This is a digital document from the collections of the Wyoming Water - - PDF document

this is a digital document from the collections of the
SMART_READER_LITE
LIVE PREVIEW

This is a digital document from the collections of the Wyoming Water - - PDF document

This is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library. For additional information about this document and the document conversion process, please contact WRDS at wrds@uwyo.edu and include the


slide-1
SLIDE 1

This is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library. For additional information about this document and the document conversion process, please contact WRDS at wrds@uwyo.edu and include the phrase “Digital Documents” in your subject heading. To view other documents please visit the WRDS Library online at: http://library.wrds.uwyo.edu Mailing Address: Water Resources Data System University of Wyoming, Dept 3943 1000 E University Avenue Laramie, WY 82071 Physical Address: Wyoming Hall, Room 249 University of Wyoming Laramie, WY 82071 Phone: (307) 766-6651 Fax: (307) 766-3785 Funding for WRDS and the creation of this electronic document was provided by the Wyoming Water Development Commission (http://wwdc.state.wy.us)

slide-2
SLIDE 2

ROCK SPRINGS PIPELINE LEVEL II PRESEN'rATION TO WYOMING WATER DEVELOPMENT COMMISSION

1989

THE STATE '\~:1J

  • OF WYOMING

Forsgren Associates 75 Yellow Creek Road, #302 Evanston, Wyoming 82930

slide-3
SLIDE 3

ROCK SPRINGS PIPELINE LEVEL II STUDY

FUNDED BY

WYOMING WATER DEVELOPMENT COMMISSION

SPONSORED BY

GREEN RIVER * ROCK SPRINGS * SWEETWATER COUNTY JOINT POWERS WATER BOARD Ilia FOR S G R E N

~-

_

ASSOCIATES 7 P.A.

slide-4
SLIDE 4

ROCK SPRINGS WATER SYSTEM SUMMARY OF PROBLEMS

1) INADEQUATE SUPPLY CAPACITY (INTAKE & TRANSMISSION LINE)

  • PRESENT GROWTH LIMITATION
  • 12 1/2% OF POPULATION NOT SERVED
  • INABILITY TO ACCOMMODATE ECONOMIC EXPANSION

2)

EXCESSIVE PUMPING COSTS

  • UNDERSIZED EXISTING TRANSMISSION LINE
  • DOUBLE PUMPING/CONTINUOUS PUMPING
  • 18 PUMP STATIONS -

ONLY 7 NEEDED

  • LACK OF DEDICATED TRANSMISSION/PEAKING STORAGE

3)

POOR SYSTEM RELIABILITY/ POTENTIAL SERVICE INTERRUPTION

  • LACK OF SYSTEM BACK-UP
  • LACK OF ADEQUATELY SIZED &: LOCATED BACK-UP STORAGE
  • RELIANCE ON CONTINUOUS PUMP OPERATION
  • AGING &- DETERIORATION SYSTEM COMPONENTS
  • NO STANDBY POWER (2 DAYS WITHOUT WATER LAST SUMMER)

JIj! FOR S G R E N

_

ASSOCIATES I P .A.

slide-5
SLIDE 5

PUMPING VS CAPACITY

EXISTING 20" AC PIPELINE

80~-~

7000 6000 5000 4000 3000 2000 1000 2020 PEAK DAY - 15.14 (VEL - 10.7 f'ps) 2020 AVE. SUMMER DAY - 13.14 MGD (VEL - 9.3 fps) 1988 PEAK DAY INCLUDING AREAS NOT SERVED -

11.01 MGD

(VEL - 7.8 fps) 1988 PRESENT PEAK DAY - 9.78 MGD (VEL - 6,9 fps) DESIRABLE OPERATING RANGE (VEL - 2.8 TO 5.0 fps) 1988 AVE. SUMMER DAY- 8.52 MGD (VEL - 6.8 fps)

  • ~-~-~-~-~-~-~-~-~ o

2

4

6

8 10 12 14

16

PIPELINE FLOw (MGD)

FIGURE 5,2

__________________________________ ..

~MOEN

__________________________________

_

.... __

,,,.A.

