UPMC PARK IMPROVEMENTS FINAL SCHEMATIC DESIGN February 21, 2019 - - PowerPoint PPT Presentation
UPMC PARK IMPROVEMENTS FINAL SCHEMATIC DESIGN February 21, 2019 - - PowerPoint PPT Presentation
UPMC PARK IMPROVEMENTS FINAL SCHEMATIC DESIGN February 21, 2019 LEGEND 1. Video Board Replacement 2. Restroom Renovations 7 3. Team Store and Club Venue 4. Left Field Entrance 5. Concessions & Commissary Renovations EXISTING ERIE
LEGEND
2
UPMC PARK IMPROVEMENTS February 21, 2019
MASTER PLAN
1. Video Board Replacement 2. Restroom Renovations 3. Team Store and Club Venue 4. Left Field Entrance 5. Concessions & Commissary Renovations 6. Suite Level Renovations 7. Batting Cage Improvements 8. Field Wall Replacement 9. Operations Office Renovations
- 10. Right Field Party Deck Renovations
- 11. General Wayfinding
- 12. Widen West Concourse
- 13. ADA Field Access
- 14. 10th Street Improvements
5 2 6 4 3 7 10 5 2 9 1 8 8 8 8 14 14 14 12 12 13
10TH STREET EXISTING ERIE INSURANCE ARENA HOLLAND STREET FRENCH STREET 9TH STREET
UP DN UP UP UP
MEN WOMEN CONCESSION COMMISARY CONCOURSE MEN WOMEN CONCESSION COMMISARY ELEV CONCOURSE FIRST AID STORAGE ELECTRICAL STORAGE COMMISSARY R/R CONCESSION OFFICE #1 OFFICE #2 OFFICE #3 WOMEN MEN CONCOURSE CLOSET RECEPTION OPEN OFFICE VAULT OFFICE #4 CORRIDOR VESTIBULE R/R
0' 15' 30' 60'
3
UPMC PARK IMPROVEMENTS February 21, 2019
RESTROOM RENOVATIONS(2)
LEGEND
- New floor traffic coating
- New paint
- Blackout exsiting ceiling
- New lighting
- New low-flow plumbing fixtures
- New toilet partitions
- Water heaters for lavatories
4
UPMC PARK IMPROVEMENTS February 21, 2019
CLUB VENUE(3) & LEFT FIELD ENTRANCE(4) 9TH STREET VIEW
5
UPMC PARK IMPROVEMENTS February 21, 2019
CLUB VENUE(3) & LEFT FIELD ENTRANCE(4) STADIUM VIEW
RETAIL 1,550 SF VESTIBULE ELEVATOR LOBBY STAIR OFFICE SERVING OFFICE OFFICE OFFICE OFFICE OFFICE RECEPTION TOILET BOX OFFICE OFFICE
UP UP
CONFERENCE PICNIC AREA VERIZON ACCESS OPEN OFFICE TO CONCOURSE TOILET STORAGE STAIR CORRIDOR CORRIDOR ELEVATOR RETAIL 1,390 SF CORRIDOR STAIR OPEN TO BELOW COMMON OFFICE OFFICE OFFICE OFFICE
UP UP DN DN
FLEX RETAIL CONFERENCE OFFICE OFFICE TOILET KIT FIRST AID OFFICE OFFICE WORK STAIR LOBBY
0' 8' 16' 32'
6
UPMC PARK IMPROVEMENTS February 21, 2019
TEAM STORE & CLUB VENUE(3)
LEVEL 2 - ARENA CONCOURSE LEVEL 1 - STADIUM CONCOURSE
STORAGE ELEVATOR STAIR
UP UP DN DN
STAIR ELECTRICAL LOBBY EVENT 230 CAPACITY BAR KITCHEN STAIR ELEVATOR WOMEN MEN DECK 40 SEATS
DN DN D N DN
STAIR LOBBY
0' 8' 16' 32'
7
UPMC PARK IMPROVEMENTS February 21, 2019
TEAM STORE & CLUB VENUE(3)
LEVEL 4 - STADIUM CLUB LEVEL 3 - STORAGE
8
UPMC PARK IMPROVEMENTS February 21, 2019
CLUB VENUE(3) STADIUM CLUB INTERIOR VIEW
1. Asphalt entry drive 2. ADA parking space 3. Decorative bollard 4. Replaced curb 5. Standard concrete (6” thick) 6. Retaining wall (±4’ tall) 7. Decorative lighting with banners 8. Landscape beds 9. Vehicular drop-off
- 10. Decorative concrete
- 11. Infield Wall
- 12. Fun Zone
- 13. Entry gates & sign
- 14. Box Office
- 15. 8’ tall ornamental security
fence
- 16. Team store entrance
- 17. Club level and office entrance
- 18. Group picnic area (±366
