Terramin General Update Matt Daniel Environment and Community S uperintendent Angas Zinc Mine 1 Angas Zinc Mine Ongoing management of site weed control and revegetation During the quarter observed a family of White-browed


  1. Terramin General Update Matt Daniel – Environment and Community S uperintendent Angas Zinc Mine 1

  2. Angas Zinc Mine  Ongoing management of site – weed control and revegetation  During the quarter observed a family of White-browed Babblers, first seen on site in 7 years  Picture shows a Little Eagle, taken on AZM (M.Ankor)  Hydrostor - progress  Compressed Air Energy S torage  Presentation tonight

  3. Terramin Update  Appointed new CEO – Richard Taylor  Bachelors of Economics and Law – University of Newcastle  Master of Laws –ANU  Master of Business Administration – Cambridge  Member of Australian Institute of Company Directors  Panaust Asia  Managing Director, copper gold mine, Laos  MMG (Oxiana)  Asia and Country Manager  S epon copper/ gold mine, Laos  Department of Foreign Affairs and Trade  World Bank – S ustainable Energy, Oil, Gas and Mining

  4. Terramin - Proj ects  Bird in Hand / Angas Processing Facility  Beginning t o receive feedback from DEM on BIH ML Proposal  Draft AZM MPL being reviewed externally prior to the draft being lodged with DEM  S till waiting on DEM approval to begin Managed Aquifer Recharge drilling at BIH  Tala Hamza  Mining lease application being reviewed by government agencies  Completion of mining lease application ready to be submitted subj ect to j oint resolution of the Tala Hamza partners  Continued engagement with the Algerian regulator and government.

  5. Quarterly Environment Report Matt Daniel – Environment and Communit y S uperint endent 5

  6. Activities over Q1  Annual Compliance report submit t ed in March  Continued drafting of MPL for Angas Processing Facility  Updated stormwater design for MPL –AECOM  S light cat chment change

  7. Angas Zinc Mine – Quarterly Environment Report No non-compliances against lease Conditions for Quarter 1, 2018  Correction to QER  No non-compliance against PM10 Outcome Measurable Criteria  Review: “ PM10 dust levels collected from the HiVol PM10 sampler located at the visitors viewing area (Figure 44 - same location as the HiVol sampler), will be sampled over a 24hour period every six days as per AS , 3580.9.3:2003 standards. Data will demonstrate compliance with NEPM 1998 criteria of <50 micrograms/ m3 per 24 hour period with <5 days exceedances per year .”  Terramin still conducted investigation as to why

  8. Angas Zinc Mine – Quarterly Environment Report 17 th March 2018 - Saturday PM10 measured 55ug/ m 3 over 24 hours   Unusual - Investigation showed wind direction towards operational area all day, not away from operational area  No activities being undertaken at AZM  No southerlys, south-westerlys, or south-easterlys  65km/ hr onsite 0-5 5-10 10-15 15-20 20-25 25-30 30-35 35-40 40-45 >50 N 12.00% 10.00% NW NE 8.00% 6.00% 4.00% 2.00% W E 0.00%

  9. Tailings S torage Facility  urface area remains at approximately <5000m 2 S  Water level is approximately 67.68m RL (compliance is 74.2m RL)  eepage drains remain lowest they’ ve been in last 2 years – approx. ≈ 1L/ min S  Cadmium spike in TS F B and D reviewed by ATC Williams and unrelated to TS F TS F Drain Flow Rates 3.5 3.0 Flow Rate (Litres/ minute) 2.5 2.0 1.5 1.0 0.5 0.0 Jan-2016 Mar-2016 May-2016 Jul-2016 ep-2016 Nov-2016 Jan-2017 Mar-2017 May-2017 Jul-2017 ep-2017 Nov-2017 Jan-2018 S S Drain 1 Drain 2 Drain 3 Drain 4 Drain 5 Tot al Flow (L/ min)

  10. Closure Plan Fact S heets  Up in Visitor’s Viewing Platform at AZM  Copies available for Community Access areas (actions outstanding from last meeting)  See Matt after meeting to obtain a set

  11. Questions?

  12. Hydrostor A-CAES System Basics

  13. Terramin Zinc Mine A-CAES System

  14. Benefits for Australia • Repurpose decommissioned thermal plants and defer Fossil Plant remediation costs • Re-use of existing interconnection and infrastructure Replacement • Synchronous generation for reliability, without emissions • Non-wires alternatives to defer grid network investment Transmission • Alleviates grid congestion during peak periods Deferral • Locatable reliable power for critical areas and infrastructure • Provide dispatchable, base loaded renewables Renewable • Optimize solar/wind project economics through time-shifting Integration • Reduce curtailment • Ability to eliminate fuel costs & logistics (off-grid) Mines / Large • Improve reliability and reduce electricity grid charges (on-grid) Industrial • Re-use legacy mining infrastructure 14

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.