Update Report August 9 th , 2018 Raymond Design Associates HVAC - - PowerPoint PPT Presentation

update report
SMART_READER_LITE
LIVE PREVIEW

Update Report August 9 th , 2018 Raymond Design Associates HVAC - - PowerPoint PPT Presentation

Elbridge Gerry Building Committee Meeting Schematic Design Update Report August 9 th , 2018 Raymond Design Associates HVAC Comparative Cost Analysis Sloped v. Flat Roof Comparative Cost Analysis Typical 4-Classroom Bay Sloped:


slide-1
SLIDE 1

August 9th, 2018

Update Report

Elbridge Gerry Building Committee Meeting

Raymond Design Associates

Schematic Design

slide-2
SLIDE 2

HVAC Comparative Cost Analysis

slide-3
SLIDE 3
slide-4
SLIDE 4

Sloped v. Flat Roof Comparative Cost Analysis

slide-5
SLIDE 5
slide-6
SLIDE 6
slide-7
SLIDE 7

Typical 4-Classroom Bay

Sloped: $715,000 Flat: 590,000 Difference: $125,000 $19/sf Affected Area = 37k sf Difference: $703,000 + gen conds, etc Total: $950,000+/- Order of Magnitude

slide-8
SLIDE 8

L-Shape Plan v. Straight Bar Plan

slide-9
SLIDE 9
slide-10
SLIDE 10
slide-11
SLIDE 11
slide-12
SLIDE 12
slide-13
SLIDE 13

Birdseye View - Option 450L.1 (PSR) ‘L-Shape’ Massing – Birdseye View

slide-14
SLIDE 14

Sloped Roof Option – 450L.1 from Baldwin Road

New School at the Bell Site

‘L-Shaped’ Option 450L.4 – from Baldwin Road

Retaining Wall

slide-15
SLIDE 15

Flat Roof Option 450L.1 – from Baldwin Road

New School at the Bell Site

‘L-Shaped’ Option 450L.4 – from Baldwin Road

Retaining Wall

slide-16
SLIDE 16
slide-17
SLIDE 17

Benefits

‘L-Shape’ Building Footprint

slide-18
SLIDE 18
slide-19
SLIDE 19

Questions & Comments