slide-6
SLIDE 6

ROCK SPRINGS LEVEL 11

SUMMARY OF RECOMMENDED IMPROVEMENTS

* NEW 30" ROCK SPRINGS PIPELINE

  • SUPPLY FOR ENTIRE ROCK SPRINGS AREA
  • 4 MG PEAKING STORAGE -

ELIMINATE 6 PUMP STATIONS

* NORTHSIDE WATER SUPPLY

  • SUPPLY AREAS NOT SERVED
  • ALLOW FUTURE GROWTH
  • 2 MG STORAGE TANK
  • ELIMINATE 3 PUMP STATIONS

* STASSINOS WATER SUPPLY

  • SUPPLY 10-MILE DISTRICT
  • 150, 000 GALLON STORAGE

* EAST SIDE WATER SUPPLY

  • SUPPLY EASTSIDE AREAS
  • ELIMINATE 5 PUMP STATIONS
  • 3 MG STORAGE TANK

* NEW RAW WATER INTAKE FACILITY

  • ABANDON EXISTING
  • SEDIMENTATION POND
  • INCREASED CAPACITY
  • BETTER LOCATION & MAINTENANCE

JEri FOR S G R E N

  • =

ASSOCIATES I P.A.

slide-7
SLIDE 7

ROCK SPRINGS PIPELINE LEVEL '

11 STUDY

RECOM. MENDED' PROJECT OVERVIEW

PROPOSED FACILITY LEGEND PROPOSED PIPELINE TANK PUMP STATION

ROCK

SPRINGS

~

  • \ .

!'

slide-8
SLIDE 8

ROCK SPRINGS LEVEL 11 RECOMMENDATIONS PROJECT BUDGET

* CONSTRUCTION COSTS:

  • 30" ROCK SPRINGS PIPELINE/

BLAIRTOWN STORAGE

  • NORTHSIDE WATER SUPPLY
  • STASSINOS WATER SUPPLY
  • EASTSIDE WATER SUPPLY
  • GREEN RIVER INTAKE FACILITY

SUBTOTAL

* ENGINEERING COSTS~·

  • DESIGN/SURVEY/PERMITTING
  • CONSTRUCTION SERVICES (10%)

SUBTOTAL

* 15% CONTINGENCY:

TOTAL PROJECT BUDGET

33% LOCAL SHARE

$ 9,248,000

2,113,000 2,830,000 596,000 2,417, 000

$ 1,100,000

1,720,000

* ANNUAL LOAN PAYMENT (4% -

40 YEAR):

* GREEN RIVER SHARE == $ 18,873/YEAR

* ROCK SPRINGS 4REA SHARE == $ 365,000/YEAR

jiii FOR S G R E N

==

ASSOCIATES I P .A.

$ 17,204,000

$ 2,820,000 $ 3, 000, 000

I

$ 23,024,000 I

I

$

7,597,920 I

I

$ 383,873.00 I

slide-9
SLIDE 9

ROCK SPRINGS LEVEL II RECOMMENDATIONS COST -

BENEFIT ANALYSIS

*

NON-QUANTIFIABLE BENEFITS

  • HEALTH & SAFETY
  • FUTURE ECONOMIC GROWTH
  • PROPERTY VALUE INCREASE
  • CONSTRUCTION SPIN-OFF

*

COST BENEFIT RATIO

3D-YEAR, PRESENT WORTH, 1% GROWTH ADDITIONAL TREATED WATER DELIVERED

ELECTRICITY COST DIFFERENCE PUMP STATION 0 & M REDUCTION 30-YEAR, PRESENT WORTH, 1/2% GROWTH ADDITIONAL TREATED WATER DELIVERED ELECTRICITY COST DIFFERENCE PUMP STATION 0 &: M REDUCTION FOR S G R E N

ASSOCIATEs 7 P .A.

$ 18,960,000

6,133,000 554,000

$ 25,647,000 /$ 23,024,000

11,11 I

$ 13,411,000

5,041,000 554,000 $ 19,006,000 /$ 23,024,000 10.831

slide-10
SLIDE 10

ROCK SPRINGS LEVEL 11

ABILITY TO PAY ANALYSIS "PRESENT POPULATION"

* PRESENT "EQUIVALENT' WATER USERS

CITY OF ROCK SPRINGS WATER USERS

FUTURE SERVICE AREA WATER USERS

TOTAL E)(ISTING WATER USERS

* PROJECTED WATER USER RATES

11, 1

95

540 EXISTING MONTHLY WATER BILLING

$ 22.95

ROCK SPRINGS PIPELINE PROJECT BILLING

2.59 11,735 TOTAL PROJECTED MONTHLY BILLING

$ 25.54

* POTENTIAL ENERGY COST SA VINGS

  • 1.34

* POTENTIAL MONTHLY WATER USER RATE 1$ 24.20 I

j!i~

FOR S G R E N

  • ;

