Twinning project Work Plan Component 1 development of guidelines - - PowerPoint PPT Presentation

twinning project
SMART_READER_LITE
LIVE PREVIEW

Twinning project Work Plan Component 1 development of guidelines - - PowerPoint PPT Presentation

Twinning project Work Plan Component 1 development of guidelines for environmental permitting on different issues: air, hazardous substances, hazardous waste, industrial waste, contaminated soil, agricultural waste, monitoring and reporting


slide-1
SLIDE 1

Twinning project

Work Plan

slide-2
SLIDE 2

development of guidelines for environmental permitting

  • n different issues: air, hazardous substances, hazardous

waste, industrial waste, contaminated soil, agricultural waste, monitoring and reporting With special focus on the needs of SMEs

Component 1

slide-3
SLIDE 3

Air pollution

– Quality control of sampling and monitoring stake emissions – The new T.A. luft – Environmental permitting of large combustion plants – Formation of guidelines: Fuel storage; Print shops; Pharmaceutical industry; Others… – Management plans for polluted urban areas

slide-4
SLIDE 4

Industrial wastewater

– Monitoring; Sampling; Reporting; – Emission Values of volatile organic compounds, toxic substances, persistent substances; – Limitations on loads; – Evaluating the effect of effluent discharge on the discharge site – Guidelines for streams inventory and streams management in chemical plants – Prevention of soil pollution from pipes and other infrastructure

slide-5
SLIDE 5

Soil pollution

– Classification of polluted soils; – Routing polluted soils to different modes of treatment; – Regulation of on site treatment facilities; – Criteria for routing treated soil for different uses; – Decisions on a contaminated site in land use plans; – Treating of site polluted with explosives. – The method of testing and certification of various treatment techniques;

slide-6
SLIDE 6

Hazardous substances

– Guidelines and training for risk management plan in industry – Guidance and training with regard to inspection of risk management – Formation of guidelines:

– Storage of hazardous materials – Risk prevention techniques; – Other…

slide-7
SLIDE 7

Hazardous waste

– Classification of hazardous waste – Methods of sampling and analysis – Classification of treatment (recovery / disposal) – Matching waste streams for treatment – Regulating of treatment facilities

slide-8
SLIDE 8

Agricultural waste

– Regulation of agricultural waste – Environmental regulation of Livestock rearing

slide-9
SLIDE 9

development of guidelines for systematic environmental management to improve the environmental performance of the industries in Israel

Component 2

slide-10
SLIDE 10

Environmental management

– Manual on the implementation of environmental management in industry – Verification ad certification; Examining the possibility of certification to EMAS Policy tools to encourage environmental management

slide-11
SLIDE 11

Policy development and tools for resource efficiency

Component 3

slide-12
SLIDE 12

Recourse efficiency

– policy measures and roadmap for resource efficiency;

– Food material stream; – Plastic material stream; – Accompanying the establishment of a knowledge center efficiency in use of resources

– Manuals/ policy tools:

– Energy efficiency; – Materials Management; – Waste management; – Fundraising for efficiency projects