August 9th, 2018
Update Report
Elbridge Gerry Building Committee Meeting
Raymond Design Associates
Schematic Design
Update Report August 9 th , 2018 Raymond Design Associates HVAC - - PowerPoint PPT Presentation
Elbridge Gerry Building Committee Meeting Schematic Design Update Report August 9 th , 2018 Raymond Design Associates HVAC Comparative Cost Analysis Sloped v. Flat Roof Comparative Cost Analysis Typical 4-Classroom Bay Sloped:
August 9th, 2018
Elbridge Gerry Building Committee Meeting
Raymond Design Associates
Schematic Design
Typical 4-Classroom Bay
Sloped: $715,000 Flat: 590,000 Difference: $125,000 $19/sf Affected Area = 37k sf Difference: $703,000 + gen conds, etc Total: $950,000+/- Order of Magnitude
Birdseye View - Option 450L.1 (PSR) ‘L-Shape’ Massing – Birdseye View
Sloped Roof Option – 450L.1 from Baldwin Road
‘L-Shaped’ Option 450L.4 – from Baldwin Road
Retaining Wall
Flat Roof Option 450L.1 – from Baldwin Road
‘L-Shaped’ Option 450L.4 – from Baldwin Road
Retaining Wall
Benefits
‘L-Shape’ Building Footprint