Presentation to New York New Visions at the Center for Architecture Urban Design Frontage at the World Trade Center January 25, 2011 NEW YORK STATE STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION Marie A. Corrado Andrew M. Cuomo Stanley Gee


slide-1
SLIDE 1

January 25, 2011

Urban Design Frontage at the World Trade Center Presentation to New York New Visions at the Center for Architecture

NEW YORK STATE DEPARTMENT OF TRANSPORTATION

Phillip Eng, P.E. Regional Director Joseph T. Brown, P.E. Project Director, 9A Stanley Gee Acting Commissioner

STATE OF NEW YORK

Andrew M. Cuomo Governor Marie A. Corrado Director, Major Projects

slide-2
SLIDE 2

01.25.2011

Urban Design Frontage at the World Trade Center 2

BATTERY PL. TO 59TH ST.

WTC SITE

*

WFC

slide-3
SLIDE 3

BACKGROUND

slide-4
SLIDE 4

01.25.2011

Urban Design Frontage at the World Trade Center 4

DISTRICTS ALONG 9A CORRIDOR

Clinton Hells Kitchen Chelsea

  • W. Village

SOHO Tribeca WTC Battery Park City Hudson River Park MPD

slide-5
SLIDE 5

01.25.2011

Urban Design Frontage at the World Trade Center 5

ROUTE 9A WEST STREET PROMENADE

WTC DISTRICT

slide-6
SLIDE 6

01.25.2011

Urban Design Frontage at the World Trade Center 6

NYC’S VISION FOR LOWER MANHATTAN

ROUTE 9A

slide-7
SLIDE 7

01.25.2011

Urban Design Frontage at the World Trade Center 7

ROUTE 9A URBAN DESIGN: PROJECT GOALS

  • Permanently restore the functionality of Route 9A
  • Improve pedestrian movements along and across Route 9A
  • Provide for an appropriate and respectful setting for the WTC Memorial
  • Enhance green areas and open space
  • Support economic recovery and development of Lower Manhattan
  • Ensure community involvement and public participation in an open and inclusive process
  • Coordinate with other major transportation and development projects
  • Avoid or minimize environmental and construction impacts to the community
  • Provide a safe, timely and cost effective transportation solution
slide-8
SLIDE 8

01.25.2011

Urban Design Frontage at the World Trade Center 8

ROUTE 9A URBAN DESIGN

slide-9
SLIDE 9

STATUS

slide-10
SLIDE 10

01.25.2011

Urban Design Frontage at the World Trade Center 10

ROUTE 9A PROMENADE PROJECT STATUS

GOLDMAN SACHS 3 WFC VERIZON 1 WTC 2 WFC 1 WFC MEMORIAL VSC

Completed

MURRAY ST.

Dog Run

  • W. Thames Park

WSU

9A South of Albany/

  • W. Thames Park

9A at WTC Site / WFC Finish 9A in Stages 2014 +/-

9A North of Vesey / Goldman

Completed

PROMENADE SOUTH PROJECT

(Completed)

ROUTE 9A / WEST STEET PROMENADE PROJECT 1 WTC NATIONAL SEPTEMBER 11 MEMORIAL & MUSEUM VSC 2 WFC 1 WFC 3 WFC 9A (SB) 9A (NB)

slide-11
SLIDE 11

01.25.2011

Urban Design Frontage at the World Trade Center 11

  • 1. National September 11 Memorial and Museum (Memorial)
  • 2. World Trade Center (WTC) District
  • 3. World Financial Center (WFC)
  • 4. Goldman Sachs
  • 5. West Thames Park
  • 6. 90 West Street
  • 7. Verizon
  • 8. Battery Park Underpass

1 2 3 4 7 6 5 8

ROUTE 9A FRONTAGES

slide-12
SLIDE 12

01.25.2011

Urban Design Frontage at the World Trade Center 12

WTC PROJECTS IMPACT ZONES IN ROUTE 9A

RWL Discharge 3 WFC 2 WFC 1 WFC VSC VERIZON NATIONAL SEPTEMBER 11 MEMORIAL & MUSEUM

WTC Site/BPCA Projects Working in Route 9A

BPCA Pile Cap Rehab

1 WTC WTC STREETS

= VSC

2 WFC Driveway

PAVILION GOLDMAN SACHS

= Memorial = 1 WTC

Legend: MEMORIAL PLAZA

= Pending 9A Curblines

Note: Pending Route 9A work requires continuous coordination with WTC Site Projects for staging and construction access.

