The Regioprop R-80 New Generation Turboprop Q3 2016 PT Regio - - PowerPoint PPT Presentation

the regioprop r 80
SMART_READER_LITE
LIVE PREVIEW

The Regioprop R-80 New Generation Turboprop Q3 2016 PT Regio - - PowerPoint PPT Presentation

R80 REGIONAL TURBOPROP The Regioprop R-80 New Generation Turboprop Q3 2016 PT Regio Aviasi Industri Indonesia The Investment Coordinating Board of the Republic of Indonesia 2 Indonesia Macroeconomy Overview The Investment Coordinating


slide-1
SLIDE 1

The Regioprop R-80 New Generation Turboprop
 R80

REGIONAL TURBOPROP

Q3 2016 PT Regio Aviasi Industri Indonesia

slide-2
SLIDE 2

The Investment Coordinating Board of the Republic of Indonesia

2

slide-3
SLIDE 3

The Investment Coordinating Board of the Republic of Indonesia

3

Indonesia Macroeconomy Overview

slide-4
SLIDE 4

The Investment Coordinating Board of the Republic of Indonesia

4

slide-5
SLIDE 5

The Investment Coordinating Board of the Republic of Indonesia

5

slide-6
SLIDE 6

The Investment Coordinating Board of the Republic of Indonesia

6

Source: Ministry of National Development Agency

Aerospace Industry

  • Increasing of

capacity and quality on airport service in capital of province/ national activity center.

  • Increasing of

Soekarno-Hatta airport capacity, until Supporting Industry

  • Development of

Indonesia Aircraft Industry

  • Development of

Indonesia MRO industry

  • Development of

aviation schools.

  • Increasing of

professionalism

  • n aviation

industry players. Development of Scope on Air Transportation in East of Indonesia

  • Build new

airport to expand service in Kalimantan, Sulawesi, Maluku, Maluku Utara, Papua, and West Papua.

  • Develop new

route to break

Development Plan of Air Transportation

Industry of Aircraft Design and Production Industry of Aircraft Maintenanc e Industry of Aircraft Component s Industry of Aviation Safety

slide-7
SLIDE 7

The Investment Coordinating Board of the Republic of Indonesia

7

In short term (1-5 years)

Source: Ministry of Industry

Supporting Industry on Aerospace (Supplier/ Vendor) that ready for developed

  • UPSTREAM INDUSTRY:
  • Acrylic/glass;
  • Textile;
  • Carpet;
  • Decorative Laminate;
  • Plastic;
  • Rubber;
  • Steel for Tool and Jig.
  • SUPPLIER/VENDOR:
  • Machining Part;
  • Sheet metal part;
  • Radome;
  • Cabin window;
  • Rubber part (Rubber

Seal, Rubber damper);

  • Interior Part (Seat,

Galey, Lavatory);

  • Piping and Welding part.

In long term (5-10 years)

  • UPSTREAM INDUSTRY:
  • Aluminum Alloy;
  • Prepreg/Composite/Fiber;
  • Titanium;
  • Paint;
  • Chemical.
  • SUPPLIER/VENDOR:
  • Avionic;
  • Main Landing Gear;
  • Forging Part;
  • Engine;
  • Wind Shield;
  • Radar;
  • Corrosion Protection.
slide-8
SLIDE 8

8

  • PT Regio Aviasi Industri (RAI) was formed in 2012, to develop the

new twin engine 80 -90 pax regional turboprop, the R80.

  • The key market placement is domestic Indonesia, Asia Pacific,

Middle East, Africa and South America.

  • RAI is planning to make the first flight of R80 in early 2020 and

entry into market in early 2022.

