UPMC PARK IMPROVEMENTS FINAL SCHEMATIC DESIGN February 21, 2019 - PowerPoint PPT Presentation

UPMC PARK IMPROVEMENTS FINAL SCHEMATIC DESIGN February 21, 2019 LEGEND 1. Video Board Replacement 2. Restroom Renovations 7 3. Team Store and Club Venue 4. Left Field Entrance 5. Concessions & Commissary Renovations EXISTING ERIE


  1. UPMC PARK IMPROVEMENTS FINAL SCHEMATIC DESIGN February 21, 2019

  2. LEGEND 1. Video Board Replacement 2. Restroom Renovations 7 3. Team Store and Club Venue 4. Left Field Entrance 5. Concessions & Commissary Renovations EXISTING ERIE INSURANCE ARENA 6. Suite Level Renovations 7. Batting Cage Improvements 8. Field Wall Replacement 9. Operations Office Renovations 10. Right Field Party Deck Renovations 11. General Wayfinding 8 12. Widen West Concourse 8 13. ADA Field Access 14. 10th Street Improvements 4 9TH STREET 3 1 8 HOLLAND STREET FRENCH STREET 12 5 2 6 13 9 8 12 10 5 2 14 14 14 10TH STREET MASTER PLAN 2 UPMC PARK IMPROVEMENTS February 21, 2019

  3. LEGEND • New floor traffic coating • New paint • Blackout exsiting ceiling • New lighting • New low-flow plumbing fixtures • New toilet partitions • Water heaters for lavatories UP DN WOMEN UP CONCOURSE MEN CLOSET RECEPTION VESTIBULE OFFICE #1 CORRIDOR OFFICE #2 CONCESSION OFFICE #3 OFFICE #4 COMMISSARY OPEN OFFICE R/R STORAGE STORAGE ELECTRICAL VAULT R/R FIRST AID CONCOURSE CONCOURSE UP ELEV UP WOMEN MEN MEN WOMEN CONCESSION COMMISARY COMMISARY CONCESSION 0' 15' 30' 60' RESTROOM RENOVATIONS(2) 3 UPMC PARK IMPROVEMENTS February 21, 2019

  4. CLUB VENUE(3) & LEFT FIELD ENTRANCE(4) 9TH STREET VIEW 4 UPMC PARK IMPROVEMENTS February 21, 2019

  5. CLUB VENUE(3) & LEFT FIELD ENTRANCE(4) STADIUM VIEW 5 UPMC PARK IMPROVEMENTS February 21, 2019

  6. FLEX RETAIL STAIR STAIR CORRIDOR FIRST ELEVATOR ELEVATOR AID TOILET KIT UP DN UP RECEPTION OFFICE CONFERENCE LOBBY OPEN OFFICE LOBBY COMMON OFFICE OFFICE STORAGE WORK SERVING OFFICE CONFERENCE RETAIL OFFICE OFFICE OFFICE TOILET TOILET 1,390 SF OFFICE CORRIDOR DN STAIR STAIR OFFICE OFFICE CORRIDOR OFFICE UP UP VERIZON ACCESS OFFICE TO OFFICE PICNIC AREA CONCOURSE OFFICE BOX OFFICE OFFICE RETAIL OPEN 1,550 SF TO BELOW VESTIBULE 0' 8' 16' 32' LEVEL 1 - STADIUM CONCOURSE LEVEL 2 - ARENA CONCOURSE TEAM STORE & CLUB VENUE(3) 6 UPMC PARK IMPROVEMENTS February 21, 2019

  7. STAIR STAIR ELEVATOR ELECTRICAL ELEVATOR LOBBY DN DN UP LOBBY BAR KITCHEN MEN WOMEN STORAGE DN DN STAIR STAIR UP DN EVENT 230 CAPACITY DECK 40 SEATS D N 0' 8' 16' 32' LEVEL 3 - STORAGE LEVEL 4 - STADIUM CLUB TEAM STORE & CLUB VENUE(3) 7 UPMC PARK IMPROVEMENTS February 21, 2019

  8. CLUB VENUE(3) STADIUM CLUB INTERIOR VIEW 8 UPMC PARK IMPROVEMENTS February 21, 2019

  9. LEGEND 1. Asphalt entry drive 2. ADA parking space 3. Decorative bollard 7 4. Replaced curb 8 5. Standard concrete (6” thick) 6. Retaining wall (±4’ tall) EXISTING ERIE 5 7. Decorative lighting with 6 INSURANCE ARENA banners 8. Landscape beds 8 9. Vehicular drop-off 10. Decorative concrete 11. Infield Wall 12. Fun Zone 17 13. Entry gates & sign 2 14. Box Office 8 15. 8’ tall ornamental security 10 10 fence 8 5 16. Team store entrance 17. Club level and office entrance Right-of-Way Vacation Line 18. Group picnic area (±366 4 1 patrons) 10 9 9TH STREET 3 4 15 TEAM STORE & 8 8 CLUB VENUE 10 16 8 13 FRENCH STREET 10 18 11 5 12 15 LEFT FIELD ENTRANCE (4) 9 UPMC PARK IMPROVEMENTS February 21, 2019

