US 150 Pre limina ry E ng ine e ring Ne lso n & Wa shing to n - - PowerPoint PPT Presentation

us 150 pre limina ry e ng ine e ring ne lso n amp wa
SMART_READER_LITE
LIVE PREVIEW

US 150 Pre limina ry E ng ine e ring Ne lso n & Wa shing to n - - PowerPoint PPT Presentation

US 150 Pre limina ry E ng ine e ring Ne lso n & Wa shing to n Co untie s Pub lic Me e ting K YT C I te m No . 4-396.00/ .10/ .20/ .30 Wa shing to n Co unty Ne lso n Co unty April 9, 2019 April 23, 2019 We lc o me Go a ls fo r T o


slide-1
SLIDE 1

US 150 Pre limina ry E ng ine e ring Ne lso n & Wa shing to n Co untie s

Pub lic Me e ting K YT C I te m No . 4-396.00/ .10/ .20/ .30

Wa shing to n Co unty Ne lso n Co unty April 9, 2019 April 23, 2019

slide-2
SLIDE 2

We lc o me

Go a ls fo r T

  • da y’ s Me e ting

 Pro vide a n upda te o n Pro je c t Sta tus  De sc rib e Alte rna tive s c urre ntly b e ing

c o nside re d fo r I mpro ving US 150

 Pro vide a n o ppo rtunity to c o mme nt a nd

disc uss a lte rna tive s

 WE

NE E D YOUR I NPUT

slide-3
SLIDE 3

Pro je c t L imits

Wa shing to n Co unty

 Just We st o f US 150 Bypa ss (MP 5.870) to Ne lso n /

Wa shing to n Co unty L ine (MP 0.426) Ne lso n Co unty

 Just We st o f the Ne lso n / Wa shing to n Co unty L

ine (MP 7.426) to ne a r Pa rkwa y Drive (MP 2.334)

slide-4
SLIDE 4

Ba c kg ro und US 150 Sc o ping Study – F ina l Re po rt Nelso n & Washingto n Co unties, De c e mb e r 2015

 Summa ry o f E

xisting Co nditio ns

 Ro a dwa y Ge o me tric Cha ra c te ristic s  E

xisting T ra ffic Vo lume s (2014 Da ta )

 T

ra ffic F

  • re c a st Da ta – 2035

 Upda te d T

ra ffic F

  • re c a st Da ta -- 2040

 Cra sh Histo ry Da ta (2010 to 2014)

 E

nviro nme nta l Ove rvie w

 Ge o te c hnic a l Ove rvie w  Pub lic a nd Sta ke ho lde r Co o rdina tio n

 Pub lic Me e ting s  Ne lso n Co unty – Ma y 26, 2015  Wa shing to n Co unty – Ma y 28, 2015

 Re c o mme nde d I

mpro ve me nts

slide-5
SLIDE 5

Pro je c t Purpo se a nd Ne e d

T he purpo se o f the US 150 I mpro ve me nt Pro je c t is to e nha nc e lo c a l a nd re g io na l mo b ility, inc re a se c a pa c ity whe re ne c e ssa ry, a nd to pro vide a sa fe r, mo re e ffic ie nt c o nne c tio n b e twe e n the Blue g ra ss Pa rkwa y a nd Spring fie ld, K Y.

slide-6
SLIDE 6

E xisting Co nditio ns

T wo L a ne Ro a dwa y

11- to 12-fo o t L a ne s

Na rro w Sho ulde rs

Ave ra g e Da ily T ra ffic –

Ne lso n Co . 9,100 to 13,900

Wa shing to n Co . 6,800 to 8,800

T ruc k Pe rc e nta g e s

Ne lso n Co . 14.5% to 19.0%

Wa shing to n Co .– 13.2% to 15.7%

Cra sh Histo ry (2010 – 2014)

slide-7
SLIDE 7

F uture T ra ffic

Ne lso n Co unty - 2040

Ave ra g e Da ily T ra ffic – 11,000 to 17,000

T ruc k Pe rc e nta g e s –14.5% to 19.0%

Wa shing to n Co unty - 2035

Ave ra g e Da ily T ra ffic – 7,000 to 13,000

T ruc k Pe rc e nta g e s – 13.2% to 15.7%

slide-8
SLIDE 8

Alte rna tive s Co nside re d

 Ne lso n Co unty

 I

mpro ve me nts to e xisting US 150 Co rrido r

 Ne w Alig nme nts -- No rth a nd So uth o f E

xisting US 150

 Wa shing to n Co unty

 Wide ning / Add Pa ssing L

a ne s a nd Sho ulde rs to E xisting US 150

 I

mpro ve me nts a t I nte rse c tio n with Grundy Ho me Ro a d

slide-9
SLIDE 9

Ra ng e o f T ypic a l Se c tio ns

▪ A Ra ng e o f T

ypic a l Se c tio ns a re pro po se d to a c c o mmo da te c urre nt a nd future tra ffic vo lume s a nd to minimize impa c ts to se nsitive e nviro nme nta l re so urc e s. T he se I nc lude :