patrons) TEAM STORE & CLUB VENUE 9TH STREET FRENCH STREET EXISTING ERIE INSURANCE ARENA
LEGEND
LEFT FIELD ENTRANCE (4)
Right-of-Way Vacation Line
15 10 13 5 12 11 8 8 8 10 10 10 10 8 8 8 17 2 6 1 4 4 5 5 8 7 18 3 16 15 9
9
UPMC PARK IMPROVEMENTS February 21, 2019
UP UP UP
CONCOURSE MEN RECEPTION CLOSET OFFICE #1 OFFICE #2 OFFICE #3 CONCESSION OPEN OFFICE R/R CONCOURSE VAULT ELEV COMMISARY CONCESSION CONCOURSE WOMEN MEN COMMISARY CONCESSION CONCOURSE FIRST AID ELECTRICAL STORAGE STORAGE COMMISSARY 2,000 SF OFFICE #4 CORRIDOR VESTIBULE R/R
0' 15' 30' 60'
10
UPMC PARK IMPROVEMENTS February 21, 2019
CONCESSION/COMMISSARY(5) & OFFICE RENOVATIONS(9)
LEGEND
CONCESSION RENOVATION AREAS
- New epoxy floor coating
- New epoxy wall and ceiling paint
- New LED lighting
- Replace existing laminate service
counters, back counters & cabinets with stainless steel
- Replace menu signs with flat screen TVs
- New graphic signage
NEW MAIN COMMISSARY AREA
- Re-purpose existing storage and team
store areas into expanded commissary kitchen and dry storage area
- New commercial kitchen equipment
- New floor traffic coating, wall and
ceiling paint, and LED lighting OPERATIONS OFFICES RENOVATION
- New wall, floor and ceiling finishes.
DN DN PANTRY P.A. / SCORE MEDIA 40 SEAT CAPACITY HOME PLATE SUITE SKYBOX #1 SKYBOX #2 WOMEN MEN SKYBOX #3 SKYBOX #4 SKYBOX #5 SKYBOX #6 ELEV 125 SEATS LOST P.A. / SCORE MEDIA PANTRY
0' 15' 30' 60' 0' 4' 8' 16' 0' 4' 8' 16'
11
UPMC PARK IMPROVEMENTS February 21, 2019
SUITE LEVEL RENOVATIONS(6)
LEGEND
EXISTING SUITE RENOVATIONS
- New carpet, vinyl wall covering and
floor tile at casework wall, solid surface countertop and laminate casework, sink, glass door mini fridge
- New ceiling tile
- New padded exterior seats
- Restroom upgrades
- Expand the outdoor concrete deck area
- ver existing seating bowl
- New pantry structure
NEW HOME PLATE SUITE
- Combine underutilized press box spaces
into one large indoor suite with new exterior deck with high top tables/chairs
- Operable glass exterior wall
- New solid surface countertop and
laminate casework, sink and mini fridge
HOME PLATE SUITE PRESS BOX
12
UPMC PARK IMPROVEMENTS February 21, 2019
SUITE LEVEL RENOVATIONS(6) HOME PLATE SUITE VIEW
13
UPMC PARK IMPROVEMENTS February 21, 2019
RIGHT FIELD PARTY DECK (10) AERIAL
TOILET BAR/SUPPORT WOMEN MEN NEW DECK ELEV = +4'-0" DN D N DN DN TO CONCOURSE ELEV PARTY DECK 270 CAPACITY SUITES 6 @ 20 CAPACITY
- EXIST. ELEV = 0'-0"
- EXIST. ELEV = +1'-6"
DN DN OUTLINE OF NEW ROOF ABOVE UP DN DN DN DN DN DN DN UPPER PICNIC 300 CAPACITY CONCESSION ELEV STORAGE BULLPEN BAR 130 CAPACITY CONCOURSE CONCOURSE OPEN SEATING/PORTABLES
0' 10' 20' 40'
14
UPMC PARK IMPROVEMENTS February 21, 2019
RIGHT FIELD PARTY DECK (10)
UPPER LEVEL LOWER LEVEL LEGEND
PARTY DECK/BAR VENUE
- New tiered composite wood deck
- New outdoor bar style furniture
- New full service bar/concession with
bartop seating
- New canopy structure
PICNIC AREA IMPROVEMENTS
- New exterior flat screen TV’s
- New paint and LED lighting
BULLPEN BAR GROUP AREA
- New railing at concourse level
- New concrete stairs to access
concourse level
- New outdoor bar style furniture and
4Topp seating