  10. LEGEND CONCESSION RENOVATION AREAS • New epoxy floor coating • New epoxy wall and ceiling paint • New LED lighting • Replace existing laminate service counters, back counters & cabinets with stainless steel • Replace menu signs with flat screen TVs • New graphic signage NEW MAIN COMMISSARY AREA • Re-purpose existing storage and team store areas into expanded commissary UP kitchen and dry storage area • New commercial kitchen equipment CONCOURSE • New floor traffic coating, wall and ceiling paint, and LED lighting MEN OPERATIONS OFFICES RENOVATION • New wall, floor and ceiling finishes. CLOSET RECEPTION VESTIBULE OFFICE #1 CORRIDOR OFFICE #2 CONCESSION OFFICE #3 OFFICE #4 COMMISSARY 2,000 SF OPEN OFFICE R/R STORAGE CONCOURSE STORAGE ELECTRICAL VAULT R/R FIRST AID CONCOURSE CONCOURSE UP ELEV UP WOMEN MEN CONCESSION COMMISARY CONCESSION COMMISARY 0' 15' 30' 60' CONCESSION/COMMISSARY(5) & OFFICE RENOVATIONS(9) 10 UPMC PARK IMPROVEMENTS February 21, 2019

  11. LEGEND EXISTING SUITE RENOVATIONS • New carpet, vinyl wall covering and floor tile at casework wall, solid surface countertop and laminate casework, sink, glass door mini fridge • New ceiling tile • New padded exterior seats • Restroom upgrades • Expand the outdoor concrete deck area over existing seating bowl • New pantry structure DN NEW HOME PLATE SUITE SKYBOX #6 • Combine underutilized press box spaces into one large indoor suite with new exterior deck with high top tables/chairs • Operable glass exterior wall SKYBOX #5 • New solid surface countertop and laminate casework, sink and mini fridge SKYBOX #4 MEDIA 125 SEATS LOST SKYBOX #3 MEN SKYBOX #2 WOMEN SKYBOX #1 HOME PLATE SUITE P.A. / SCORE 40 SEAT CAPACITY 0' 4' 8' 16' PANTRY MEDIA HOME PLATE SUITE P.A. / SCORE PANTRY 0' 15' 30' 60' 0' 4' 8' 16' DN PRESS BOX ELEV SUITE LEVEL RENOVATIONS(6) 11 UPMC PARK IMPROVEMENTS February 21, 2019

  12. SUITE LEVEL RENOVATIONS(6) HOME PLATE SUITE VIEW 12 UPMC PARK IMPROVEMENTS February 21, 2019

  13. RIGHT FIELD PARTY DECK (10) AERIAL 13 UPMC PARK IMPROVEMENTS February 21, 2019

  14. LEGEND PARTY DECK/BAR VENUE • New tiered composite wood deck • New outdoor bar style furniture • New full service bar/concession with bartop seating • New canopy structure PICNIC AREA IMPROVEMENTS • New exterior flat screen TV’s • New paint and LED lighting BULLPEN BAR GROUP AREA • New railing at concourse level • New concrete stairs to access concourse level • New outdoor bar style furniture and 4Topp seating UP CONCOURSE CONCOURSE DN OPEN SEATING/PORTABLES DN DN DN DN TOILET WOMEN SUITES D N 6 @ 20 CAPACITY BULLPEN BAR DN 130 CAPACITY DN EXIST. ELEV = 0'-0" MEN DN DN PARTY DECK UPPER PICNIC 270 CAPACITY NEW DECK ELEV = +4'-0" 300 CAPACITY EXIST. ELEV = +1'-6" ELEV ELEV CONCESSION DN STORAGE BAR/SUPPORT DN DN TO CONCOURSE OUTLINE OF NEW ROOF ABOVE LOWER LEVEL UPPER LEVEL 0' 10' 20' 40' RIGHT FIELD PARTY DECK (10) 14 UPMC PARK IMPROVEMENTS February 21, 2019

  15. RIGHT FIELD PARTY DECK (10) UPPER LEVEL VIEW 15 UPMC PARK IMPROVEMENTS February 21, 2019

  16. RIGHT FIELD PARTY DECK (10) LOWER LEVEL VIEW 16 UPMC PARK IMPROVEMENTS February 21, 2019

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.