The The Moor oors at at Arne Arne Pr Project Stakeholder Liaison Group Meeting From a photo: Graham 12 September 2018 Hatherley 1 Introductions 10 mins St Stak akeholder eholder 2 The Moors at Arne Project Brief introduction to the 15 mins


slide-1
SLIDE 1

From a photo: Graham Hatherley

The The Moor

  • ors at

at Arne Arne Pr Project

Stakeholder Liaison Group Meeting 12 September 2018

slide-2
SLIDE 2

St Stak akeholder eholder Liaison Liaison Gr Group

  • up

Agenda Agenda

1 Introductions 10 mins 2 The Moors at Arne Project Brief introduction to the project 15 mins 2 Terms of Reference 10 mins 3 Contracting Clarify role of the Group etc 10 mins 4 Update on the Project and Feedback / discussion 1) Flooding 2) Public Access 3) Construction traffic 4) Location of main embankment 5) Siltation 40 mins 6 Future topics for discussion Group and project team to suggest topics 10 mins 7 Next steps in the Project 10 mins 8 Date of next meeting 9 Close

slide-3
SLIDE 3

In Intr troductio tions

Project Team: Environment Agency Helen Morgan, Neil Watson, Catherine Farrugia, Kevin House, Vanessa Dare RSPB Dante Munns Natural England Ian Alexander

slide-4
SLIDE 4

In Intr troductio tion to to the the Pr Project

Neil Watson

slide-5
SLIDE 5

SM SMP & Str Strategy gy

  • Shoreline Management Plan (Policy 2012)
  • Poole & Wareham Strategy (2015)
  • Poole Harbour Habitat Creation Review
slide-6
SLIDE 6

SM SMP & Str Strategy gy

  • Shoreline Management Plan (Policy)
  • Poole & Wareham Strategy (Detail)
  • Poole Harbour Projects
slide-7
SLIDE 7

SM SMP & Str Strategy gy

  • Shoreline Management Plan (Policy)
  • Poole & Wareham Strategy (Detail)
  • Poole Harbour Projects

The Strategy approach is Managed Realignment / Minimum Maintenance

slide-8
SLIDE 8

Habitat Creation Requirements

slide-9
SLIDE 9

Habitat Creation Requirements

slide-10
SLIDE 10

Habitat Creation Requirements

slide-11
SLIDE 11

Habi Habitat Cr Crea eation tion Obj Objectiv ctives es

  • Working with Natural Processes
  • Developing a mosaic of Intertidal habitats across the site including:

Saltmash Mudflat Saline Lagoons

  • Protecting rare and irreplaceable habitats in situ – Cladium Fen
slide-12
SLIDE 12

The The Moor

  • ors at

at Arne Arne Pr Project

slide-13
SLIDE 13

The The Moor

  • ors at

at Arne Arne Pr Project

Site Area: Red = RSPB Blue = Natural England Yellow = Arne Road

slide-14
SLIDE 14

The The Moor

  • ors at

at Arne Arne Pr Project

slide-15
SLIDE 15

The Moors at Arne

V i e w

slide-16
SLIDE 16
slide-17
SLIDE 17
slide-18
SLIDE 18
slide-19
SLIDE 19
slide-20
SLIDE 20
slide-21
SLIDE 21

Short Short Lis Listed ed Opti Options

  • ns (1a)

(1a) – L – Lagoons in in the the We West

slide-22
SLIDE 22

Short Short Lis Listed ed Opti Options

  • ns (1b)

(1b) – L – Lagoons in in the the Ea East

slide-23
SLIDE 23

Short Short Lis List Opti Options

  • ns (1c)

(1c) – E – Eastern Br Breaches eaches

slide-24
SLIDE 24

Engagement with public and stakeholders

slide-25
SLIDE 25

Project Appraisal Investigations

  • Fluvial
  • Tidal
  • Groundwater
  • Surface Water
  • Ground Investigations
slide-26
SLIDE 26

