the andover complex a new nickel district
play

The Andover Complex: a new nickel district ASX: AZS 121 Mining - PowerPoint PPT Presentation

AZURE MINERALS IS BACK IN WA The Andover Complex: a new nickel district ASX: AZS 121 Mining Investment Tony Rovira Investor Presentation Managing Director @AzureMinerals 7-9 October 2020 Azure Minerals Ltd www.azureminerals.com.au 1


  1. AZURE MINERALS IS BACK IN WA The Andover Complex: a new nickel district ASX: AZS 121 Mining Investment Tony Rovira Investor Presentation Managing Director @AzureMinerals 7-9 October 2020 Azure Minerals Ltd www.azureminerals.com.au 1

  2. Corporate snapshot CORPORATE STRUCTURE 22 September 2020 MAJOR SHAREHOLDERS Share Price A$0.20 Creasy Group 19.1% Shares 242.2 million Deutsche Balaton 18.0% Options 5.85 million Teck Resources Ltd 11.4% Directors & Management 1.5% Market Cap A$48.4 million Cash A$4.0 million Top 20 60.0% Debt A$2.0 million $0.30 (Convertible Note: conversion @ A$0.145) $0.25 $0.20 $0.15 $0.10 $0.05 $0.00 Sep-19 Dec-19 Mar-20 Jun-20 Sep-20 2 Last Price

  3. Refocus attention to Western Australia Exploration & mining in WA is open for business with supportive commodity prices and thriving capital markets Diversifying across commodities and jurisdictions is reducing risk & increasing near- term upside Mexican projects remain a key component for Azure but activities restricted due to COVID-19 – drilling expected in November 2020 3

  4. Quality nickel & gold projects in the Pilbara 4 PROJECTS ACQUIRED FROM MARK CREASY Andover Nickel-Copper Project: 60% Azure / 40% Creasy Turner River, Meentheena & Coongan Gold Projects: 70% Azure / 30% Creasy CREASY NOW 19.1% SHAREHOLDER IN AZS 4

  5. The Pilbara – a Tier 1 exploration & mining region Turner River: Hemi analogues? Andover: 70km 2 New nickel-copper discovery by Creasy Andover: new nickel discovery in layered mafic-ultramafic intrusion Turner River: 450km 2 Adjacent to De Grey’s Mallina Gold Project & Hemi gold discovery Coongan: 223km 2 Hemi gold discovery Adjacent to Novo’s Beatons Creek Gold Project Meenthena: 141km 2 Explored by Creasy for epithermal gold since 1994 5 5

  6. Andover nickel-copper project First class infrastructure • Commercial flights • Highways, roads & rail  2.5 hours from Perth airport • Power & scheme water • Cell phone coverage Andover Project 70km 2 • Accommodation & services • Good access throughout 6

  7. New & unreported nickel discoveries by Mark Creasy Exploration by Creasy in 2008-2020: • Mapping & sampling • VTEM & FLTEM surveys • RC drilling – 7 holes in April 2018 • DHEM Outcropping nickel-copper gossans Strong bedrock-hosted VTEM conductors Target 2 4 coincident VTEM / FLTEM targets drill tested 3 drill holes intersected nickel & copper sulphides in two separate locations Target 1 Multiple targets remain untested 7

  8. Drilled by Creasy Group in 2018* – with nickel hits ADRC002: 7m @ 2.62% Ni & 0.65% Cu from 43m; in 26m @ 1.03% Ni & 0.46% Cu Semi-massive and disseminated sulphides ADRC001: 4m @ 1.10% Ni & 0.80% Cu from 6m Gossan ADRC001: 2m @ 1.77% Ni & 0.53% Cu from 62m Target 2 Sulphide stringers ADRC006: 2m @ 2.10% Ni & 0.44% Cu from 15m Semi-massive and disseminated sulphides Target 1 8 * Refer ASX announcement 17 July 2020

  9. Exploration underway at Andover PHASE 1 EXPLORATION PROGRAM August to December 2020 Geophysical (FLTEM) surveying Target 1 • 10+ locations completed • Multiple targets identified Diamond drilling • Highest priorities: Targets 1 & 2 • 12 holes / ~3,000m • Starting 1 st October 2020 Follow-up down-hole EM surveys

  10. Target 1: high priority for massive nickel sulphides Semi-massive, blebby and disseminated nickel & copper sulphide mineralisation High-tenor nickel sulphide mineralisation: maximum values of 4.66% Ni & 3.96% Ni In-hole DHEM conductors correlate with semi-massive sulphides Off-hole conductor Strong off-hole DHEM conductor indicates 4,000-5,200 Siemens potential for extensive sulphide mineralisation down-dip & along-strike Initial 3 drill holes planned to test down-dip mineralised extensions 10

  11. • Good access into and throughout the project area • Good outcrop including mineralised gossans • Drive-up drill targets Copper oxides in Drill hole collar nickel-copper gossan ADRC001 11

  12. Priorities & near-term upside catalysts ANDOVER: Continue exploration of new nickel-copper sulphide discoveries Surface EM surveying completed • Initial 12 hole, 3,000m diamond drilling program underway • First assay results expected in late-October • Additional drilling planned for 2021 • ALACRÁN (MEXICO): Expanding gold and silver resources Diamond drilling of gold & silver targets in November •

  13. Mexico: Quality projects in Tier 1 mining district Alacrán: silver & gold M & I resource 1 : 32Moz Ag & 150,000oz Au Includes high-grade Measured Resource at surface of: 15.5 million ounces Silver in 1.8Mt @ 275g/t Ag • Diamond drilling to restart in November Oposura: zinc, lead & silver Indicated resource 2 : 3.1Mt @ 5.0% Zn 2.7% Pb 18g/t Ag = 153,000t Zinc 84,000t Lead 1.8Moz Silver 13 1. Refer ASX: 1 December 2016 & 21 December 2016 2. Refer ASX: 8 May 2019

  14. Thank you For enquiries, please contact: Tony Rovira, Managing Director admin@azureminerals.com.au ASX: AZS @AzureMinerals www.azureminerals.com.au 14

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend