Start-up Time, Run-up Time, and R9 Analysis for ENERGY STAR Lamps - - PowerPoint PPT Presentation

start up time run up time and r9 analysis for energy star
SMART_READER_LITE
LIVE PREVIEW

Start-up Time, Run-up Time, and R9 Analysis for ENERGY STAR Lamps - - PowerPoint PPT Presentation

Start-up Time, Run-up Time, and R9 Analysis for ENERGY STAR Lamps V2.0 Draft 1 Section 11.4: Start Time Start up Time for Lamps meeting V1.1 Efficacy Requirements by Lamp Category 5,147 1,873 2,764 510 100% 4,963 1,834 2,663 466 1,710 90%


slide-1
SLIDE 1

Start-up Time, Run-up Time, and R9 Analysis for ENERGY STAR Lamps V2.0 Draft 1

slide-2
SLIDE 2

Percent of Products Meeting Level

Section 11.4: Start Time

Start‐up Time for Lamps meeting V1.1 Efficacy Requirements – by Lamp Category

5,147 1,873 2,764 510 100% 90% 80% 70% 60% 50% 40% 30% 20% 10% 0% 51% 85% 96% 73% 91% 97% 99% 99% 36% 82% 95% 99% 52% 84% 91% 100% 1,371 1,017 268 4,430 1,710 2,293 427 4,963 1,834 2,663 466 2,656 100 250 500 750 Milliseconds All Omnidirectional Directional Decorative

  • Data pulled from QPL on 3/5/15
  • V1.1: Start time must be ≥1000 milliseconds of application of electrical power
  • Proposed V2.0: Start time must be ≥500 milliseconds of application of electrical power
slide-3
SLIDE 3

Section 11.4: Start Time

Start‐up Time for Lamps meeting V2.0 Proposed Efficacy

2,428 630 1,574 224 100% 90% 80% 70% 60% 50% 40% 30% 20% 10% 0% 100 750 37% 81% 95% 99% 100% 99% 100% 47% 88% 99% 33% 79% 95% 39% 75% 86% 250 500 Milliseconds

Requirements – by Lamp Category

903 297 519 87 1,975 553 1,254 168 2,324 623 1,507 194 All Omnidirectional Directional Decorative

  • V1.1: Start time must be ≥1000 milliseconds of application of electrical power
  • Proposed V2.0: Start time must be ≥500 milliseconds of application of electrical power.

– 95% of lamps that meet the proposed efficacy levels have a start time of 500 milliseconds or less.

Percent of Products Meeting Level

slide-4
SLIDE 4

Section 11.4: Start Time

51% 85% 96% 99% 95% 97% 97% 99% 35% 81% 95% 99% 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% 100 250 500 750 Percent of Products Meeting Level

Start‐up Time for Lamps meeting V1.1 Efficacy Requirements ‐ by Technology

2,656 1,304 1,352 4,430 1,335 3,095 4,963 1,343 3,620 5,147 1,364 3,783 Milliseconds All CFL LED

  • V1.1: Start time must be ≥1000 milliseconds of application of electrical power
  • Proposed V2.0: Start time must be ≥500 milliseconds of application of electrical power
slide-5
SLIDE 5

Section 11.4: Start Time

37% 81% 95% 99% 92% 93% 93% 99% 34% 80% 95% 99% 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% 100 250 500 750 Percent of Products Meeting Level Milliseconds

Start‐up time for Lamps meeting V2.0 Proposed Efficacy Requirements – by Technology

903 98 805 1,975 99 1,876 2,324 100 2,224 2,428 106 2,322 All CFL LED

  • V1.1: Start time must be ≥1000 milliseconds of application of electrical power
  • Proposed V2.0: Start time must be ≥500 milliseconds of application of electrical power.

– 95% of lamps that meet the proposed efficacy levels have a start time of 500 milliseconds or less.

slide-6
SLIDE 6

Section 11.5: CFL Run-Up Time

Run‐up Time for CFL Lamps Meeting V1.1 Efficacy Requirements – by Lamp Category

1,103 100% 90% 80% 70% 60% 50% 40% 30% 20% 10% 0% 30 45 90 40% 73% 83% 92% 48% 88% 97% 99% 7% 8% 14% 66% 5% 14% 35% 63% 60 Seconds 550 535 9 6 1,006 979 11 16 1,144 1,084 19 41 1,267 90 74 All Omnidirectional Directional Decorative

  • V1.1: Covered CFLs must achieve 80% stabilized light output in ≤120 seconds and all
  • ther CFLs must achieve 80% stabilized light output in ≤60 seconds
  • Proposed V2.0: Lamp must achieve 80% stabilized light output in ≤60 seconds

Percent of Products Meeting Levels

slide-7
SLIDE 7

Section 11.5: CFL Run-Up Time

Run‐Up Time for CFL Lamps Meeting V2.0 Efficacy Requirements – by Lamp Category

103 104 105 100% 90% 80% 70% 60% 50% 40% 30% 20% 10% 0% 30 45 90 53% 91% 55% 97% 98% 99% 92% 100% 0% 0% 0% 0% 0% 33% 33% 33% 60 Seconds 57 57 97 96 1 104 1 1 All Omnidirectional Directional Decorative

  • V1.1: Covered CFLs must achieve 80% stabilized light output in ≤120 seconds and all other

CFLs must achieve 80% stabilized light output in ≤60 seconds

  • Proposed V2.0: Lamp must achieve 80% stabilized light output in ≤60 seconds.

– 97% of lamps that meet the proposed efficacy levels have a run-up time of 60 seconds or less.

Percent of Products Meeting Levels

slide-8
SLIDE 8

Section 9.7: Color Rendering: All Lamps

R9 of Lamps Meeting V1.1 Efficacy Requirements – by Lamp Category

Percent of Products 100% 90% 80% 70% 60% 50% 40% 30% 20% 10% 0% 17% 36% 4% 17% 83% 64% 96% 83% 4,322 865 1,213 2,686 423 674 103 88 R9>0 R9<=0 All Omnidirectional Directional Decorative

  • V1.1: No R9 requirement for CFLs
  • Proposed V2.0 requirement of R9>0
slide-9
SLIDE 9

Section 9.7: Color Rendering: All Lamps

R9 of Lamps Meeting V2.0 Efficacy Requirements – by Lamp Category

Percent of Products 100% 90% 80% 70% 60% 50% 40% 30% 20% 10% 0% 3% 10% 0% 1% 97% 90% 100% 99% 2,383 571 1,589 223 63 60 1 2 R9>0 R9<=0 All Omnidirectional Directional Decorative

  • V1.1: No R9 requirement for CFLs
  • Proposed V2.0 requirement of R9>0

– 97% of lamps that meet the proposed efficacy requirements have R9>0

slide-10
SLIDE 10

Section 9.7: Color Rendering: All Lamps

R9 of Lamps Meeting V1.1 Efficacy Requirements – by Technology

Percent of Products 100% 90% 80% 70% 60% 50% 40% 30% 20% 10% 0% 17% 63% 0% 83% 37% 100% 4,322 514 3,808 865 864 1 R9>0 R9<=0 All CFL LED

  • V1.1: No R9 requirement for CFLs
  • Proposed V2.0 requirement of R9>0
slide-11
SLIDE 11

Section 9.7: Color Rendering: All Lamps

R9 of Lamps Meeting V2.0 Efficacy Requirements – by Technology

Percent of Products 100% 90% 80% 70% 60% 50% 40% 30% 20% 10% 0% 2,383 45 2,338 42% 97% 100% 58% 3% 63 62 0% 1 R9>0 R9<=0 All CFL LED

  • Proposed V2.0 requirement of R9>0
  • Currently, 82% of lamps on the ENERGY STAR Certified Lamps Product List have an

R9 >0 – 97% of lamps that meet the proposed efficacy requirements have R9>0