FALL 2012 SECTION C SITE PH10: HWY 726:02, EUREKA RIVER
1. OBSERVATIONS 1.1 Field Program and Instrumentation Status One slope inclinometer (SI08-4) and one pneumatic piezometer (PN08-4) were read at the Hwy 726:02 Eureka River site on October 2, 2012 by Mr. Chad Gray, C.E.T. and
- Ms. Jessica Pryer, T.T., of Thurber Engineering Ltd. (Thurber).
The Sl was read using a RST Digitallndinometer probe with
2 f t
wheelbase and a RST Pocket P C
- readout. lndinometer reading depths were defined as per cable markings with respect to the
top of the inclinometer casing. The pneumatic piezometer was read using a RST C108 pneumatic piezometer reader. 2. INTERPRETATION 2 . 1 General Sl plots for A and B directions are presented in Section D and are summarized below. Wlere movement has been recorded the r e s u ltant plot (X direction) and rate of movement have also been provided.