time dropping soapsticks brings new life to an old idea
play

Time Dropping Soapsticks Brings New Life to an Old Idea Joe Lopez: - PowerPoint PPT Presentation

Time Dropping Soapsticks Brings New Life to an Old Idea Joe Lopez: Chevron USA Jim Votaw: J&J Solutions Adam Shaheen: PetroVision Field Services 2006 Gas Well Deliquification Workshop February 27 March 1, 2005 Contents Soapstick


  1. Time Dropping Soapsticks Brings New Life to an Old Idea Joe Lopez: Chevron USA Jim Votaw: J&J Solutions Adam Shaheen: PetroVision Field Services 2006 Gas Well Deliquification Workshop February 27 – March 1, 2005

  2. Contents � Soapstick History � Opportunity � Gas Well Results � Conclusion � Contact information

  3. Soapstick History � Surfactants in the form of soapsticks have been used for decades. � Has not been viable option for continuous treatment � Many factors determine effectiveness of soapsticks

  4. Opportunity � Chevron had several underperforming gas wells � Reduced and declining production � Increasing material costs � Manpower intensive � Various methods employed to improve performance � Defined pilot program with J&J Solutions and PetroVision Field Services � 9 Gas Wells with various issues

  5. Prior treatment Installed J&J Auto-Launcher June 2005 � Pumper visit every other day – Improved � Yield – 60 MCFD � Daily Pumper visit Manpower Utilization � 2 soap sticks dropped daily � 2 soap sticks dropped every 16 hours Yield (interval varied) Increased to 83 MCFD – Increase of Greater Than 38% � Based on $6/MCFD and Launcher cost of $6,000 – New System Paid Out in 43 Days Based Only on Increased Yield C B MT#13 95 90 MCF/ Da 85 80 75 70 65 60 r r r e e e r y y e t y s e b b b r a n l u a u b m m m M u u J g o J e e e u n t c A t v c a p O o e J e N D S Month

  6. Prior treatment Installed J&J Auto-Launcher June 2005 � Pumper visit every other day – Improved � Yield – 206 MCFD � Daily Pumper visit Manpower Utilization � 2 soap sticks dropped daily � 2 soap sticks dropped every 16 hours Yield (interval varied) Increased to 221 MCFD – Increase of Greater Than 7% � Based on $6/MCFD and Launcher cost of $6,000 – New System Paid Out in 67 Days Based Only on Increased Yield MLE I B MT #1 240 235 230 225 a F/D 220 215 C 210 M 205 200 195 190 r r r e e e y r e t y y s b e b b r a n u l m b m m a u M u u g o J J e e e n u t c t v c A a p O o e J e N D S Month

  7. Prior treatment Installed J&J Auto-Launcher August 2005 � Venting stopped, Pumper visit every other � Yield – 91 MCFD � Daily Pumper visit day – Improved Manpower Utilization � 2 soap sticks dropped daily � 2 soap sticks dropped every 16 hours Yield (interval varied) Increased to 178 MCFD – Increase of � Vented regularly to maintain Greater Than 95% production � Based on $6/MCFD and Launcher cost of $6,000 – New System Paid Out in 12 Days Based Only on Increased Yield 215 BMT C35 195 175 155 135 115 95 75 July August S eptem ber O ctober N ovem ber D ecem ber

  8. Prior treatment Installed J&J Auto-Launcher August 2005 � Pumper visit every other day – Improved � Yield – 81 MCFD � Treatment, capillary string Manpower Utilization � No increase in production � 2 soap sticks dropped every 16 hours Yield after work-over Increased to 101 MCFD – Increase of Greater Than 24% � Based on $6/MCFD and Launcher cost of $6,000 – New System Paid Out in 50 Days Based Only on Increased Yield 120 C BMT #29 110 100 90 80 70 60 July August S eptem ber O ctober N ovem ber D ecem ber

  9. Installed J&J Auto-Launcher August 2005 Prior treatment � Pumper visit every other day – Improved � Yield – 61 MCFD Manpower Utilization � Treatment, capillary string � 2 soap sticks dropped every 16 hours Yield and required venting to Increased to 80 MCFD – Increase of produce Greater Than 31% � Well shares a flow line with � Based on $6/MCFD and Launcher cost of stronger well $6,000 – New System Paid Out in 53 Days Based Only on Increased Yield 120 C BMT #29 BMT C 44 110 100 90 80 70 60 50 40 July August Septem ber O ctober N ovem ber D ecem ber

  10. Prior treatment Installed J&J Auto-Launcher November 2005 � Pumper visit every other day – Improved � Yield – 43 MCFD � Daily Pumper visit Manpower Utilization � Verge of being plugged and � 2 soap sticks dropped every 16 hours Yield abandoned due to low Increased to 118 MCFD – Increase of Greater production Than 174% � Based on $6/MCFD and Launcher cost of $6,000 – New System Paid Out in 13 Days Based Only on Increased Yield Ant Martinez B -4 160 140 CF/ Da 120 100 80 M 60 40 O ctober N ovem ber D ecem ber Month

  11. Prior treatment Installed J&J Auto-Launcher November 2005 � Pumper visit every other day – Improved � Yield – 112 MCFD � Daily Pumper visit Manpower Utilization � 2 soap sticks dropped daily � 2 soap sticks dropped every 16 hours Yield (interval varied) Increased to 151 MCFD – Increase of Greater Than 34% � Based on $6/MCFD and Launcher cost of $6,000 – New System Paid Out in 26 Days Based Only on Increased Yield C L M cann 200 180 a / D 160 F C 140 M 120 100 O ctober N ovem ber D ecem ber Month

  12. Prior treatment Installed J&J Auto-Launcher November 2005 � Pumper visit every other day – Improved � Yield – 54 MCFD � Daily Pumper visit Manpower Utilization � 2 soap sticks dropped daily � 2 soap sticks dropped every 16 hours Yield (interval varied) Increased to 106 MCFD – Increase of Greater Than 96% � Based on $6/MCFD and Launcher cost of $6,000 – New System Paid Out in 19 Days Based Only on Increased Yield I Moreno #11 150 MCF/ Da 100 50 0 O ctober N ovem ber D ecem ber Month

  13. Prior treatment Installed J&J Auto-Launcher November 2005 � Pumper visit every other day – Improved � Yield – 21 MCFD � Daily Pumper visit Manpower Utilization � 2 soap sticks dropped daily � 2 soap sticks dropped every 16 hours Yield (interval varied) and little Increased to 85 MCFD – Increase of Greater response Than 304% and Still Increasing � Based on $6/MCFD and Launcher cost of $6,000 – New System Paid Out in 16 Days Based Only on Increased Yield I M oreno #6 100 80 a F/ D 60 C 40 M 20 0 O ctober N ovem ber D ecem ber Month

  14. Issues Encountered and Solutions � Soapsticks Hanging up in Launcher. � Used different soapsticks � Battery going dead because of short winter days. � Increase the standard solar panel size � Setting Time for drops to optimize performance against high flow. � We have begun to work with the Telemetry System for optimization on stronger wells

  15. Conclusion � Pilot has been a success � Reduced manpower demand due to J&J Launchers � Revenue Increase approximately $ 1 million annually and rising � Investment paid out in less than 23 days � J&J Solutions and PetroVision Field Services able to Partner to meet Individual Customer Needs

  16. Contact Information Adam Shaheen Matt Votaw ashaheen@houston.rr.com mvotaw@jandjsolution.com (713) 825-3437 (405) 473-2137

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend