thursday april 4 th 2019 lok sabha elections 2019
play

Thursday, April 4 th , 2019 Lok Sabha Elections 2019 NAMMA - PowerPoint PPT Presentation

MPLAD FUND UTILIZATION STUDY REPORT Bengaluru City Parliamentary Constituencies Suddi Mane, Press Club of Bengaluru Thursday, April 4 th , 2019 Lok Sabha Elections 2019 NAMMA BENGALURU PRIDE REGISTER | VOTE | PARTICIPATE MPLAD STUDY


  1. MPLAD FUND UTILIZATION STUDY REPORT Bengaluru City Parliamentary Constituencies Suddi Mane, Press Club of Bengaluru Thursday, April 4 th , 2019

  2. Lok Sabha Elections 2019 NAMMA BENGALURU PRIDE REGISTER | VOTE | PARTICIPATE MPLAD STUDY PERFORMANCE of MP ETHICAL ELECTIONS COMPREHENSIVE CANDIDATE INDEPENDENT CRITERIA BASED DON’T GIVE UP ON DEMOCRCY INFORMATION ASSESSMENT CITIZENS MEET CANDIDATE 2

  3. Members of Parliament Local Area Development Fund (MPLAD) About MPLADS • MPLADS scheme: Developmental works in the Parliamentary Constituency • INR 5 cr per annum is allocated to the MP’s per Parliamentary Constituency Study Objective • To analyze the utilization level of MPLADS in the three Parliamentary Constituencies which are under Bangalore Urban district . Methodology • Phase 1: Data collection and compilation – Data collected from the District Collector (DC) office for 4 financial years 2014-15 to 2017-18. • Phase 2: Analysis of the data • Phase 3: Validating the analyzed data from the MP’s office 3

  4. Members of Parliament Local Area Development Fund (MPLAD) Fund Meeting D V Sadananda Gowda to Meeting P C Mohan to Meeting Tejaswinini Ananthkumar, W/o late H N submit MPLAD study submit MPLAD study Ananth Kumar to submit MPLAD study 4

  5. Key Takeaways of MPLAD Utilization Study ★ Total available funds: 60 cr; Total Utilized funds: 55.53 cr - constituting 92 % utilization (across all three Parliamentary Constituencies) ★ Bengaluru North (100 % utilization) ; Bengaluru Central (95 % utilization); Bengaluru South (82 % utilization) ★ Citizen centric projects undertaken across the three parliamentary constituencies ★ 86 % of the MPLADS fund spent within the BBMP limits; 14 % in off BBMP limits ★ Drinking water and water infrastructure (25.98 %), Infrastructure development (12.62 %) and Public amenities (10.78%) form top three allocations across the three Parliamentary Constituencies ★ Hebbal 13 % in Bengaluru North , Basavangudi 25 % in Bengaluru South and Chamrajpet 28 % in Bengaluru Central form Assembly Constituencies with highest allocation 5

  6. Launch of MPLAD landing page Bengaluru City Parliamentary Constituencies https://bpac.in/election-habba-2019/mp-lad-fund-utilization-study/ 6

  7. MPLAD Analysis: Summary D V Sadananda Gowda P C Mohan Late H N Ananth Kumar Bengaluru North Bengaluru Central Bengaluru South Parliamentary Constituency Parliamentary Constituency Parliamentary Constituency 20.04 19.05 16.44 Total MP LAD fund spent (in INR crores) % utilization 100 % 95 % 82 % Water Infrastructure ₹ 6.36 ₹ 3.73 Water infrastructure ₹ 5.13 Health & Family Welfare ₹ 6.15 Water infrastructure ₹ 2.94 Public amenities ₹ 2.91 Infrastructure dvpmnt Top Spends Sports &Youth Services ₹ 2.76 Railway Infrastructure ₹ 2.86 Trust and Societies ₹ 2.10 from MPLAD Education ₹ 1.29 Public amenities ₹ 2.42 Education ₹ 1.68 fund Sports & Youth Services ₹ 1.76 ₹ 1.22 (in INR Development of women Yoga Kendra and child ₹ 0.86 crores) Key Projects Construction of Volley Ball and Construction of halt station and Construction of foot over bridge at ITPL - ₹ 2.86 cr Basket Ball stadium at Krishnadevaraya Halt Station, Malleshwaram - ₹ 2.15 cr Vijaynagar - ₹ 0.70 cr Supply of medical equipment's to Construction of RCC drains and Vani Vilas and Victoria Hospital - Construction of Multipurpose asphalting of roads - ₹ 0.70 cr ₹ 3.38 cr halls - ₹ 1.75 cr 7

  8. MPLAD Analysis: Bengaluru North Parliamentary Constituency 8

  9. Key Observations: Bengaluru North Parliamentary Constituency • The entire amount of Rs. 20 crores for the reference period was utilized. • Drinking water and related infrastructure (31.74%), Infrastructure development (30.68%) and sports and youth services (13.79%) constitute 76 % of the allocation under MPLADS • 30 % of the works under MPLADS funds were undertaken in the Assembly Constituencies which are beyond BBMP Limits. • Hebbal (13%), Malleshwaram (12%) and Yeshwantpura (11%) constitute 35 % of the work allocation under MPLADS funds 9

  10. MPLAD Analysis: Bengaluru Central Parliamentary Constituency 10

  11. Key Observations: Bengaluru Central Parliamentary Constituency • Health and Family Welfare (19.5%), Drinking water and related infrastructure (15.43%) and Railway infrastructure (15.01%) constitutes 50 % of allocation under MPLADS • Chamrajpet (28%), Mahadevpura (20%) and Sarvagnanagar (12%) constitute 60 % of the work allocation under MPLADS funds . • Areas in the Off BBMP limits of the PC has received allocation of ₹ 2.12 crores (11.13%) 11

  12. MPLAD Analysis: Bengaluru South Parliamentary Constituency 12

  13. Key Observations: Bengaluru South Parliamentary Constituency • Drinking water and related infrastructure (31.17%), public amenities (17.70%) and Trust and societies (12.77%) constitute 60 % allocation under MPLADS • Basavangudi (25%), Vijaynagar (16%) and Chickpet (14%) constitute 55 % of the work allocation under MPLADS funds • 2014-15 (20 %) , 2015-16 (16 %) of the MPLAD funds spent on Multipurpose halls 13

  14. THANK YOU forbangalore@bpac.in 14

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend