Update Report August 9 th , 2018 Raymond Design Associates HVAC - PowerPoint PPT Presentation

Elbridge Gerry Building Committee Meeting Schematic Design Update Report August 9 th , 2018 Raymond Design Associates HVAC Comparative Cost Analysis Sloped v. Flat Roof Comparative Cost Analysis Typical 4-Classroom Bay Sloped:


  1. Elbridge Gerry Building Committee Meeting Schematic Design Update Report August 9 th , 2018 Raymond Design Associates

  2. HVAC Comparative Cost Analysis

  3. Sloped v. Flat Roof Comparative Cost Analysis

  4. Typical 4-Classroom Bay Sloped: $715,000 Flat: 590,000 Difference: $125,000 $19/sf Affected Area = 37k sf Difference: $703,000 + gen conds, etc Total: $950,000+/- Order of Magnitude

  5. L-Shape Plan v. Straight Bar Plan

  6. Birdseye View - Option 450L.1 (PSR) ‘L-Shape’ Massing – Birdseye View

  7. New School at the Bell Site Retaining Wall Sloped Roof Option – 450L.1 from Baldwin Road ‘L-Shaped’ Option 450L.4 – from Baldwin Road

  8. New School at the Bell Site Retaining Wall Flat Roof Option 450L.1 – from Baldwin Road ‘L-Shaped’ Option 450L.4 – from Baldwin Road

  9. Benefits ‘L-Shape’ Building Footprint

  10. Questions & Comments

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.