Transportation Commission October 15, 2014 Updates to Receive (Consent) Agenda Item #2 Commission Updates Agenda Item #3 West End Transitway Agenda Item #4 SCOPE OF WORK | Alternatives Analysis and Environmental Assessment (AA and EA)


slide-1
SLIDE 1

Transportation Commission

October 15, 2014

slide-2
SLIDE 2

Updates to Receive (Consent)

Agenda Item #2

slide-3
SLIDE 3

Commission Updates

Agenda Item #3

slide-4
SLIDE 4

West End Transitway

Agenda Item #4

slide-5
SLIDE 5

5

SCOPE OF WORK | Alternatives Analysis and Environmental Assessment (AA and EA)

  • Alternatives Analysis (AA)
  • Evaluates three alternatives – No Build, TSM,

and Build

  • Provides information on benefits, costs, and

impacts, so that a locally preferred alternative can be identified

  • Environmental Assessment (EA)
  • Analyzes potential transportation, social,

economic, and environmental impacts of preferred alternative

  • Identifies mitigation measures, as necessary
slide-6
SLIDE 6

6

AA and EA / Timeline

slide-7
SLIDE 7

7

  • Pop-Up Meetings
  • Queen of the Apostle
  • Mark Center Transit

Station

  • Flyers / Rack Cards
  • JBG Properties &

Seminary Towers

  • NVCC
  • Mark Center &

Pentagon Transit Centers

  • Van Dorn Metro

Station

  • PAG Members
  • Libraries / Rec

Centers

  • Businesses along the

Corridor

Additional Public Outreach

slide-8
SLIDE 8

8

  • No Build Alternative
  • Transit services in shared lanes similar to current conditions
  • Includes already planned and programmed infrastructure, traffic
  • peration, and transit service improvements
  • Transportation Systems Management (TSM) Alternative
  • Frequent, continuous transit service along Van Dorn and Beauregard

Streets

  • New, limited-stop bus service along the entirety of the corridor
  • Some traffic operational enhancements
  • No major capital investment in new infrastructure for dedicated transit

lanes

  • Build Alternative
  • Frequent, continuous transit service along Van Dorn and Beauregard

Streets

  • Dedicated transit lanes along significant portions of corridor
  • Infrastructure and operational elements to enhance transit operations

AA Study Alternatives

slide-9
SLIDE 9

9

  • Systems Operations
  • Infrastructure
  • Transit Service

Elements of Alternatives

slide-10
SLIDE 10

10

Build and TSM Station locations and Transitway facility locations

slide-11
SLIDE 11

11

System Operations

slide-12
SLIDE 12

12

Build Alternative Stations

  • Up to two vehicles
  • Shelters
  • Level or near-level

boarding

  • Off-board fare

collection system

  • Service-specific

branding

  • Real-time service

information display

slide-13
SLIDE 13

13

Build Alternative Vehicles

US 1 Metroway vehicle, Source: www.wmata.com

slide-14
SLIDE 14

14

Infrastructure

slide-15
SLIDE 15

15

Build Alternative Cross-Sections

slide-16
SLIDE 16

16

Median Dedicated Transitway US 1 Metroway

Source: www.flickr.com/BeyondDC

slide-17
SLIDE 17

17

Transit Service

slide-18
SLIDE 18

18

Transitway Service Operations

Van Dorn to Pentagon: Green Route – 15 peak/30 midday Blue Route – 15 peak/30 midday Combined – 7.5 peak/15 midday Mark Center-Shirlington: Red Route – 15 peak/15 midday Blue Route – 7.5 peak/15 midday Combined – 5 peak/7.5 midday Service to Pentagon: Green Route – 7.5 peak/15 midday Blue Route – 7.5 peak/15 midday Van Dorn Metro-Mark Center: Red Route – 15 peak/15 midday Green Route – 7.5 peak/15 midday Combined – 5 peak/7.5 midday

slide-19
SLIDE 19

19

  • Evaluation

measures needed to determine performance of alternatives

  • Performance of

alternatives will determine Locally Preferred Alternative

  • Effects of Locally

Preferred Alternative will be documented in the Environmental Assessment

Evaluation Process

WE ARE HERE

slide-20
SLIDE 20

20 Transit

  • Ridership
  • Coverage
  • Transit Connectivity
  • Transit Operations

Traffic Operations

  • Intersection LOS/Delay
  • Intersection Queuing
  • Vehicular Travel Time

Bicycles and Pedestrians Land Use Financial Environmental

Draft Evaluation Measures

slide-21
SLIDE 21

21

Evaluation Measures and Preliminary Findings - Example

slide-22
SLIDE 22

22

October 2014

  • Evaluation of Alternatives and Revised Definition
  • f Alternatives
  • Public Meeting #2 October 22, 2014 - 6:30PM

to 8:30PM

  • PAG Meeting #3 October 23, 2014 - 7PM to

9PM November 2014

  • Build Alternative Concept Engineering
  • PAG Meeting Date TBD

December 2014

  • Draft Alternatives Analysis Report
  • Request to FTA to Enter Project Development

AA and EA Next Steps

slide-23
SLIDE 23

23

Thank You

QUESTIONS?

www.alexandriava.gov/WestEndTransitway

slide-24
SLIDE 24

Other Business

Agenda Item #5

slide-25
SLIDE 25

25

2014 Transportation Long Range Plan Update

  • Redesign Intersection of Mt. Vernon and

Four Mile Road

  • Description changed from:

“Construct cul-de-sac from Bruce Street into park and construct new T intersection” To: “Construct pedestrian, bicycle improvements as well as vehicular circulation improvements within the vicinity of the intersection of Mount Vernon Avenue and Four Mile Run”