THE LOYOLA ACADEMY MASTER PLAN PHASE 1 - ZBA APPLICATION PRESENTATION SEPTEMBER 6, 2017
THE LOYOLA ACADEMY MASTER PLAN PHASE 1 - ZBA APPLICATION - - PowerPoint PPT Presentation
THE LOYOLA ACADEMY MASTER PLAN PHASE 1 - ZBA APPLICATION - - PowerPoint PPT Presentation
THE LOYOLA ACADEMY MASTER PLAN PHASE 1 - ZBA APPLICATION PRESENTATION SEPTEMBER 6, 2017 LOYOLA ACADEMYS HISTORY & JESUIT MISSION Our Mission To form young women and men for meaningful lives of leadership and service in imitation of
Our Mission To form young women and men for meaningful lives of leadership and service in imitation of Jesus Christ through a college preparatory education in the Jesuit, Catholic tradition.
LOYOLA ACADEMY’S HISTORY & JESUIT MISSION
The Master Planning Process
REALTY CONSULTANTS
INTRODUCING THE TEAM
LAND USE / MASTER PLANNING COMMUNITY ENGAGEMENT LANSDSCAPE ARCHITECTURE TRANSPORTATION PLANNING TRAFFIC MANAGEMENT PARKING ANALYSIS
ARCHITECTURAL SERVICES MARKET STUDY STORMWATER CIVIL ENGINEERING LAND USE & ZONING
Site Analysis
94 94
ILLINOIS ROAD LARAMIE AVENUE NORTH HAPP ROAD NEW TRIER WEST HIGH SCHOOL LOYOLA ACADEMY EDENS PLAZA LAKE AVENUE LAKE AVENUE S K O K I E B O U L E V A R D FRONTAGE ROAD FRONTAGE ROAD WINNETKA ROAD SKOKIE BOULEVARD THE WILMETTE GOLF CLUB WILMETTE PARK DISTRICT
SKOKIE RIVER S K O K I E R I V E R
PROPERTY LIMIT LINE Chapel Tennis Courts (10) Practice Field Bus Drop-- ff
FOREST AVENUE WALNUT AVENUE ELMWOOD AVENUE GREENWOOD AVENUE FRONTAGE ROAD ILLINOIS ROAD LAKE AVENUE THORNWOOD AVENUE BRANCH DRIVE LARAMIE AVENUE
Outlot 1 Outlot 2 Existing Building Library / Commons Pool Loading Dock Athletic Field Maintenance Shed PROPERTY LIMIT LINE (1) Residential Structure94
LEGEND
A B C D OPEN SPACE WEST OF LARAMIE NORTH CAMPUS CIRCULATION CAMPUS OPEN SPACE NORTH COURTYARD WEST ENTRY PLAZA SOUTH CAMPUS CIRCULATION SOUTH ENTRANCE NEAR POOL CAMPUS PARKING LOT CAR STACKING IN THORNWOOD E F G H I
(2) Residential StructuresA B C D E F G H I
REGIONAL CONTEXT & EXISTING CONDITIONS ANALYSIS
SCOTT FRERES
SCOTT FRERES
DEVELOPMENT REGULATION ZONING MAP
SCOTT FRERES
EXISTING CONDITIONS
Community Engagement
LOYOLA COMMUNITY LOYOLA NEIGHBORS WILMETTE COMMUNITY
SCOTT FRERES
THREE COMMUNITY AUDIENCES
Stacking Moved onto Campus Improved Traffjc Management & Circulation New Stormwater Solutions Improved Parking Maintaining Neighborhood Open Space Enhanced Communication Better Safety and Traffjc Management
SCOTT FRERES
INITIAL OUTREACH & LISTENING SESSIONS COMMUNITY PRIORTIES
SCOTT FRERES
TWO OPEN HOUSES JANUARY OPEN HOUSE
SCOTT FRERES
TWO OPEN HOUSES JUNE NEIGHBORHOOD COOKOUT
Campus Master Plan
SCOTT FRERES
MASTER PLAN OVERALL LONG-TERM MASTER PLAN VISION
ENLARGEMENT
ENLARGEMENT
SCOTT FRERES
MASTER PLAN PHASE 1
“the now plan”
Pool 3D Diagram Massing Diagram \ Pool 3D Diagram Massing Diagram \
“the now plan”