= WTC Streets = Chiller Plant/RWL = Other Projects

South Projection

CONCOURSE

BPCA Bridge Extension

= Concourse & Vesey Bridge

ROUTE E 9A

North Projection

78” Sewer Blast Protection

Vesey Bridge Chiller Plant

slide-13
SLIDE 13

01.25.2011

Urban Design Frontage at the World Trade Center 13

ROUTE 9A AT THE WORLD TRADE CENTER SITE

= Temporary 9A Pavement

Pending Route 9A Curblines with Permanent & Temporary Pavement

3 WFC 2 WFC 1 WFC VSC VERIZON NATIONAL SEPTEMBER 11 MEMORIAL & MUSEUM 1 WTC Legend:

= Pending 9A Curblines = Permanent 9A Pavement

ROUTE 9A SB ROUTE 9A NB GOLDMAN SACHS 90 WEST ST .

slide-14
SLIDE 14

01.25.2011

Urban Design Frontage at the World Trade Center 14

VESEY STREET PEDESTRIAN BRIDGE View North from Liberty Street 1 WTC WTC SITE WFC ROUTE 9A (NB) ROUTE 9A (SB)

slide-15
SLIDE 15

01.25.2011

Urban Design Frontage at the World Trade Center 15

PEDESTRIAN CROSSINGS

  • Wider, distinctive colorized crosswalks
  • Re-establish Liberty and Vesey Street at-grade crossings
  • New 30 foot crosswalk at Fulton Street
  • Improve signage and signalization
  • Retain / Improve three pedestrian bridges
  • New underground Pedestrian Concourse (PANYNJ)

= Crosswalks = Pedestrian Bridges = Pedestrian Concourse

slide-16
SLIDE 16

01.25.2011

Urban Design Frontage at the World Trade Center 16

NYSDOT ROUTE 9A PENDING WORK ADJACENT TO WFC & WTC SITES

3 WFC 1 WTC 2 WFC 1 WFC NATIONAL SEPTEMBER 11 MEMORIAL & MUSEUM VSC VERIZON

1

Pavilion

18 23 11

BPC Pile Rehab

2 14 21 22

2 WFC Driveway

15

RWL Discharge

13

ROUTE E 9A

8 4 5 19 7

Vesey Bridge

South Projection

24 12 20 17

North Projection

6

CONCOURSE

10 9 25 25 25 3 11 11 13 16

Chiller Plant

1) BPCA Liberty Bridge Extension 2) Temp. Pedestrian Bridge Removal 3) Liberty Bridge Pier Removal and NB Pavement 4) VSC Frontage / NB Roadway 5) 90 West Street Frontage 6) Memorial Access 7) 9A Crosswalk at Liberty Street 8) 1 WFC Frontage and Median 9) Cedar St. Intersection Tie-In 10) Liberty St. Intersection Tie-In 11) Temporary or Permanent Utilities for 9/11 Memorial 10th Anniversary 12) Undercut, Lightweight Fill, Utilities, POE’s, Raise Grade, Paving etc. at Memorial Frontage 13) Memorial Frontage (bollards, irrigation, trench drains, trees, pavers) 14) 2 WFC Driveway Removal & 2 WFC Frontage & Median 15) 9A (All features) and Fulton Sewer at Concourse Crossing 16) Fulton Street Intersection Tie-In 17) Vesey Sewer, Utilities, POEs (on-going) 18) Vesey North Crosswalk Opening 19) Vesey Bridge Removal 20) North Chamber Slab Lowering 21) 9A – All Features 22) 3 WFC Frontage and Median 23) 1 WTC Frontage 24) Vesey Street Intersection Tie-In 25) 78” Interceptor Sewer Lining

slide-17
SLIDE 17

WORLD FINANCIAL CENTER

slide-18
SLIDE 18

01.25.2011

Urban Design Frontage at the World Trade Center 18

WORLD FINANCIAL CENTER FRONTAGE

1 WFC 2 WFC 3 WFC

9A Southbound

Conceptual Plan Aerial Photo

1 WFC 2 WFC 3 WFC

9A Southbound 9A Northbound 1 WTC NATIONAL SEPTEMBER 11 MEMORIAL & MUSEUM VSC

slide-19
SLIDE 19

01.25.2011

Urban Design Frontage at the World Trade Center 19

WORLD FINANCIAL CENTER FRONTAGE

2 WFC 3 WFC

World Financial Center Frontage

1 WFC

1 WFC Conceptual Plan

ROUTE 9A SOUTHBOUND

slide-20
SLIDE 20

01.25.2011

Urban Design Frontage at the World Trade Center 20

WORLD FINANCIAL CENTER FRONTAGE 1 WFC (Perspective View South at Liberty Street)

