
SLIDE 18

VAL ALLEY LEY SK SKATEP TEPARK RK DES ESIGN IGN

slide-19
SLIDE 19

VALLEY PARK COMMUNITY CENTRE

5m 10m 20m 40m 70m

MASTERPLAN

slide-20
SLIDE 20

5m 10m 20m 40m 70m

MASTERPLAN

  • East-west pedestrian

connection

  • 5 Entry points
  • 3 Gathering areas with

seating

  • Water fountain
  • 5 Naturalized areas /

stormwater management

slide-21
SLIDE 21

PRECEDENTS

SHADE STRUCTURE VEGETATION SHADE STRUTURE AND SKATEPARK LIGHTING

slide-22
SLIDE 22

SKATEPARK PLAN

slide-23
SLIDE 23

Valley Skatepark Renderings

slide-24
SLIDE 24

Valley Skatepark Renderings

slide-25
SLIDE 25

Valley Skatepark Renderings

slide-26
SLIDE 26

Valley Skatepark Renderings

slide-27
SLIDE 27

Valley Skatepark Renderings

slide-28
SLIDE 28

Valley Skatepark Renderings

slide-29
SLIDE 29

Valley Skatepark Renderings

slide-30
SLIDE 30

Valley Skatepark Renderings

slide-31
SLIDE 31

Valley Skatepark Renderings

slide-32
SLIDE 32

Valley Skatepark Renderings

slide-33
SLIDE 33

AD ADDRES RESSING SING COMM MMUNITY NITY CONCERNS ERNS

slide-34
SLIDE 34

STREET ART WALL & PANEL PRECEDENTS

slide-35
SLIDE 35
slide-36
SLIDE 36

SPORT LIGHTING PRECEDENTS

slide-37
SLIDE 37

PROJECT INTRODUCTION & TIMELINE

Investigation

1

Design Alternatives

2

Concept Design & Budget

3

FEB 2018 Information Session AUG 2018 Project Kick-Off & Site Walk OCT 2018 Geotechnical Report SEPT 2018 Site Inventory & Analysis OCT 2018 Preliminary Budget OCT 2018 Community Design Workshop NOV 2018 Development of 3 Design Alternatives DEC 2018 Internal Review Meeting JAN 2019 Community Design Alternatives Open House FEB 2019 Preferred Design Direction MAR 2019 Design Development MA 2019 Community Survey

DEC 2019 Public Information Centre

DEC 2019 Function Plan & Cost Estimate

slide-38
SLIDE 38

QUEST ESTION IONS? S?

slide-39
SLIDE 39

TH THAN ANK K YOU!