SCOTT FRERES
NEW AQUATICS CENTER
“the now plan”
SCOTT FRERES
NEW AQUATICS CENTER
“the now plan”
LARAMIE AVENUE LARAMIE AVENUE LARAMIE AVENUE NEW TENNIS COURTS
SCOTT FRERES
OLD TENNIS COURTS
PARKING & TRAFFIC CIRCULATION/MANAGEMENT IMPROVEMENTS
ENLARGEMENT
“the now plan”
SCOTT FRERES
SITE & LANDSCAPE ENHANCEMENTS LANDSCAPING
“the now plan”
BIKE RACKS NEW MONUMENT SIGN AT MANAGED ACCESS DRIVE THERMOPLASTIC CROSSWALK VEHICULAR LIGHT FIXTURES DECORATIVE METAL FENCE BOLLARD LIGHT FIXTURES
SCOTT FRERES
SITE & LANDSCAPE ENHANCEMENTS SITE ELEMENTS
“the now plan”
SCOTT FRERES
SITE & LANDSCAPE ENHANCEMENTS STORMWATER
Focused Parking, Traffjc & Stormwater Discussion
- To the extent possible, undertake efforts to improve
traffjc fmow through the Lake/Laramie intersection during times of student arrival and dismissal
- Implement peak period access restrictions to facilitate
new on-site drop-off, pick-up, and stacking
- Adjust access and circulation routes to eliminate
confmicts on Laramie Avenue
- Maintain on-site staging for Pace Bus during dismissal
VEHICLE ACCESS & TRAFFIC FLOW
PETER LEMMON
- Shift school dismissal time up to reduce overlap with
New Trier’s West Campus
- Provide capacity for all drop-off/pick-up stacking on site
- Deploy portable “No Student Drop-Off/Pick-Up” signs
- n neighborhood streets
- Post traffjc control aides at key external locations
DROP-OFF / PICK-UP
PETER LEMMON
PETER LEMMON
PARKING & TRAFFIC MANAGEMENT PLAN CIRCULATION
“make it better”
- Allow visitor parking within the new dual-lane student
loading area
- Student parking permits to represent 75% of senior class
- Install new fencing along Laramie Avenue to direct
pedestrians to marked/controlled crosswalks
- Install new crosswalk on Laramie Avenue at
Greenwood Avenue/School Exit
PARKING & PEDESTRIANS
Parking Pedestrians
PETER LEMMON
ENLARGEMENT
PARKING & TRAFFIC MANAGEMENT PLAN PARKING
“make it better”
PETER LEMMON
ENLARGEMENT
PARKING & TRAFFIC MANAGEMENT PLAN PEDESTRIAN PLAN
“make it better”
PETER LEMMON
ENLARGEMENT
“make it better”
STEVEN M. SHANHOLTZER
STORMWATER MANAGEMENT STRATEGIES EXISTING CONDITIONS
“make it better”
ENLARGEMENT
STEVEN M. SHANHOLTZER
STORMWATER MANAGEMENT STRATEGIES PROPOSED CONDITIONS
ENLARGEMENT
“make it better”
STEVEN M. SHANHOLTZER
STORMWATER MANAGEMENT STRATEGIES UNDERGROUND DETENTION
STEVEN M. SHANHOLTZER
FACTS & FIGURES EXISTING CONDITIONS
“make it better”
- Size of Development Area = 11.83 Acres
- New Impervious Area = 1.38 Acres
- Detention Capacity Required = 0.28 Ac-Ft.
MWRD Permit No. 93-143 (Loyola Academy Expansion Plans)
STEVEN M. SHANHOLTZER
FACTS & FIGURES EXISTING CONDITIONS
“make it better”
- Size of Development Area = 5.88 Acres
- New Impervious Area = 2.52 Acres
- Basin No. 1 Detention Capacity Required = 0.92 Ac-Ft.
- Basin No. 2 Detention Capacity Required = 0.20 Ac-Ft.
