A present at ion for:
The Cleveland City Planning Commission
December 19, 2008 Presented by: The Ohio Department of Transportation and The City of Cleveland
The Cleveland City Planning Commission December 19, 2008 Presented - - PowerPoint PPT Presentation
A present at ion for: The Cleveland City Planning Commission December 19, 2008 Presented by: The Ohio Department of Transportation and The City of Cleveland Lakefront West Purpose: Convert US-6 from high speed limited access freeway to a
December 19, 2008 Presented by: The Ohio Department of Transportation and The City of Cleveland
Purpose: Convert US-6 from high speed limited access freeway to a boulevard in accordance with Connecting Cleveland: The Waterfront District Plan Current Cost Estimate: TRAC Budget PE = $1.6M TRAC Budget DD = $3.2M TRAC Budget RW = $5.0M TRAC Budget CO = $40M TRAC Budget TOTAL = $49.8M Status: Project in Preliminary Engineering Phase
Schedule: Stakeholder Committee Meeting – December 2, 2008 Public Meeting – December 11, 2008 Planning Commission Meeting – December 19, 2008 Preliminary Engineering/Environmental Document – 2009 Detail Design – 2010/2011* Right-of-Way Acquisition – 2011/2012** Construction – 2012/2013/2014* * New Railroad Bridge Carrying Norfolk Southern Tracks over Extension of West 73rd Street Controls Overall Schedule ** 24 Months Required if Business Relocation Involved. *** Once Environmental Document is Approved (2009), then
Group 1 – West 76th Street Pedestrian & Bicycle Access
Detail Design – 2009/2010 Construction – 2010/2011 Group 2 – Multi-Purpose Trail from West 25th Street to West 65th Street; West 49th Street Connection; West Blvd./Lake Ave. Connection
Detail Design – 2009/2010 Construction – 2011/2012 Potential Safety Project Group 3 – West 28th Street Pedestrian Improvements. Close West 28th Street Entrance Ramp to SR 2/Main Avenue Bridge Eastbound
TBD
Lakefront front West – Phase I
Intersection, including retaining and reconfiguring the existing ramps.
Lakefront front West – Phase I
bicycle access to Edgewater Park Beach.
Lakefront front West – Phase I
West 73rd St. North to the West Shoreway and Edgewater Park.
Lakefront front West – Phase I
West 73rd St. North to the West Shoreway and Edgewater Park.
Lakefront front West – Phase I or II
Lakefront front West – Phase I
Lakefront front West – Phase II
Lakefront front West – Phase II
Lakefront front West – Phase II
Lakefront front West – Phase II
Lakefront front West – Phase II
Lakefront front West – Phase I and II
Connecting the bicycle lanes on the Veteran’s Memorial Bridge with the existing Multi-Purpose Trails within Edgewater Park.
to West 65th St.
Lakefront front West – Phase II
Lakefront front West – Phase II
Lakefront front West – Plan