ST STRATEGIC ATEGIC FO FORESIGHT ESIGHT GR GROUP OUP NBI, ENTEBB BBE: E: 09 AU AUGUST ST 2016 2016 WAT ATER COO OOPERA ERATION: ON:TH THE E VO VOLTA B A BAS ASIN Charles les Biney y Volta a Basin n Autho hority ty Exec


slide-1
SLIDE 1

ST STRATEGIC ATEGIC FO FORESIGHT ESIGHT GR GROUP OUP

NBI, ENTEBB BBE: E: 09 AU AUGUST ST 2016 2016 WAT ATER COO OOPERA ERATION: ON:TH THE E VO VOLTA B A BAS ASIN

Charles les Biney y Exec ecuti utive ve Directo ctor Volta a Basin n Autho hority ty Ouag agad adou

  • ugo

gou, u, BF

slide-2
SLIDE 2

Riparian Countries

Country % of Basin Area % of Country

Benin 3.41 12.1 Burkina Faso 42.9 62.4 Cote d’Ivoire 2.48 3.1 Ghana 41.6 70.1 Mali 3.12 1.0 Togo 6.41 45.0

slide-3
SLIDE 3

The Volta Basin Authority (VBA)

Informal links between Ghana and Burkina in the 1970s Formally established in January 2007 by the Convention

  • n the Status of the Volta River and Establishment of the

Volta Basin Authority to:

i. Promote permanent consultation tools among the parties;

  • ii. Promote implementation of IWRM and the equitable

distribution of the benefits;

  • iii. Authorize the development of infrastructure and projects

that could have substantial impact on the basin;

  • iv. Develop joint projects and works;
  • v. Contribute to poverty alleviation, …and better

socioeconomic integration in the sub-region. Convention came into force August 2009

slide-4
SLIDE 4

Autorité du Bassin de la Volta (ABV) Bénin, Burkina Faso, Côte d’Ivoire, Ghana, Mali, Togo

Per ermane manent nt Or Organs gans

Assembly of Heads of State and Govts. Forum of Parties Executive Directorate Committee of Experts Council of Ministers

slide-5
SLIDE 5

VBA 5-Year Strategic Plans

1st Strategic Plan: 2010-2014

Strengthening of institutional framework and

  • perationalization of all permanent organs;

Technical and Financial Partners Consultative Group; Expansion of knowledge on the state of water resources; Recruitment of key staff; VBA Observatory

slide-6
SLIDE 6

VBA 5-Year Strategic Plans

2nd Strategic Plan: 2015-2019 (KPI of IOW)

Strengthening VBA’s position in regional integration and economic development policies in the Volta basin

  • Water Charter
  • Communication Plan
  • Master Plan for Development and WRM
  • National Focal Structures
  • Protection of Ecosystems

WB/GEF Volta Basin Strategic Action Programme Implementation Project (VSIP)

slide-7
SLIDE 7

Water Cooperation

Indica icato tors Comment ments

  • 1. Agreement

Convention; with clearly defined jurisdiction; 2.Commission VBA; started as a Technical Committee;

  • 3. Ministerial

Meetings

Part of statutes but frequency of meetings changed due to financial/staff constraints;

  • 4. Tech. Projects

VHP Capacity building; VSIP Ecosystems protection;

  • 5. Env. Protection

and QC Partially, more after dev of Water Charter;

  • 6. Joint WFlows

Monitoring VHP and VBA Observatory;

  • 7. Floods, Dams &

Reservoirs Flood management between BF and GH - notification and consultation;

  • 8. High Political

Commitment Not very effective; only one meeting held since 2007

  • 9. Integration into
  • Econ. Coop.

BOs in West Africa are too distant from REC

  • 10. Actual

Functioning

Possible but complicated …late establishment of VBA; WC and MP required; financial challenges

slide-8
SLIDE 8

Financial Contributions

Cost Sharing Formula i. Surface area of the basin;

  • ii. Resident population;
  • iii. Annual per capita income of

Member States;

  • iv. Solidarity among States -

equal sharing of 30% of

  • perational costs.

Count ntry % Benin 10 Burkina Faso 29 Cote d’Ivoire 09 Ghana 29 Mali 09 Togo 15

slide-9
SLIDE 9

VBA in Perspective

Catalyzed by SDGs

Establis blishme hment nt / Conventio ntion n in force e - 2009 2009 Legal/In l/Institu stitutiona tional Framew ewor

  • rk:

k: Water Charte ter r -2018 2018

Streng engthe thenin ning g Data ta colle lection/ ction/Kno nowledge ledge base/ e/DM DM Tools ls /Par artner tnerships hips

Technic nical al Framewor

  • rk:

k: Master er Plan - 2020? 2020?

Capac acity ity Building lding and Manage gement: ment: Human, man, Finan ancial, cial, Proced cedur ures es

Contrac acting ting Au Authori

  • rity

ty - 2025? 2025?

Mature and reliable VBA - Increased sed Water Coop.; .; >2030 ?