Status of North Carolina Bridges Report to the 21st Century Transportation Committee February, 2008 Lacy D. Love, PE Director of Asset Management NCDOT Status of NC Bridges Status of NC Bridges Introduction Introduction Definitions
Status of NC Bridges Status of NC Bridges
Introduction Introduction
Definitions
Definitions
Bridges
Bridges vs
- vs. Structures
. Structures
Inspection Program Overview
Inspection Program Overview
Bridge Condition
Bridge Condition
Performance Goals
Performance Goals
Management Approach
Management Approach
Challenges
Challenges
Bridges Bridges vs
- vs. Structures
. Structures
Bridges Pipes Culverts Floating barge w/Bridge
Structurally Deficient Bridge Structurally Deficient Bridge
Haywood County #79 built in 1891 Haywood County #79 built in 1891
Structurally Deficient ~ 2200 Structurally Deficient ~ 2200
Functionally Obsolete Bridge Functionally Obsolete Bridge
Functionally Obsolete ~ 3000 Functionally Obsolete due to roadway clearance
Sufficiency Rating Sufficiency Rating
Established by FHWA
Established by FHWA
Compares existing bridge to a new bridge designed to current
Compares existing bridge to a new bridge designed to current engineering standards engineering standards
Measure of Bridge
Measure of Bridge’ ’s overall condition (scale 0 to 100) s overall condition (scale 0 to 100)
Used to determine eligibility for Federal Aid Bridge funds
Used to determine eligibility for Federal Aid Bridge funds
Must be < 50 for Replacement
Must be < 50 for Replacement
Must be < 80 for Rehabilitation
Must be < 80 for Rehabilitation
Does not imply the bridge is unsafe
Does not imply the bridge is unsafe
Formula based on
Formula based on
Structural Condition of Bridge (55%)
Structural Condition of Bridge (55%)
Serviceability and Obsolescence (30%)
Serviceability and Obsolescence (30%)
Essentiality to public use (15%)
Essentiality to public use (15%)
- Every Bridge inspected every 2 years
- Detail inspection by Inspection teams
- Above water teams - 18
- Underwater teams - 4
- Special evaluation teams - 4
- Supplemented by private inspectors
- Each element rated based on condition (1 to 9)
- Teams document maintenance needs for each element for
each bridge
- Maintenance needs entered into Bridge Management
System
Inspection Program Inspection Program
Bridge Analysis Bridge Analysis
Status of NCDOT Bridges Status of NCDOT Bridges
17,300 Total Structures including concrete
17,300 Total Structures including concrete culverts and metal structures (pipes) that have a culverts and metal structures (pipes) that have a span length of 20 span length of 20’ ’ or more; state
- r more; state-
- owned and
- wned and
maintained. maintained.
~ 12,600 state
~ 12,600 state-
- owned and maintained Bridges
- wned and maintained Bridges
~ 2,000 bridges with SR < 50
~ 2,000 bridges with SR < 50
~ 700 bridges are programmed in TIP
~ 700 bridges are programmed in TIP
~ 4,000 with timber components
~ 4,000 with timber components
~ 35% increase in deck area in the last 20 years
~ 35% increase in deck area in the last 20 years
Percent of Deficient NC Bridge Percent of Deficient NC Bridge
(includes culverts and all bridge owners) (includes culverts and all bridge owners)
20 22 24 26 28 30 32 34 36 38 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 Year Percent NC Bridges National Bridges
NCDOT NCDOT vs
- vs. Southeast States
. Southeast States
(state (state DOTs DOTs’ ’ including culverts) including culverts)
5 10 15 20 25 30 Percent Deficient AL FL GA KY LA MS NC SC TN TX VA
500 1000 1500 2000 2500 3000 3500 <1930 1930 1940 1950 1960 1970 1980 1990 2000
# Bridges # Deficient Bridges
Age of NCDOT Bridges Age of NCDOT Bridges
(not including culverts) (not including culverts)
Performance & Accountability Performance & Accountability
DOT is currently implementing a new
DOT is currently implementing a new performance measures program which has as a performance measures program which has as a goal to achieve a targeted level of service . goal to achieve a targeted level of service .
A Bridge Technical Team has been established to
A Bridge Technical Team has been established to draft the performance goals which will be draft the performance goals which will be implemented in the new program. implemented in the new program.