ASSOCIATES 7 P.A. ----------=--

slide-11
SLIDE 11

APPENDIX: Detailed Information

slide-12
SLIDE 12

ROCK SPRINGS LEVEL II RECOMMENDATIONS ROCK SPRINGS TRANSMISSION LINE

*

NEW 30" T. W. STEEL OR D.I. PIPELINE

* PREFERRED NORTHSIDE ROUTING

* ABANDON SIX PUMP STATIONS

  • WEST, MIDDLE, EAST KANDA
  • SWEETS

*

REPLACE GREEN RIVER PUMPS

  • INDUSTRIAL
  • BLAIRTOWN

*

CONSTRUCT NEW 4 MG BLAIRTOWN TANK

FORSGREN

AssocIATES I p.A.

slide-13
SLIDE 13

r-

(/.)

D

U

18 16 14 12

10 8 6

4

2

  • FUTURE 30- YEAR

REPLACEMENT OF

20' AC LINE

  • OPTIMAL PIPE

SIZE = 30' TOTAL 30-YEAR p,,,,, COST PIPELINE/PUMP STATION

CONSTRUCTION COST

/ 30-YEAR P

  • ..,.

ENERGY COST

  • 30-YEAR COMPARITIVE

~

4 MG BLAIRTo'WN

TANK CONSTRUCTION

  • to. M

24"

30" 36//

PIPE DIAMETER

ROCK SPRINGS PIPELINE

OPTIMAL PIPE SIZE

._. n~

~G

R E N OC T

I P.A.

FIGURE 8.1

slide-14
SLIDE 14

ROCK SPRINGS LEVEL II RECOMMENDATIONS NEW NORTHSIDE TRANSMISSION

*

NEW 14 TO 18 INCH PVC TRANS. LINE TO WHITE MOUNTAIN

*

DIRECT SUPPLY FOR CLEARVIEW & WHITE MOUNTAIN DISTRICTS

*

SUPPLEMENTAL SUPPLY TO ROCK SPRINGS NORTHSIDE AREA

*

NEW 2 MG WHITE MOUNTAIN TANK

*

TWO NEW PUMP STATIONS

  • RETROFIT INDUSTRIAL
  • CONSTRUCT WHITE MOUNTAIN

* ABANDON THREE OLD PUMP STATIONS

  • FOOTHILLS
  • ELK STREET

* ABANDON CLEAR

VIEW TANKS

.~1i

1

~

~

S G R E N

S oe ATES I P.A.

  • OUTLAW
slide-15
SLIDE 15

ROCK SPRINGS LEVEL II RECOMMENDATIONS

10-MILE WATER & SEWER DISTRICT (STASSINOS)

*

NEW 8-INCH PVC TRANS. LINE FROM WHITE MOUNTAIN TO STASSINOS

*

NEW 0.15 MG STORAGE TANK AT STASSINOS

*

GRAVITY-FED SUPPLY - NO PUMP STATIONS

FOR S G R E N

ASSOCIATES I P.A.

slide-16
SLIDE 16

ROCK SPRINGS LEVEL II RECOMMENDATIONS NEW EASTSIDE TRANSMISSION

*

NEW 18" PVC TRANSMISSION

*

HIGHWAY 376 ROUTING

*

NEW 3 MG EASTSIDE STORAGE

*

CONSTRUCT NEW EASTSIDE PUMP STATION

* ABANDON FIVE OLD PUMP STATIONS

  • THOMPSON
  • D STREET
  • SUNSET
  • BIGHORN
  • EDGAR

* ABANDON THREE TANKS

  • EDGAR
  • SUNSET
  • PALISADES

FORSGREN

ASSOCIATEs J P.A.

slide-17
SLIDE 17

ROCK SPRINGS LEVEL II RECOMMENDATIONS NEW RAW WATER INTAKE FACILITY

* ABANDON EXISTING INTAKE FACILITY *

CONSTRUCT NEW FACILITY NEAR TREATMENT PLANT

  • 90,000 SF SETTLEMENT BASIN
  • 16,000 GPM CAPACITY
  • CUT-OFF WALL/CHANNEL STABILIZATION
  • AUTOMATED MAINTENANCE FEATURES
  • SLUDGE DRYING BEDS

