Thursday, April 4 th , 2019 Lok Sabha Elections 2019 NAMMA - - PowerPoint PPT Presentation

thursday april 4 th 2019 lok sabha elections 2019
SMART_READER_LITE
LIVE PREVIEW

Thursday, April 4 th , 2019 Lok Sabha Elections 2019 NAMMA - - PowerPoint PPT Presentation

MPLAD FUND UTILIZATION STUDY REPORT Bengaluru City Parliamentary Constituencies Suddi Mane, Press Club of Bengaluru Thursday, April 4 th , 2019 Lok Sabha Elections 2019 NAMMA BENGALURU PRIDE REGISTER | VOTE | PARTICIPATE MPLAD STUDY


slide-1
SLIDE 1

MPLAD FUND UTILIZATION STUDY REPORT

Bengaluru City Parliamentary Constituencies

Suddi Mane, Press Club of Bengaluru Thursday, April 4th, 2019

slide-2
SLIDE 2

REGISTER | VOTE | PARTICIPATE

2

MPLAD STUDY PERFORMANCE of MP COMPREHENSIVE CANDIDATE INFORMATION CITIZENS MEET CANDIDATE INDEPENDENT CRITERIA BASED ASSESSMENT DON’T GIVE UP ON DEMOCRCY ETHICAL ELECTIONS

Lok Sabha Elections 2019

NAMMA BENGALURU PRIDE

slide-3
SLIDE 3

Members of Parliament Local Area Development Fund (MPLAD)

About MPLADS

  • MPLADS scheme: Developmental works in the Parliamentary Constituency
  • INR 5 cr per annum is allocated to the MP’s per Parliamentary Constituency

Study Objective

  • To

analyze the utilization level

  • f

MPLADS in the three Parliamentary Constituencies which are under Bangalore Urban district.

Methodology

  • Phase 1: Data collection and compilation – Data collected from the District

Collector (DC) office for 4 financial years 2014-15 to 2017-18.

  • Phase 2: Analysis of the data
  • Phase 3: Validating the analyzed data from the MP’s office

3

slide-4
SLIDE 4

Members of Parliament Local Area Development Fund (MPLAD) Fund

Meeting D V Sadananda Gowda to submit MPLAD study Meeting Tejaswinini Ananthkumar, W/o late H N Ananth Kumar to submit MPLAD study Meeting P C Mohan to submit MPLAD study

4

slide-5
SLIDE 5

Key Takeaways of MPLAD Utilization Study

★ Total available funds: 60 cr; Total Utilized funds: 55.53 cr - constituting 92 % utilization (across all three Parliamentary Constituencies) ★ Bengaluru North (100 % utilization) ; Bengaluru Central (95 % utilization); Bengaluru South (82 % utilization) ★ Citizen centric projects undertaken across the three parliamentary constituencies ★ 86 % of the MPLADS fund spent within the BBMP limits; 14 % in off BBMP limits ★ Drinking water and water infrastructure (25.98 %), Infrastructure development (12.62 %) and Public amenities (10.78%) form top three allocations across the three Parliamentary Constituencies ★ Hebbal 13 % in Bengaluru North , Basavangudi 25 % in Bengaluru South and Chamrajpet 28 % in Bengaluru Central form Assembly Constituencies with highest allocation

5

slide-6
SLIDE 6

Launch of MPLAD landing page

Bengaluru City Parliamentary Constituencies

6

https://bpac.in/election-habba-2019/mp-lad-fund-utilization-study/

slide-7
SLIDE 7

MPLAD Analysis: Summary

D V Sadananda Gowda Bengaluru North Parliamentary Constituency P C Mohan Bengaluru Central Parliamentary Constituency Late H N Ananth Kumar Bengaluru South Parliamentary Constituency Total MP LAD fund spent (in INR crores) 20.04 19.05 16.44 % utilization 100 % 95 % 82 % Top Spends from MPLAD fund (in INR crores) Water Infrastructure ₹ 6.36 Infrastructure dvpmnt ₹ 6.15 Sports &Youth Services ₹ 2.76 Education ₹ 1.29 Development of women and child ₹ 0.86 Health & Family Welfare ₹ 3.73 Water infrastructure ₹ 2.94 Railway Infrastructure ₹ 2.86 Public amenities ₹ 2.42 Sports & Youth Services ₹ 1.76 Water infrastructure ₹ 5.13 Public amenities ₹ 2.91 Trust and Societies ₹ 2.10 Education ₹ 1.68 Yoga Kendra ₹ 1.22 Key Projects Construction of Volley Ball and Basket Ball stadium at Malleshwaram - ₹ 2.15 cr Construction of RCC drains and asphalting of roads - ₹ 0.70 cr Construction of halt station and foot over bridge at ITPL - ₹ 2.86 cr Supply of medical equipment's to Vani Vilas and Victoria Hospital - ₹ 3.38 cr Construction of Krishnadevaraya Halt Station, Vijaynagar - ₹ 0.70 cr Construction of Multipurpose halls - ₹ 1.75 cr

7

slide-8
SLIDE 8

MPLAD Analysis: Bengaluru North Parliamentary Constituency

8

slide-9
SLIDE 9

Key Observations: Bengaluru North Parliamentary Constituency

  • The entire amount of Rs. 20 crores for the reference period was utilized.
  • Drinking water and related infrastructure (31.74%), Infrastructure development (30.68%) and sports and

youth services (13.79%) constitute 76 % of the allocation under MPLADS

  • 30 % of the works under MPLADS funds were undertaken in the Assembly Constituencies which are

beyond BBMP Limits.

  • Hebbal (13%), Malleshwaram (12%) and Yeshwantpura (11%) constitute 35 % of the work

allocation under MPLADS funds

9

slide-10
SLIDE 10

MPLAD Analysis: Bengaluru Central Parliamentary Constituency

10

slide-11
SLIDE 11

Key Observations: Bengaluru Central Parliamentary Constituency

  • Health and Family Welfare (19.5%), Drinking water and related infrastructure (15.43%) and Railway

infrastructure (15.01%) constitutes 50 % of allocation under MPLADS

  • Chamrajpet (28%), Mahadevpura (20%) and Sarvagnanagar (12%) constitute 60 % of the work

allocation under MPLADS funds .

  • Areas in the Off BBMP limits of the PC has received allocation of ₹ 2.12 crores (11.13%)

11

slide-12
SLIDE 12

MPLAD Analysis: Bengaluru South Parliamentary Constituency

12

slide-13
SLIDE 13

Key Observations: Bengaluru South Parliamentary Constituency

  • Drinking water and related infrastructure (31.17%), public amenities (17.70%) and Trust and societies

(12.77%) constitute 60 % allocation under MPLADS

  • Basavangudi (25%), Vijaynagar (16%) and Chickpet (14%) constitute 55 % of the work allocation

under MPLADS funds

  • 2014-15 (20 %) , 2015-16 (16 %) of the MPLAD funds spent on Multipurpose halls

13

slide-14
SLIDE 14

THANK YOU

forbangalore@bpac.in

14