TXDOT SOUTH TEXAS / RIO GRANDE VALLEY HEAVY HIGHWAY FORUM Pedro - - PowerPoint PPT Presentation

txdot south texas
SMART_READER_LITE
LIVE PREVIEW

TXDOT SOUTH TEXAS / RIO GRANDE VALLEY HEAVY HIGHWAY FORUM Pedro - - PowerPoint PPT Presentation

TXDOT SOUTH TEXAS / RIO GRANDE VALLEY HEAVY HIGHWAY FORUM Pedro R. Alvarez, P.E. Pharr District Engineer April 18, 2019 Date Footer Text Table of Contents Safety Minute 1 3 Long Range Plan 2 4 Funding Forecast 3 5 Letting List 4


slide-1
SLIDE 1

Footer Text Date

TXDOT SOUTH TEXAS / RIO GRANDE VALLEY HEAVY HIGHWAY FORUM

Pedro R. Alvarez, P.E. Pharr District Engineer

April 18, 2019

slide-2
SLIDE 2

Footer Text Date

Table of Contents

2

4 5 6 7 3 Safety Minute Long Range Plan Funding Forecast Letting List Questions 1 2 3 4 5

slide-3
SLIDE 3

Footer Text Date

slide-4
SLIDE 4

Footer Text Date

April 18, 2019

slide-5
SLIDE 5

Footer Text Date

October 31, 2018

slide-6
SLIDE 6

Footer Text Date

Funding Revenue Forecast

6
  • Dist. Funding Sources

FY 2019 FY 2020 CATEGORY 1-12 $ 538.54 $ 117.52 RMC $ 15.16 $ 18.88 LOCAL/RMA $ 32.78 $ 45.84 Letting Total $ 586.48 $ 182.24

Dolla llar r amounts nts are in Millio lions ns of dollar lars I-2/I6 I69C C Interchange hange estimat ated ed to to be approx. . $ 262.9 .92 M for FY 2019

slide-7
SLIDE 7

Footer Text Date

LETTING LIST REVIEW

April 18, 2019

slide-8
SLIDE 8

Footer Text Date

April 18, 2019

QUE QUESTIONS TIONS?