▪ 5-L

a ne Rura l

▪ 4-L

a ne Divide d Ro a dwa y

▪ 2+1 (2 L

a ne s + Pa ssing L a ne )

▪ I

mpro ve d 2-L a ne Ro a dwa y

slide-10
SLIDE 10

Ra ng e o f T ypic a l Se c tio ns

▪ 5-L

a ne Urb a n

▪ 3-L

a ne Urb a n

▪ Alte rna tive s in Ne lso n Co unty will use a c o mb ina tio n o f

the se typic a l se c tio ns to a ddre ss c ha ng e s in tra ffic vo lume s, truc k pe rc e nta g e s, a vo iding se nsitive e nviro nme nta l c o nstra ints, a nd a lso in a n initia l / ultima te c o nstruc tio n sc e na rio .

slide-11
SLIDE 11

Ne lso n Co unty, US 150 Displa y Bo a rds

Be g inning just e a st o f the Blue g ra ss Pa rkwa y (MP 2.334) to just we st o f the Wa shing to n-Ne lso n Co unty L ine (MP 7.426) a t the Be e c h F

  • rk Rive r.

 Alte rna tive s Co nside re d

 Alte rna tive 1 (Re d )  Alte rna tive 2 (Ye llo w)  Alte rna tive 3 (Ma g e nta )  Alte rna tive 4 (Gre e n)

slide-12
SLIDE 12

T ypic a l Se c tio ns Pro po se d F

  • r

E a c h Alte rna tive

 Alte rna tive 1 (Re d) – Impro ve me nts to E

xisting US 150

5-L ane Rural T ypic al Se c tion – Parkway Drive to KY 605 N

5-L ane Urban T ypic al Se c tion – KY 605 N to KY 605 S

3 L ane Urban Se c tion -- KY 605 S to Botland L

  • op E

2+1 ( 2 lane s + Passing lane ) -- Botland L

  • op E

to Be e c h F

  • rk Rive r

 Alte rna tive 2 (Ye llo w) – Ne w Alig nme nt No rth o f E

xisting US 150

4-L ane Divide d Roadway – Parkway Drive to KY 605 N

2+1 (2 lane s + Passing lane ) Initial / 4-L ane Divide d Roadway Ultimate – Parkway Drive to E xisting US 150 ne ar Mc Intyre L ane

2+1 (2 lane s + Passing lane ) – Mc Intyre L ane to Be e c h F

  • rk Rive r along E

xisting US 150 Alignme nt

 Alte rna tive 3 (Ma g e nta ) – Ne w Alig nme nt No rth a nd So uth o f E

xisting US 150

4-lane Divide d Roadway – Parkway Drive to KY 605 N

2+1 (2 lane s + Passing lane ) Initial / 4-L ane Divide d Roadway Ultimate – KY 605 N to Be e c h F

  • rk

Rive r

 Alte rna tive 4 (Gre e n) – Co mb ina tio n o f Impro ving E

xisting US 150 a nd Ne w Alig nme nt

5-L ane Rural T ypic al Se c tion – Parkway Drive to Mill Cre e k L ane along E xisting US150

4-L ane Divide d Roadway – Mill Cre e k L ane to KY 605 N Approac h on Ne w Alignme nt

2+1 (2 lane s + Passing L ane ) Initial / 4-L ane Divide d Roadway Ultimate – KY 605 N Approac h to Be e c h F

  • rk Rive r on Ne w Alignme nt
slide-13
SLIDE 13

Co mpa riso n Ma trix Ne lso n Co unty

slide-14
SLIDE 14

Displa y Bo a rds fo r De sig n Se c tio ns in Wa shing to n Co unty

▪ F

ro m F re de ric kto wn Ro a d to Ma yfie ld L a ne

▪ F

ro m Ma yfie ld L a ne to US 150 Bypa ss

slide-15
SLIDE 15

Co mpa riso n Ma tric e s Wa shing to n Co unty

slide-16
SLIDE 16

Ha ndo ut

slide-17
SLIDE 17

Que stio nna ire

slide-18
SLIDE 18

Wha t Ha ppe ns Ne xt?

 Pro je c t T

e a m Me e ting – I de ntify Pre limina ry Pre fe rre d Alte rna tive s

 Wa shing to n Co unty: Summe r 2019  Ne lso n Co unty: F

a ll 2019

 Co mple te E

nviro nme nta l Do c ume nta tio n

 Wa shing to n Co unty: F

a ll 2019

 Ne lso n Co unty: Spring 2020

 F

urthe r Pub lic I nvo lve me nt a nd Ne xt Ste ps:

 Wa shing to n Co unty:  Ma ile r a dvising o f a lte rna tive se le c tio n: F

a ll 2019

 Be g in F

ina l De sig n: F a ll 2019

 Ne lso n Co unty:  Pub lic Me e ting : F

a ll 2019 to ide ntify a Pre fe rre d Alte rna tive

 F

ina l De sig n Co nting e nt Upo n Additio na l F unding in Ne xt Six-Ye a r Ro a d Pla n

slide-19
SLIDE 19

T his pre se nta tio n will b e g in a g a in in 60 se c o nds.