MWRD Permit No. 09-141 (Loyola Academy Stadium Renovations)
STEVEN M. SHANHOLTZER
FACTS & FIGURES PROPOSED CONDITIONS
“make it better”
- Phase 1 Detention Requirement =
9.35 Ac x 0.26 Ac.-Ft/Ac. = 2.43 Ac.-Ft.
- Phase 1 Required Volume Control =
(280,900 SF x 1.00 IN)/(12 IN/FT) = 0.54 Ac-Ft TOTAL STORAGE (Detention and BMP Storage) = 3.0 Ac-Ft East of Laramie (Loyola Campus) – Phase 1
STEVEN M. SHANHOLTZER
FACTS & FIGURES PROPOSED CONDITIONS
“make it better”
- Phase 2 Detention Requirement =
55.74 Ac x 0.26 Ac.-Ft/Ac. = 1.49 Ac.-Ft.
- Phase 2 Required Volume Control =
174,240 SF x 1.00 IN)/(12 IN/FT) = 0.33 Ac-Ft TOTAL STORAGE (Detention and BMP Storage) = 1.8 Ac-Ft
Note: The proposed underground detention system (Contech CMP) for Phase 1 (East of Laramie) would reside under the proposed tennis courts. The proposed underground storage system (below tennis courts) has been designed to allow for a future expansion. The expanded system would reside under the turf grass recreational area.
East of Laramie (Loyola Campus) – Phase 2
STEVEN M. SHANHOLTZER
FACTS & FIGURES CONCLUSIONS
“make it better”
- Construction of the proposed improvements minimally increase
impervious area
- Both volume control and stormwater detention will be provided onsite
- The total fmow into the downstream storm sewer system (Village of
Wilmette) will be under the net allowable release rate.
- The stormwater design is in compliance with the MWRD Watershed
Management Ordinance.
- The Phase 1 stormwater vault under the tennis courts will increase the
stormwater detention on the main campus by roughly 150%.
- The Ultimate stormwater vault (expanded condition) will increase
existing stormwater detention on the main campus by roughly 250%.
Student Enrollment at Loyola
Condition of Approval Established by Village Ordinance No. 93-0-63 Granting SUP to Loyola Academy (Adopted 5/11/93) “Maximum enrollment of no more than 2,000 students”
- No reporting requirement
- No “Safe Harbor”
STUDENT ENROLLMENT AT LOYOLA
HAL FRANCKE
AVERAGE ENROLLMENT BEGINNING OF SCHOOL YEAR END OF SCHOOL YEAR 1994/95 - 2015/2016 2045 2026 % over Enrollment Cap 2.3% 1.3% PEAK ENROLLMENT BEGINNING OF SCHOOL YEAR END OF SCHOOL YEAR 2015/16 School Year 2113 2097 % over Enrollment Cap 5.7% 4.9%
History of Student Enrollment
HAL FRANCKE
STUDENT ENROLLMENT AT LOYOLA
HAL FRANCKE
- Maximum enrollment not to exceed
2,000 students
- Loyola to report 9/30 enrollment to
Village, as reported to ISBE, by 10/31
- Loyola not to be deemed in violation
- f SUP condition unless cap exceeded
in a given school year by 10% or more Proposed Condition of Approval
STUDENT ENROLLMENT AT LOYOLA
HAL FRANCKE
- Kimley Horn TIS assumed maximum enrollment of 2,200 students
- Conclusions:
- 35 additional inbound + 35 additional outbound trips during each of
A.M. + P.M. peak hours
- Minimal impact on traffjc volumes along Laramie Avenue
- Key is implementation of effective Traffjc Management Plan
Traffjc Considerations
STUDENT ENROLLMENT AT LOYOLA
- FR. MCGRATH
STUDENT ENROLLMENT AT LOYOLA
Requested Zoning Relief
SCOTT FRERES
ZONING MAP & ZONING REQUIREMENTS
SCOTT FRERES
- Amendment to and Expansion of 1993 SUP
approving/authorizing: New Aquatic Center construction Revised enrollment cap condition New Traffjc Management Plan
- Variations to allow:
Tennis court setbacks (to the east and west) Tennis court fence (height and material) One new identity sign on Laramie (size and number) Variation for fence pier (column width and height) Additional light poles (height)
ZONING REQUESTS