SLIDE 16 01.25.2011
Urban Design Frontage at the World Trade Center 16
NYSDOT ROUTE 9A PENDING WORK ADJACENT TO WFC & WTC SITES
3 WFC 1 WTC 2 WFC 1 WFC NATIONAL SEPTEMBER 11 MEMORIAL & MUSEUM VSC VERIZON
1
Pavilion
18 23 11
BPC Pile Rehab
2 14 21 22
2 WFC Driveway
15
RWL Discharge
13
ROUTE E 9A
8 4 5 19 7
Vesey Bridge
South Projection
24 12 20 17
North Projection
6
CONCOURSE
10 9 25 25 25 3 11 11 13 16
Chiller Plant
1) BPCA Liberty Bridge Extension 2) Temp. Pedestrian Bridge Removal 3) Liberty Bridge Pier Removal and NB Pavement 4) VSC Frontage / NB Roadway 5) 90 West Street Frontage 6) Memorial Access 7) 9A Crosswalk at Liberty Street 8) 1 WFC Frontage and Median 9) Cedar St. Intersection Tie-In 10) Liberty St. Intersection Tie-In 11) Temporary or Permanent Utilities for 9/11 Memorial 10th Anniversary 12) Undercut, Lightweight Fill, Utilities, POE’s, Raise Grade, Paving etc. at Memorial Frontage 13) Memorial Frontage (bollards, irrigation, trench drains, trees, pavers) 14) 2 WFC Driveway Removal & 2 WFC Frontage & Median 15) 9A (All features) and Fulton Sewer at Concourse Crossing 16) Fulton Street Intersection Tie-In 17) Vesey Sewer, Utilities, POEs (on-going) 18) Vesey North Crosswalk Opening 19) Vesey Bridge Removal 20) North Chamber Slab Lowering 21) 9A – All Features 22) 3 WFC Frontage and Median 23) 1 WTC Frontage 24) Vesey Street Intersection Tie-In 25) 78” Interceptor Sewer Lining