Performance Measure Performance Measure % Structurally Deficient % Structurally Deficient
SYSTEM TARGET CURRENT GAP SW TIER 1 % 9.9 % 8.9 %
- REG. TIER
5 % 15.6 % 10.6 %
- SUB. TIER
15 % 20 % 5 % ALL TIERS 10 % 17.4 % 7.4 %
Major Bridge Components Major Bridge Components
Condition Rating Distribution Condition Rating Distribution
500 1000 1500 2000 2500 3000 3500 4000 4500 # Bridges 9 8 7 6 5 4 3 2 1 Deck Superstructure Substructure
Goal: 6 CR CR
Performance Standards Performance Standards -
- Example
Example
Element: Bridge Maintenance and Preservation Asset: Deck Activities: Deck Maintenance Condition Indicator: Condition Rating of less than or equal to 6. Performance Measure: Condition Rating by Square Feet of Deck Statewide Regional Subregional Division County Performance Target B B C NA NA Assessment Method BIR BIR BIR BIR BIR LOS Description A B
Functional Work Group Worksheet
LOS Category F 15% or less of condition ratings below 6. Between 15.1% and 20% of condition ratings below 6. Between 20.1% and 25% of condition ratings below 6. Between 25.1% and 30% of condition ratings below 6. 30% or more of condition ratings below 6. C D
Performance Standards Performance Standards
LOS FOR DECKS
0.00% 10.00% 20.00% 30.00% 40.00% 50.00% 60.00% 01 02 03 04 05 06 07 08 09 10 11 12 13 14
DIVISIONS % SF < 6
SF DECK STATEWIDE TIER < 6 SF DECK REGIONAL TIER <6 SF DECK SUBREGIONAL TIER <6
LOS F LOS D LOS C LOS B LOS A
Asset Management Approach Asset Management Approach
Policy Driven
Policy Driven -
- Decisions based
Decisions based
- n well defined policy
- n well defined policy
Performance Based
Performance Based -
- Policy
Policy decisions drive the outcomes decisions drive the outcomes
Analytical Analysis
Analytical Analysis -
- Resource
Resource allocation based on modern allocation based on modern investment analysis and best value investment analysis and best value concepts concepts Allows better communication with stakeholders, legislature and p Allows better communication with stakeholders, legislature and public ublic Better able to allocate resources to most needed work Better able to allocate resources to most needed work
Decisions based on Quality Information
Decisions based on Quality Information -
- Investment decision based
Investment decision based
- n accurate and timely data
- n accurate and timely data
Monitoring for Accountability
Monitoring for Accountability -
- Performance results are monitored for
Performance results are monitored for accountability and efficiency improvement accountability and efficiency improvement
Mix of Fixes Mix of Fixes
Mix of Fixes
Mix of Fixes -
- Keep good bridges good
Keep good bridges good
Maintenance
Maintenance
Routine & Corrective
Routine & Corrective
Preservation
Preservation
Extend Service Life
Extend Service Life
Rehabilitation
Rehabilitation
Restore to new like condition
Restore to new like condition
Replacement
Replacement
Mix of Fixes Mix of Fixes
Current Funding of NC Bridges Current Funding of NC Bridges
Statewide bridge maintenance budget for FY 07
Statewide bridge maintenance budget for FY 07-
- 08
08 is $65 M is $65 M
Beginning Preservation Program ( $15M)
Beginning Preservation Program ( $15M)
Federal Funds
Federal Funds
System Preservation Maintenance Funds
System Preservation Maintenance Funds
Overweight truck fees
Overweight truck fees
NCDOT replaces ~ 120 bridges per year at an
NCDOT replaces ~ 120 bridges per year at an average expenditure of $200 M/yr. average expenditure of $200 M/yr.
Current maintenance needs as documented by the
Current maintenance needs as documented by the inspectors are ~ $350 M inspectors are ~ $350 M
Challenges Challenges
Aging Bridges
Aging Bridges
Predictive modeling tool estimates # Deficient
Predictive modeling tool estimates # Deficient bridges to grow to ~ 7,000 by 2020 bridges to grow to ~ 7,000 by 2020
Balance between bridge replacement projects and
Balance between bridge replacement projects and environmental stewardship environmental stewardship
Limited Replacement Funds
Limited Replacement Funds
Competition for Maintenance Dollars with other