Deubrook Elementary School Toronto, Deuel County, South Dakota
Tatanka Ridge Wind Project
South Dakota Public Utilities Commission Public Input Hearing
August 7th, 2019
Tatanka Ridge Wind Project South Dakota Public Utilities Commission - - PowerPoint PPT Presentation
Deubrook Elementary School Toronto, Deuel County, South Dakota AVANGRID RENEWABLES August 7th, 2019 Tatanka Ridge Wind Project South Dakota Public Utilities Commission Public Input Hearing www.avangridrenewables.com 1 Introduction
www.avangridrenewables.com 1
August 7th, 2019
www.avangridrenewables.com 2
Tatanka Ridge Wind Project
AVANGRID RENEWABLES
www.avangridrenewables.com 3
Tatanka Ridge Wind Project
Permitting
AVANGRID RENEWABLES
www.avangridrenewables.com 4
One of the largest wind project
6 GWs owned and contracted 636 MW of CCGT & peaking capacity
Tatanka Ridge is a subsidiary of AVANGRID, NYSE: AGR More than $32 billion of U.S. assets
725+ employees at the end of 2018, compared with 12 in 1999
Wind Power Solar & Biomass
6,000+ MW
536 MW CCGT 100 MW peaking 116 MW Solar 55 MW Biomass
Rev.April 2019
Tatanka Ridge Wind Project AVANGRID
RENEWABLES
avangridrenewables.com
Tatanka Ridge Wind Project 4
Wind generation Thermal generation Biomass generation Solar generation
Mountain View III 22.4 MW Pleasant Valley 144 MW PPA Twin Buttes 75 MW Colorado Green 162 MW Elk River 150 MW 1 - Klondike IIIa 76.5 MW 2 - Hay Canyon 100.8 MW 3 – Klondike I 24 MW 4 - Klondike III 223.6 MW 5 - Star Point 98.7 MW 6 - Klondike II 75 MW 7 - Big Horn I 199.5 MW 8 - Big Horn II 50 MW 9 - Juniper Canyon 151.2 MW 10 - Pebble Springs 98.7 MW 11 - Leaning Juniper II 201.3 MW Peñascal II 201.6 MW Barton Chapel 120 MW Locust Ridge I 26 MW Casselman 34.5 MW Rugby 149.1 MW Farmers City 146 MW Providence Heights 72 MW Peñascal I 201.6 MW Tacoma 55 MW PPA WIND PROJECTS
1 4 3 6 8 5 7 2 9 10 11 12
1 - Buffalo Ridge I 50.4 MW 2 - Buffalo Ridge II 210 MW 3 - MinnDakota 150 MW 4 - Moraine I 51 MW 5 - Moraine II 49.5 MW 6 - Elm Creek I 99 MW 7 - Elm Creek II 148.8 MW 8 - Trimont 101 MW 9 - Flying Cloud 43.5 MW 10 - Winnebago 20 MW 11 - Top of Iowa II 80 MW 12 - Barton 160 MW 13 - New Harvest 100 MW Maple Ridge II 45.4 MW owned (91 MW JV project) Maple Ridge I 115.5 MW owned (231 MW JV project) Hardscrabble 74 MW
1 2 3 4 8 5 6 10 9 7 11
Dry Lake I 63 MW Dry Lake II 65.1 MW South Chestnut 46 MW Blue Creek 304 MW Streator Cayuga Ridge 300 MW
13
Lempster 24 MW Hoosac 28.5 MW Groton 48 MW Shiloh 150 MW Manzana 189 MW High Winds 162 MW PPA Baffin 202 MW Dillon 45 MW Amazon Wind Farm NC 208 MW Locust Ridge II 102 MW South Texas Coast Complex Klamath Energy Cogeneration 536 MW Peakers 100 MW Copper Crossing 20 MW El Cabo 298 MW Twin Buttes II 75 MW Deerfield 30 MW Tule 131.1 MW San Luis 30 MW Gala 56 MW Wy’East 10 MW
AVANGRID
.,.
RENEWABLES
11111
www.avangridrenewables.com 6
Tatanka Ridge Wind Project
County
l l l
www.avangridrenewables.com 7 Tatanka Ridge Wind Project
AVANGRID RENEWABLES
111 1"1'BR00KIN ,t862ft He n:lrtckS Bru::e B,oo k,ng< I
I
MinnDakota I Avangrid Renewables CJ Buffalo Ridg~ Boundary CJ Tatanka Ridge Boundary Facilities
.---, f-- - ---,--------, L.....J Buffalo Ridge II Boundary =
Interstate
OUTH AKCTA
CJ
Coyote Ridge Boundary
CJ
MinnDakota Boundary
km 10 Data Source: World Topo Map Coordinate System: UTM, NAD83. zn 14N Map produced on 0312612019 by A. L. Dahl!!'
"
I\
www.avangridrenewables.com 8
Project Developer
Avangrid Renewables, LLC Project Details
Tatanka Ridge Wind Project AVANGRID
RENEWABLES
www.avangridrenewables.com 9
Tatanka Ridge Wind Project
In-service date
Off-take
Agreements for 100% of the
Land agreements
Participating landowners
AVANGRID RENEWABLES
www.avangridrenewables.com 10
Located north of Toronto in Blom, Brandt, Grange, Hidewood, and Scandinavia Townships
Tatanka Ridge Wind Project AVANGRID
RENEWABLES
www.avangridrenewables.com 11
Met ower Locooion Laydovm
1reaM llld l'I s.tib ttr I n
(rane ath Und rgro1,md
Ol.·erhe.adl/Unci\e.grou d
Fin,al A!igm1en~ To
Dete.r ·ned
CSJI Project Boundar:,,
E:c" ·ng l..!lnderg ound Pip,el"ne
c::iJ
Mumcipaliily
11 ·
ng 0-.,erh~d Tr~n~ ]~on Line I
r~--i
l __
! Ci'l'il Township Ba ,
;:: '/
!
County Botmdar)'
www.avangridrenewables.com 12
Tatanka Ridge Wind Project
townships
= DEUEL
~
FARMERS UNION
Uliiiiiiiiiili OIL co. ~1.,L=I~==-=
www.avangridrenewables.com 13
Land Agreements
Meteorological Data
Interconnection Agreement
Constraints Analysis
Field Studies
Tatanka Ridge Wind Project AVANGRID
RENEWABLES
www.avangridrenewables.com 14
Tatanka Ridge Wind Project AVANGRID
RENEWABLES
www.avangridrenewables.com 15
Landowner Input To Date
and coordination Permitting
Power Purchase Agreements
Tatanka Ridge Wind Project AVANGRID
RENEWABLES
www.avangridrenewables.com 16
activities (roads/tile)
Tatanka Ridge Wind Project AVANGRID
RENEWABLES
www.avangridrenewables.com 17
At the end of commercial operation, project owner is responsible for decommissioning: Turbine removal
Remove below ground equipment to 42 inches per county requirements Remove above ground facilities Access roads
Financial assurance
Tatanka Ridge Wind Project AVANGRID
RENEWABLES
www.avangridrenewables.com 18
Tatanka Ridge Wind Project
AVANGRID RENEWABLES
www.avangridrenewables.com 19 Tatanka Ridge Wind Project
AVANGRID RENEWABLES