A present at ion for: The Cleveland City Planning Commission December 19, 2008 Presented by: The Ohio Department of Transportation and The City of Cleveland Lakefront West Purpose: Convert US-6 from high speed limited access freeway to a


slide-1
SLIDE 1

A present at ion for:

The Cleveland City Planning Commission

December 19, 2008 Presented by: The Ohio Department of Transportation and The City of Cleveland

slide-2
SLIDE 2

Lakefront West

Purpose: Convert US-6 from high speed limited access freeway to a boulevard in accordance with Connecting Cleveland: The Waterfront District Plan Current Cost Estimate: TRAC Budget PE = $1.6M TRAC Budget DD = $3.2M TRAC Budget RW = $5.0M TRAC Budget CO = $40M TRAC Budget TOTAL = $49.8M Status: Project in Preliminary Engineering Phase

slide-3
SLIDE 3

Lakefront West

Schedule: Stakeholder Committee Meeting – December 2, 2008 Public Meeting – December 11, 2008 Planning Commission Meeting – December 19, 2008 Preliminary Engineering/Environmental Document – 2009 Detail Design – 2010/2011* Right-of-Way Acquisition – 2011/2012** Construction – 2012/2013/2014* * New Railroad Bridge Carrying Norfolk Southern Tracks over Extension of West 73rd Street Controls Overall Schedule ** 24 Months Required if Business Relocation Involved. *** Once Environmental Document is Approved (2009), then

  • pportunities exist to individually advance components.
slide-4
SLIDE 4

Potential Early Deployment Projects

Group 1 – West 76th Street Pedestrian & Bicycle Access

  • Schedule:

Detail Design – 2009/2010 Construction – 2010/2011 Group 2 – Multi-Purpose Trail from West 25th Street to West 65th Street; West 49th Street Connection; West Blvd./Lake Ave. Connection

  • Schedule:

Detail Design – 2009/2010 Construction – 2011/2012 Potential Safety Project Group 3 – West 28th Street Pedestrian Improvements. Close West 28th Street Entrance Ramp to SR 2/Main Avenue Bridge Eastbound

  • Schedule:

TBD

slide-5
SLIDE 5

Lakefront front West – Phase I

  • Safety and Operational Improvements to the West Blvd. and Lake Ave.

Intersection, including retaining and reconfiguring the existing ramps.

slide-6
SLIDE 6

Lakefront front West – Phase I

  • Rehabilitate the West 76th St. Underpass, including improving pedestrian and

bicycle access to Edgewater Park Beach.

slide-7
SLIDE 7

Lakefront front West – Phase I

  • Construct a NEW Underpass with Norfolk Southern Railroad and extend

West 73rd St. North to the West Shoreway and Edgewater Park.

slide-8
SLIDE 8

Lakefront front West – Phase I

  • Construct a NEW Underpass with Norfolk Southern Railroad and extend

West 73rd St. North to the West Shoreway and Edgewater Park.

slide-9
SLIDE 9

Lakefront front West – Phase I or II

  • Construct a NEW Connection (right-in/right-out) at Division Ave.
  • Construct a NEW Connection (right-in/right-out) at West 54th St.
slide-10
SLIDE 10

Lakefront front West – Phase I

  • Reconfigure West 49th St. Bridge to accommodate the Multi-Purpose Trail.
  • Safety and Operational Improvements to West 45th St. and West 49th St.
slide-11
SLIDE 11

Lakefront front West – Phase II

  • CLOSE Entrance Ramp from West 28th St. to SR-2 EB. Use entrance at W. 45th St.
  • Relocate the US-6 Entrance and Exit Ramps from West 25th St. to West 28th St.
  • Reconfigure the Intersection of West 25th St./Main Ave./Washington Ave.
slide-12
SLIDE 12

Lakefront front West – Phase II

slide-13
SLIDE 13

Lakefront front West – Phase II

slide-14
SLIDE 14

Lakefront front West – Phase II

  • CLOSE the Entrance Ramp from West 28th St. to SR-2 EB.
  • Relocate the US-6 Entrance and Exit Ramps from W. 25th St. to W. 28th St.
slide-15
SLIDE 15

Lakefront front West – Phase II

  • CLOSE the Entrance Ramp from West 28th St. to SR-2 EB.
  • Relocate the US-6 Entrance and Exit Ramps from W. 25th St. to W. 28th St.
slide-16
SLIDE 16

Lakefront front West – Phase I and II

  • Construct NEW Multi-Purpose Trail from West 25th St. to West 65th St.,

Connecting the bicycle lanes on the Veteran’s Memorial Bridge with the existing Multi-Purpose Trails within Edgewater Park.

  • Construct NEW Multi-Purpose Trails along West Shoreway from West Blvd.

to West 65th St.

slide-17
SLIDE 17

Lakefront front West – Phase II

  • Reconstruct US-6 pavement, including Reconfiguring the Typical Section.
slide-18
SLIDE 18

Lakefront front West – Phase II

  • Reconstruct US-6 pavement, including Reconfiguring the Typical Section.
slide-19
SLIDE 19

Lakefront West

Visit www.innerbelt.org then select the “Lakefront West” logo.

  • Project Update December 2008.
  • Comment Form.
  • Today’s presentation and graphics.

Thank you.

slide-20
SLIDE 20

Lakefront front West – Plan