Hydrological Modelling

  • Method
  • Catchments
  • Ridge inputs
  • Stream water storage on the Moors
  • Impact of proposed embankment

and outfall structure

slide-27
SLIDE 27

Inter‐tidal modelling

  • Flows
  • Salinity
  • Sediment movement
  • Interaction with R. Frome
slide-28
SLIDE 28

Ridge & Arne Moors Groundwater

  • Responding
  • Monitoring
  • Interpretation
slide-29
SLIDE 29

Ridge Surface Drainage Investigations

  • Responding to concerns
  • Survey and results shared
  • Impact on project understood
  • Liaison with Parish Council
slide-30
SLIDE 30

Ground Investigations/ material suitability

  • Factual description of survey
  • Key findings
  • Settlement & Maintenance
  • Mixing on site
  • Importation
slide-31
SLIDE 31

Project timeline

  • Consultation results
slide-32
SLIDE 32

Te Terms of

  • f

Re Reference

slide-33
SLIDE 33

Con Contracti acting

  • Clarify role of the Group
  • Behaviours
slide-34
SLIDE 34

Upda Updates

  • 1. Flooding
  • 2. Public Access
  • 3. Construction Traffic
  • 4. Location of main embankment
  • 5. Siltation
slide-35
SLIDE 35

Upda Update: Fl Floodi

  • oding

ng

  • Tidal
  • Surface water
  • Ground water
slide-36
SLIDE 36
  • Surface water
  • Ground water
  • Tidal
slide-37
SLIDE 37
  • Surface water
  • Ground water
  • Tidal
slide-38
SLIDE 38
slide-39
SLIDE 39
slide-40
SLIDE 40
slide-41
SLIDE 41

Vi Visit sitor Access Access Pr Principles:

  • Dante
  • We do not want access to have a

negative impact on wildlife

  • We do want to provide access that will

be beneficial to people, especially within local communities

  • RSPB Arne will be the main focus of access
  • We are not proposing any significant

infrastructure at Arne Moors

  • Enable ‘non‐car’ access if possible
  • Limit access to permitted trails and viewing

points

slide-42
SLIDE 42

Upda Update: Cons Constructi truction

  • n

Tr Traffic

  • Excavate material from the site as much

as possible

  • Reduce size and length of embankments

as much as possible

  • Longer, lower embankments – allows use
  • f a wider variety of materials
slide-43
SLIDE 43

Upda Update: Loc Location tion of

  • f

Ma Main em embankm bankmen ent

  • Location of lagoons
slide-44
SLIDE 44

Em Emer erging ging

  • pti
  • ption
  • n
slide-45
SLIDE 45

Upda Update: Silt Siltatio tion in in Ri River er Fr From

  • me

and and Upper Upper Wa Wareham Channel Channel

  • Analysis of historic surveys
  • Results expected later this year
  • Plan to survey area before works start to

establish the baseline conditions

slide-46
SLIDE 46

Futur Future to topics fo for discussion discussion

slide-47
SLIDE 47

Ne Next St Step eps

  • Groundwater Meeting 25 September
  • Public Exhibition – November
slide-48
SLIDE 48

Ne Next St Step eps

Project Stages Long list options Detailed design Preferred option Outline design Short list options Construction drawings Planning Application Outline Business Case Full Business Case EA Internal Audit stages Strategic Outline Case Construction We are here

slide-49
SLIDE 49

Ne Next St Step eps

Project Stages Long list options Detailed design Preferred option Outline design Short list options Construction drawings Planning Application Winter 2019/20 Spring 2019 Early Spring 2020 Timeline November 2016 Construction We are here Spring 2020 – Autumn 2021 Summer 2017

slide-50
SLIDE 50

Ne Next Me Meet eting

  • 18th October?
slide-51
SLIDE 51

Thank you

  • TheMoorsAtArne@environment‐agency.gov.uk
  • https://www.dorsetcoast.com/groups/the‐moors‐at‐arne‐coastal‐

change‐project/