Department of Nuclear Regulation Department of Nuclear Regulation Atomic Energy Council, R.O.C. Atomic Energy Council, R.O.C.
The Introduction of The Introduction of Lungmen Lungmen Nuclear Power Plant Nuclear Power Plant
1 1
The Introduction of Lungmen Lungmen The Introduction of Nuclear - - PowerPoint PPT Presentation
The Introduction of Lungmen Lungmen The Introduction of Nuclear Power Plant Nuclear Power Plant Department of Nuclear Regulation Department of Nuclear Regulation Atomic Energy Council, R.O.C. Atomic Energy Council, R.O.C. 1 1 Outline
1 1
2 2
3 3
Lungmen Project proposed 1980 GE ABWR Awarded 1996.6 Construction Permit issued 1999.3 Lungmen Lungmen Project Project Suspended by Suspended by DPP government DPP government 2000.10 Lungmen Project Resumed 2001.2 First Concrete pouring 2006.10 2005.3 Unit 1 RPV Sitting Unit 2 RPV Sitting 2007.7 161kV Energized (only partial electric distribution systems installed)
2008.11 Unit 1 RPV Hydro test Pre-op tests start 2009.7 2010.4 ECCS Pre-op 2010.8 FIV
4 4
Turbine Building Access Control Building Radwaste Building Auxiliary Fuel Building Rx Building Control Building Switchyard
Pump House
5 5
6 6
7 7
8 8
9 9
10 10
RCCV FMCRD Reactor Internal Pump Main Control Room Reactor Pressure Vessel Turbine & Generator ECCS
11 11
BASE MAT
SUPPRESSION POOL ACCESS TUNNEL WET WELL
VACUUM BREAKER * 8
RPV LOWER DRYWELL HORIZ. VENT SRV MSIV
PRIMARY CONTAINMENT BOUNDARY SECOND CONTAINMENT BOUNDARY
CLEAN ZONE CLEAN ZONE
DRYWELL CONNECTING VENT * 10 FUEL POOL D/S POOL PRIMARY CONTAINMENT VESSEL
ACCESS
DRYWELL HEAD
UPPER DRYWELL
12 12
MCC (Main Control Console) Alarm Indication WDP (Wide Display Panels) Fixed Mimic Display Large Variable Display Video Display Unit Hard Switch Panels
SSC( Shift Supervisor Console)
Plant status tiles
Raised Floor Raised Floor
13 13
14 14
15 15
The Lungmen progress issued by Taipower Company
Category
Design (19%) Procurement (15%) Construction (58%) Startup* (8%) Total (100%)
*Numbers under startup represent initial test activities (Post Construction Test, Pre-op test, procedures preparation)
16 16
17 17
18 18
19 19
20 20
21 21
22 22
23 23
24 24
25 25
26 26
27 27
28 28
.
29 29
30 30
31 31
32 32
1st check point
Site selection Preliminary design (PSAR)
Construction, PCT, Pre-OP Start-up testing
FSAR TPC AEC
N O W
2nd check point 3rd check point 4th check point
Review PSAR Issue PSAR SER Issue Construction License Review FSAR Issue FSAR SER Review 75 tasks Issue Fuel loading permit Review Startup testing Report Issue Operation License
33 33
34 34
Construction Tests Pre-Operational Tests Startup Tests
(Initial Test Program)
Construction
Post Construction Test Pre-Op Test Startup Test
Phase Ⅰ Phase Ⅱ Phase Ⅲ Commercial
(Construction / Installation/ Test Procedure ) (Startup Administrative Manual, SAM) (In-service Procedure)
JTG
TPC Nuclear Project Quality Assurance Program
The Taipower Nuclear Operation Quality Assurance Program
Construction Office LMNPP 35 35
36 36
37 37
38 38
39 39
40 40