  • The development cost will require fund in amount of US$ 1.000

millions

  • Current Status and Plan:
  • Phase 1; Feasibility Study and Preliminary Design stage

(completed)

  • Phase 2 :

▪ Preparation, secure funding, vendor selection ▪ Detail Design, Full Scale Prototype Development & First Flight ▪ Certification and First Delivery

R80 PROGRAM

slide-9
SLIDE 9

9

BJ Habibie Chairman Ilham A. Habibie Vice Chairman 2 Ery Firmansyah Vice Chairman 1

A best veteran team has been put in place by RAI that has the experience, connections, and will power to make the R-80 program take off!

slide-10
SLIDE 10

10

Agung B. Ismadi Director of Business and Administration Agung Nugroho President Director Rahayu S Arifin Corp Secretary Harry Wiguna Director of Finance Tjahjo kartiko Director of Technology

Top management of RAI has abundant experience in aviation industry as well as aircraft design

slide-11
SLIDE 11

11

Turboprop deliveries by Seats 2013-2032

30-59 Seats 60-89 Seats 90-120 Seats

1147 1715 404

Source: Frost & Sullivan

Market Opportunity Assessment

slide-12
SLIDE 12

12

North America Africa Europe CIS & Russia Asia Pacific Middle East Source: Frost & Sullivan Market Analysis Latin America

World Turboprop Deliveries, 2013 - 2032

279 303 603 225 164 94 47

Asia Pacific will attract more than one-third of world turboprop deliveries

slide-13
SLIDE 13

Market Opportunity Assessment

Indonesia shows tremendous potential for aviation – it is already the 12th largest market in the world and yet only 6% of its 250 million population have ever flown!

Source: Ministry of Transportation, Indonesia

slide-14
SLIDE 14

Market Opportunity Assessment

Most routes (81%) in Indonesia are short haul and hence very suitable for turboprop aircraft with cost and flight time benefits

0% 25% 50% 75% 100% 20 40 60 80

>200 200<X<300 300<X<400 400<X<500 >500

Number of routes Routes (%) Cumulative (%)

19% 7% 12% 26% 36%

37 14 24 52 71

36% 26% 12% 7% 19%

The Number of Routes in Indonesia Based on Distance (nm), 2013

Route distance (NM) Number of routes Source: RAI Analysis

  • Aircraft with 400

NM range will cover 74% of routes within Indonesia

  • And 62% of the

routes are of <300 NM range

  • A turboprop can

serve the Indonesian market effectively

slide-15
SLIDE 15

15

R80 Design Concept

High Payloads Low Direct Operating Cost Quick Turn Around Time Efficient Engine Optimum Structure design Easy Maintenance & High Dispatch Reliability Excellent Passenger Comfort State of the Art Fly by Wire Modern Cockpit Design

slide-16
SLIDE 16

16

Basic Configuration (80 Pax @ 29” Pitch)

  • R80 Base Configuration: 80 Pax @ 29” pitch
  • R80 Cargo Volume: 17,4 m3 (ATR72 is 9,4 m3 and Q400 is 14,2

m3)

slide-17
SLIDE 17

17

R80 Specification

Weight and Capacity:

  • MTOW

: 27,500 kg

  • MLW

: 26,900 kg

  • MOEW

: 16,900 kg

  • Max. Payload

: 8,780 kg @ 400 nm

  • Max. Fuel : 4,500 kg
  • Pax Number

: 80 Pax

Range and Operation:

  • Design Range : 800 nm (1,480

km)

  • Range @ max. P/L : 400 nm (740 km)
  • Max. Cruising Speed : 330 kts (611 kmh)
  • Econ Cruising Speed : 290 kts (537 kmh)
  • Cruising Altitude

: 25,000 ft

  • Balanced Field Length : 4,500 ft
slide-18
SLIDE 18

18

Coverage Area < 400 Nautical Mile

Radius @400 nm

Ambon Medan Jakarta Palangkaraya Timika Maumere

slide-19
SLIDE 19

Range Coverage for 800 nm

slide-20
SLIDE 20

20 50 70 90 110 130 Seat Capacity ATR72 Q400 MA600 MA700

Proposed programs (*)

RAI will have the biggest regional turboprop in the market.

R80

50 70 90 110 130 Seat Capacity

*)

  • ATR is considering to develop a turboprop with >100 seats
  • Q400X unlikely to happen in the near future, owing to huge investment for C Series
  • Either case, there is no ready engine to be used for a turboprop of > 100 seats
slide-21
SLIDE 21

21

Cabin Cross Section Comparison

❖ Compared to both competitor, the level of comfort of R80 is better.