slide-21
SLIDE 21

01.25.2011

Urban Design Frontage at the World Trade Center 21

WORLD FINANCIAL CENTER FRONTAGE 1 WFC (Perspective View North at Albany Street) 1 WTC MEMORIAL

slide-22
SLIDE 22

01.25.2011

Urban Design Frontage at the World Trade Center 22

WORLD FINANCIAL CENTER FRONTAGE 1 WFC

Current Conditions Proposed Rendering Retaining Wall with 3” Cap Elevation

3”

slide-23
SLIDE 23

01.25.2011

Urban Design Frontage at the World Trade Center 23

WORLD FINANCIAL CENTER FRONTAGE 2 WFC Conceptual Plan

2 WFC 3 WFC

World Financial Center Frontage

1 WFC ROUTE 9A SOUTHBOUND

slide-24
SLIDE 24

01.25.2011

Urban Design Frontage at the World Trade Center 24

WORLD FINANCIAL CENTER FRONTAGE 2 WFC (Perspective View North at Liberty Street) 1 WTC

slide-25
SLIDE 25

01.25.2011

Urban Design Frontage at the World Trade Center 25

WORLD FINANCIAL CENTER FRONTAGE 3 WFC Conceptual Plan

2 WFC 3 WFC 1 WFC ROUTE 9A SOUTHBOUND

slide-26
SLIDE 26

01.25.2011

Urban Design Frontage at the World Trade Center 26

ROUTE 9A PLANTED MEDIANS NORTH OF VESEY STREET

slide-27
SLIDE 27

WORLD TRADE CENTER

slide-28
SLIDE 28

01.25.2011

Urban Design Frontage at the World Trade Center 28

ROUTE 9A AT THE WTC SITE ROUTE 9A (NB)

NATIONAL SEPTEMBER 11 MEMORIAL & MUSEUM 1 WTC VSC

ROUTE 9A (SB) WFC

9A R.O.W.

slide-29
SLIDE 29

01.25.2011

Urban Design Frontage at the World Trade Center 29

SECTION VIEW NORTH AT WFC AND WTC SITE

MEMORIAL WFC

SIDEWALK

2 WFC NATIONAL SEPTEMBER 11 MEMORIAL & MUSEUM 1 WFC 3 WFC ROUTE 9A (SB) ROUTE 9A (NB) 1 WTC ROUTE 9A (NB) ROUTE 9A (SB)

slide-30
SLIDE 30

01.25.2011

Urban Design Frontage at the World Trade Center 30

PERSPECTIVE VIEW NORTH AT WFC AND WTC SITE

World Financial Center Frontage 1 WFC

2 WFC

3 WFC

Albany Street

National September 11 Memorial & Museum

90 West St.

slide-31
SLIDE 31

01.25.2011

Urban Design Frontage at the World Trade Center 31

TEMPORARY LIBERTY ST. BYPASS PEDESTRIAN BRIDGE EXTENSION

1 WTC WFC ROUTE 9A (NB)

Liberty St. Bridge Extension

slide-32
SLIDE 32

01.25.2011

Urban Design Frontage at the World Trade Center 32

90 WEST STREET FRONTAGE

90 West St.

slide-33
SLIDE 33

01.25.2011

Urban Design Frontage at the World Trade Center 33

ROUTE 9A FRONTAGE AT THE MEMORIAL ROUTE 9A (NB)

NATIONAL SEPTEMBER 11 MEMORIAL & MUSEUM

ROUTE 9A (SB) WFC

slide-34
SLIDE 34

01.25.2011

Urban Design Frontage at the World Trade Center 34

ROUTE 9A FRONTAGE AT THE MEMORIAL

Route 9A Placeholder Memorial Proposal

slide-35
SLIDE 35

01.25.2011

Urban Design Frontage at the World Trade Center

NATIONAL SEPTEMBER 11 MEMORIAL & MUSEUM ROUTE 9A (SB) ROUTE 9A (NB)

ROUTE 9A URBAN DESIGN

“If there's a lesson in street watching it is that people do like basics

  • - and as environments go, a street that is open to the sky and filled

with people and life is a splendid place to be.”

  • Wm. H. Whyte
slide-36
SLIDE 36

01.25.2011

Urban Design Frontage at the World Trade Center 36

HOW TO CONTACT US

New York State Department of Transportation Route 9A Project Office 21 South End Avenue New York, NY 10280

  • Mr. Joseph Brown, Project Director
  • Ms. Lisa Weiss, Urban Design Director

9A Stakeholder Meetings are held throughout the duration

  • f

the project (3rd Friday of every month at LMCCC). The next meeting will be on February 18, 2011 at 10:30 AM. Contact us at: 1-800-714-0454 Email us at: route9a@dot.state.ny.us Please visit our web site at : www.route9a.info