FORSGREN

ASSOCIATES I P

.A.

slide-18
SLIDE 18

ZONE 1 ZONE 2 ZONE 3 ZONE .. ZONE 5 ZONE 6 ZONE 7 ZONE 8 ZONE 9 ZONE 10 ZONE 11 ZONE 12 ZONE 13 ZONE H

CLEARVIE'J

SOUTH

RESERVOIR

32

5

8

17

LEGEND

EXISTING BASE ZONE EXISTING FOOTHILLS ZON::

33

16

EXISTING 'w'ASHINGTON AVE. ZONE EXISTING THOMPSON STREET ZONE EXISTING BIG HORN ZONE EXISTING SPRINGS DRIVE ZONE21 EXISTING EDGER STREET ZONE EXISTING SUNSET ZONE EXISTING COLLEGE ZONE EXISTING OUTLA'w' ZONE EXISTING ELK STREET ZONE EXISTING S'w'EETS ZONE EXISTING HILL TOP ZONE EXISTING RELIANCE ZONE

29

.....

INDUSTRIAL PUMP STATION

CITY

34 22

OF

11

LIONKOL

  • RESERVOIR

24

ROCK SPRINGS

If)

  • ~

20 N.

  • 19

30

SUNSET PUMP

STATlDN

31

  • T. 19 N.

6

PRESENT SERVICE ZONES AND SYSTEM COMPONENTS

~

__________________________________

j_~FORSQREN

________

Fl_G_URl

_____

5_.3

________________

  • ,

5£ AeeoCIATa I ,.

...

slide-19
SLIDE 19
  • MATC

32 33

5

5

8

17

LEGEND ZONE 1 PROPOSED BASE ZONE ZONE 2 PROPOSED WIND RIVER ZONE

1

~ ZONE 3 PROPOSED WASHINGTON AVE. ZONE ZONE 4 PROPOSED EAST SIDE ZONE ZONE 5 PROPOSED "HLTE MOUNTAIN ZONE 6 ' PROPOSED GATEWAY ZONE PR[1POSED IMPROVEMENTS

ZONE

rACIUTlES TO BE ABANDONED

X

29

TIE T(]

CLEARVIE'w'

L-..

"""' ..

INDUSTRIAL

PUMP

STATION

34

  • ZO

2 ~

  • t:J

~

~ ~ CJ

  • ~
  • ..J

;::;

~

22

  • 11

\

  • L ~

L .R

~

DIR

4

\

1

ZONE 5 ZONE 5

24 20

ZONE 5

29

Lf)

  • .......
  • T. 20 N.
  • I
  • 6
  • I
  • I 19
  • I

30

31

  • T. 19 N.

6

CITY OF ROCK SPRINGS

PROPOSED SERVICE ZONES AND SYSTEM COMPONENTS

~

________________________________

IFO~EN

__________

r_lG_U_R_£_8_._2 ______________

~

~".A.

slide-20
SLIDE 20

CHANNEL STABLIZATION AS RECD. CTYP) CUTOf'f' \lALL INLET ISOLA nON GATES (MUL TIPLE GA TES AT VARIABLE LEVELS) GRAVEL RDAD TO DRYING BEDS TREATMENT PLANT ~ CLARIFIER TANKS Y

1/

II

1/

( 'WINTER BYPASS , PIPE TD PREVENT

1/

=:::::-~

BASIN ICING

1/

~ {PUMP

=========

'WEIR 'WALL

\II TRASH RACK,

MECHANICAL CLEANER..

& COLLECTION TROUGH

  • BAFF'LE 'WALL

& \JALK'WAY 'WI f'IREHOSE CONNECTIONS

  • = = -1

DISCHARGE RA'J '.lATER 'WET 'WELL

& PUMP HOUSE

SLUICING CHANNEL

FORSGREN

ASSOCIATES / P.A.

DIVERsmN

~NEL

... ElR 'WALL

SECTION

TRASH COLLECTIDN TRDUGH (SIZED TO ACCDMODATE BOBCAT DR LOADER

PRELIMINARY INTAKE

FACILITY LAYOUT

FIGURE 8.3