  • Aisle Width
  • Aisle Heigth
  • Seat Width
  • IATA Roller
slide-22
SLIDE 22

Phase 2: International Phase 1: Domestic

Potential Customers

3 Potential Customers have signed Letter Of Intents to purchase 145 aircrafts

slide-23
SLIDE 23

Master Phasing Plan R80

  • Engineering: Conceptual Design and Systems Requirement Document
  • Business : LOI 145 unit from domestic Airlines, MOU with BIJB, GMF
  • Supply Chain: Vendor selection, MOU with BavAIRia, UK Trade and

Investment

  • Funding: Government support and campaign to strategic investors

Status Q2 2016 :

2014 2015 2016 2017 2018 2019 2020/2021

Phase 2: Full Scale Development

Phase 1: Pre-Design

Phase 3: Certification and Commercial 2.1 Preparation

2.2 Detail Design 2.3. Prototype

(Funding Secured) Roll Out
 8/2019 First Flight
 03/2020

slide-24
SLIDE 24

GOVERNMENT SUPPORT

1

2

3

  • 1. Presidential

Decree - R80 National Strategic Program.

  • 2. Policies on

Aerospace Industry development.

  • 3. Strengthening the

Government Test Facilities.

  • 4. Funding

Forum Inovasi Nasional, April 2015 President RI letter, October 2015 Next Steps

slide-25
SLIDE 25

BANTEN WEST JAVA

Bogor Bandung Cirebon Jakarta Cilegon Cikampek Tasikmalaya

Existing Toll Roads Planned Toll Roads Existing Railways Planned Railways Kertajati Airport and Aerocity Toll Roads: Jakarta – Cikampek 73 km Cikampek – Kertajati 90 km Cileunyi – Dawuan 60 km

Kertajati Purwakarta

Kertajati Delivery Center of R80
 Strategic Location and Accessibility

slide-26
SLIDE 26

26

Kertajati International Airport

▪International hub airport of numerous domestic and international routes ▪3 parallel runways in master plan, 1,800 Ha airport, 3,500 Ha Aero city ▪Delivery center of R80 aircraft

slide-27
SLIDE 27

27

Courtesy of PT . BIJB Cargo Access Passengers Access

Aerospace Park as Part of Aerocity

Aerospace Park

±380 Ha

5

slide-28
SLIDE 28

Potential Tenants

  • Aircraft Manufacturers: PT

. RAI (to be the anchor tenant), PT . DI

  • Component Manufacturers: INACOM members, manufacturers of

aircraft systems, structures and engine components (Rolls-Royce, GE Aviation, Pratt & Whitney, Snecma, CFM, IAE).

  • Aircraft MRO: GMF

, MMF , IndoPelita, AAR, Air China Technic / Ameco Beijing etc.

  • Engine MRO: Rolls-Royce, GE Aviation, Pratt & Whitney, Snecma,

etc

  • General Aviation Services: FBO, Jet Aviation, TAG Aviation, etc
  • Aviation Logistics: AJW, Aviall, etc
  • Airlines Base: Garuda Indonesia, Citilink, Lion Air, Sriwijaya, etc
  • Air Freight Hub: UPS, FedEx, DHL, JNE, Pos Indnesia, Lion Parcel
  • Training Academies: Pilot Schools, Aircraft Maintenance Training etc.
slide-29
SLIDE 29

Considerations:

▪Negative Investment List ▪International Treaties ▪PMA Company Principle Licence ▪Investment licences – fiscal and non-fiscal ▪Cooperation with local companies ▪Knowledge and skill transfer plan to local partner

Investment Opportunities

Investments

in Aerospace Park Management Company in Aerospace Industry as a tenant in the Aerospace Park

In partnership with PT . Ilthabi Rekatama In partnership with potential tenants

Foreign Investment

slide-30
SLIDE 30

::: Thank you for your kind attention and let us make the R80 flying in cooperation with End of document

slide-31
SLIDE 31