Footer Text Date
TXDOT SOUTH TEXAS / RIO GRANDE VALLEY HEAVY HIGHWAY FORUM
Pedro R. Alvarez, P.E. Pharr District Engineer
April 18, 2019
TXDOT SOUTH TEXAS / RIO GRANDE VALLEY HEAVY HIGHWAY FORUM Pedro - - PowerPoint PPT Presentation
TXDOT SOUTH TEXAS / RIO GRANDE VALLEY HEAVY HIGHWAY FORUM Pedro R. Alvarez, P.E. Pharr District Engineer April 18, 2019 Date Footer Text Table of Contents Safety Minute 1 3 Long Range Plan 2 4 Funding Forecast 3 5 Letting List 4
Footer Text Date
TXDOT SOUTH TEXAS / RIO GRANDE VALLEY HEAVY HIGHWAY FORUM
Pedro R. Alvarez, P.E. Pharr District Engineer
April 18, 2019
Footer Text Date
Table of Contents
24 5 6 7 3 Safety Minute Long Range Plan Funding Forecast Letting List Questions 1 2 3 4 5
Footer Text Date
Footer Text Date
April 18, 2019
Footer Text Date
October 31, 2018
Footer Text Date
Funding Revenue Forecast
6FY 2019 FY 2020 CATEGORY 1-12 $ 538.54 $ 117.52 RMC $ 15.16 $ 18.88 LOCAL/RMA $ 32.78 $ 45.84 Letting Total $ 586.48 $ 182.24
Dolla llar r amounts nts are in Millio lions ns of dollar lars I-2/I6 I69C C Interchange hange estimat ated ed to to be approx. . $ 262.9 .92 M for FY 2019
Footer Text Date
LETTING LIST REVIEW
April 18, 2019
Footer Text Date
April 18, 2019