SOUTH SIDE PARK PHASE 1 Public Meeting Schematic Design HOW DID WE GET HERE? Master Plan completed in May 2018 by Department of City Planning and Studio Bryan Hanes Outlined programming and improvements for the park.


slide-1
SLIDE 1

SOUTH SIDE PARK – PHASE 1

Public Meeting – Schematic Design

slide-2
SLIDE 2

HOW DID WE GET HERE?

  • Master Plan completed in May 2018 by Department
  • f City Planning and Studio Bryan Hanes
  • Outlined programming and improvements for

the park.

  • Identified a phasing plan with Green

Infrastructure, a Boardwalk, Basketball Court, Children’s Discovery Area, Shared-Use Bike Path, Renovated Parking, etc. as Phase I

  • Project transitions from Department of City

Planning to Department of Public Works for implementation

  • City received Capital funding to further design and

construct Phase I of the Master Plan.

  • City applied for GTRP and LWCF Grants
  • Pashek + MTR was hired as a consultant to the City

to implement above-ground features of Phase I.

  • Partnering with PWSA to design Green

Infrastructure to manage stormwater

Images by Studio Bryan Hanes

SOUTH SIDE PARK - INTRODUCTION

slide-3
SLIDE 3

GREEN INFRASTRUCTURE AND STORMWATER MANAGEMENT HOW DID WE GET HERE?

  • Presented Final Preliminary Design at August

2019 Community Meeting

  • M-16 Priority Watershed in Green First Plan
  • 103 Million Gallons (MG) Combined Sewer

Overflow (CSO)

  • Watershed Goals
  • 1.5” from 23 Acres of Impervious Area
  • Reduce CSOs
  • Create Capacity in Combined Sewers
  • Project Goals
  • 1.5” from 9 acres of Impervious Area
  • Capture and Retain Stormwater to Slowly

Release

  • Currently in 60% Design Phase

SOUTH SIDE FLATS STORMWATER SEPARATION – FUTURE PHASE SOUTH 21ST STREET GREEN INFRASTRUCTURE PROJECT – WESTERN PENNSYLVANIA CONSERVANCY SOUTH SIDE PARK PROJECT

SOUTH SIDE PARK - INTRODUCTION

slide-4
SLIDE 4

Phase 1 Scope – How it fits in with the Master Plan Phase 1 Project Schedule Review of Preliminary Design for Phase 1 Next Steps Community input via “stations” and comment forms

SOUTH SIDE PARK - AGENDA

slide-5
SLIDE 5

SOUTH SIDE PARK – PHASE 1 SCOPE SUMMARY

Image by Studio Bryan Hanes

slide-6
SLIDE 6

SOUTH SIDE PARK – SCHEDULE

slide-7
SLIDE 7

SOUTH SIDE PARK – SCHEMATIC DESIGN SITE PLAN

slide-8
SLIDE 8

SOUTH SIDE PARK – STORMWATER MANAGEMENT

slide-9
SLIDE 9

SOUTH SIDE PARK – QUARRY FIELD PARKING

EXISTING CONDITIONS

Concessions Building Quarry Field

42 spaces

slide-10
SLIDE 10

SOUTH SIDE PARK – UNDERGROUND STORMWATER STORAGE SYSTEMS

  • Various storage nodes throughout the valley to detain

runoff and slow release into the open swale.

  • Each node will have overflow connections to the

combined sewer to engage during large storms.

  • Underground systems will all have access for long

term maintenance

slide-11
SLIDE 11

SOUTH SIDE PARK – PLAYGROUND, DISCOVERY GARDEN AND RAIN GARDEN

EXISTING CONDITIONS

Quarry Field

5 spaces

Playground Rain Garden Discovery Garden Basketball Court Serpentine Steps

slide-12
SLIDE 12

SOUTH SIDE PARK – DISCOVERY GARDEN AND RAIN GARDEN

slide-13
SLIDE 13

SOUTH SIDE PARK – PLAYGROUND

slide-14
SLIDE 14

SOUTH SIDE PARK – FESTIVAL GREEN

EXISTING CONDITIONS

Picnic Lawn Planted Swale Picnic Pavilion (future phase) Marble Rings (future phase) Amphitheater Area (future phase) Rain Garden Bike Racks Lawn Steps Food Trucks

slide-15
SLIDE 15

SOUTH SIDE PARK – FESTIVAL GREEN

slide-16
SLIDE 16

SOUTH SIDE PARK – BOARDWALK AND PARKING

EXISTING CONDITIONS

Stepped Stormwater Garden

56 spaces

Boardwalk Shared Bike Lane Connection to Existing Stairs Overlook Overlook

B A

slide-17
SLIDE 17

SOUTH SIDE PARK – BOARDWALK AND PARKING

EXISTING CONDITIONS

Stepped Stormwater Garden

56 spaces

Boardwalk Shared Bike Lane Connection to Existing Stairs Overlook Overlook

B A

Accessible Route

slide-18
SLIDE 18

SOUTH SIDE PARK – SCHEMATIC DESIGN SECTIONS

Stepped Stormwater Garden Section A Stepped Stormwater Garden Section B

slide-19
SLIDE 19

SOUTH SIDE PARK – STEPPED STORMWATER GARDENS

Image by Studio Bryan Hanes

slide-20
SLIDE 20

SOUTH SIDE PARK – 21ST STREET ENTRANCE

EXISTING CONDITIONS

Rain Garden Stormwater Storage Entrance Median

slide-21
SLIDE 21

SOUTH SIDE PARK – 21ST STREET ENTRANCE STORMWATER STORAGE

Image by Studio Bryan Hanes

slide-22
SLIDE 22

SOUTH SIDE PARK – SCHEDULE

slide-23
SLIDE 23

SOUTH SIDE PARK

WE WANT YOUR INPUT !!