smart energy road and traffic system serts
play

Smart Energy Road and Traffic System SERTS - Enabling Paradigm - PowerPoint PPT Presentation

Smart Energy Road and Traffic System SERTS - Enabling Paradigm Shifting Environmental Technology - Saturday, August 31, 13 GGBC Smart Energy Road and Traffic System - SERTS - An energy harvesting, self healing micro smart grid with wireless,


  1. Smart Energy Road and Traffic System SERTS - Enabling Paradigm Shifting Environmental Technology - Saturday, August 31, 13

  2. GGBC Smart Energy Road and Traffic System - SERTS - An energy harvesting, self healing micro smart grid with wireless, mobile inductive charging for electric vehicles - Features include: • Energy harvesting, capture, and storage of 100% renewable energy • Unique combination of solar, thermal heat collection, geothermal, wind, and kinetic energy utilisation • Provides decentralised and secure energy • Innovative infrastructure - both covered (roof) and contoured (roadside) by solar panels • Wireless, mobile charging of EVs through inductive charging and resonant inductive coupling • Enables electric mobility of tra ffj c and intelligent tra ffj c on a large scale • Nano, graphene, organic light emitting diode, and other cutting edge technologies Saturday, August 31, 13

  3. GGBC SERTS - part of Green Business Campus, Gotland Vehicle Test Environment Smart Infrastructure Zero & Low Emission Gotland Ring Smart Energy Road and Traffic Vehicle Centre System (SERTS)/tarmac/road World’s first ecological test- and Testing, demonstration, network/digital traffic system race circuit, already operational development, evaluation, launches, exhibitions Renewable Energy Eco Design Wind Sustainable Design for Solar Better Living, Industrial Heat capture and storage Design, Green Architecture, Geothermal Smart Buildings Kinetic Micro smart grid Saturday, August 31, 13

  4. Gotland Ring - e n a b l i n g e n v i r o n m e n t - • Construction site for SETRS - Southern Loop of the already operational Northern Loop • World’s first sustainable race & test circuit with 100% electricity supplied from windpower (10 windmills) and built with recycled material through a sustainable construction model Nordshleife-like driving pleasure in safe surroundings • Smooth tarmac, FIA international standard design (width: 12-21 meters), wide safety zones/run-o fg areas • One of the most exciting and demanding circuit profiles • Ecstatic surroundings Saturday, August 31, 13

  5. Enabling Environment A world class circuit and future green business campus area • World’s first sustainable race and test circuit • New model launch and product training centre • Zero and low emission mission specific vehicle centre • Testing centre for vehicle dynamics • Smart Energy Road and Tra ffj c System, a demonstration and development centre for a new innovation (an energy harvesting smart micro grid with inductive wireless charging for EVs) - a World Ecological Forum Development project with support from Länsstyrelsen på Gotland • Driver training and tra ffj c safety development & awareness partnership/centre • Film shoots, branding activities, corporate edutainment events Saturday, August 31, 13

  6. GGBC Smart Energy Road and Traffic System - SERTS Problem Description and Main Challenges Unsustainable energy production and a dependency on fossil fuel-based consumption is one of the crucial factors to anthropogenic climate change. To avoid reaching critical thresholds and possible tipping points with irreversible cataclysmic environmental change, it is of utmost importance to create a paradigm shift within energy production and consumption. Smart Energy Road and Tra ffj c System (SERTS), a spin-o fg s of the World Ecological Forum activities, provides a paradigmatic and instrumental platform to facilitate the development of a new era of sustainability. A synergetic multilateral cluster of partners will form an alliance to conduct research, develop, test, demonstrate, and analyse the technical and commercial viability of this revolutionising sustainable energy harvesting and mobile wireless charging technology. Smart Energy Road and Tra ffj c System (SERTS) - an intelligent energy harvesting and wireless electric charging road network - accelerates the electrification of tra ffj c. SERTS provides sustainable energy not only for the actual smart road system, but also for surrounding buildings and infrastructure. SERTS will create the core for micro smart grids. It will also provide a new type of energy supply for not only tra ffj c, but also for all other purposes. Saturday, August 31, 13

  7. One of the most exciting race & test circuits in the world • The 3.2 km Northern Loop (already operational) and the next phase Southern Loop combined will provide a unique 7.4 km Grand Prix/test circuit profile • After 2014, a multipurpose track network totaling approx. 28 km with six(6) separate grand loops - including a Smart Energy Road and Tra ffj c System with wireless inductive charging for EVs - will be possible to install • Racing champions consider the already existing 3.2 km Northern Loop as one of the most exciting and challenging circuit profiles in the world Saturday, August 31, 13

  8. GGBC Smart Energy Road and Traffic System - SERTS Problem Description and Main Challenges The intended green business campus area - which already includes the world's first ecological test and race circuit - all electric vehicles can be recharged with 100% windpower. Gotland Ring - the first sustainable test and race track in the world - has previously hosted testing and worldwide new model launches for Honda (for example, the hydrogen electric Honda FCX Clarity) and BMW (introduction of the so called E ffj cient Dynamics technology). A demonstration and test platform on northern Gotland can facilitate the analysis of the technical and commercial viability for energy harvesting and wireless inductive charging and resonant inductive coupling. The facility enables multilateral partnerships for the development of paradigm shifting technologies and concepts within renewable energy harvesting, micro smart grid development, electric intelligent mobility and tra ffj c systems. SERTS can become an instrumental part of a Nordic contribution towards a more sustainable mobility; the on-going game change within the automotive industry provides a unique opportunity for the region to gain a significant new role as an innovator, and therefore, capture new territory in the largest business in the world. Saturday, August 31, 13

  9. EV paradigm - key drivers Unsustainable fossil fuel based consumption Anthropocene - New era for sustainability and Alternative energy resulting in alternative energy technology reaching increasing technology threshold environmental pressure Saturday, August 31, 13

  10. GGBC Enabling Environment Campus Synopsis • Location: island of Gotland, restoration project for an old limestone quarry area • Area: 200 ha of land allocated for Gotland Green Business Campus and Gotland Ring, additional expansion of approximately 200 ha after 2014 • Zero- and low emission vehicle tests and international new model launches have already conducted on Gotland Ring, the world’s first ecological test and race circuit • Currently all electricity is provided from ten (10) on-site windmills • Expansion of renewable energy production and development through SERTS • Port and marina available next to the facility, international airport 25 min from the campus • Gotland Green Business Campus - real and virtual • Emphasis on activities supporting social and environmental entrepreneurship • Cutting edge green technology hub with active strategic crossover co-operation • Smart buildings and eco resort development create a unique synergetic real estate project Saturday, August 31, 13

  11. GGBC Gotland Green Business Campus Gotland Ring Ecology and Sustainability Synopsis • Gotland Ring is the first ecological race and test circuit in the world which makes it an excellent platform for electric vehicles and other zero- and low-emission vehicles tests, Gotland Ring development and new model launches • Incubation and outcubation activities for the automotive and motorcycle industry World’s first ecological • Tra ffj c safety & ecology event content in edutainment format, derived from racing test- and race circuit, • Electricity produced through 100 % wind power already operational • Project construction executed with minimum environmental impact thanks to the location and co-operation with Nordkalk, the largest limestone producer in Northern Europe • Building structures are mostly made of recycled material • All safety zones, incl. conveyer belts and tyre walls are recycled materials • No pesticides are used on Gotland Ring and its surroundings • Experimental water & sewage and energy system in planning phase • Testing and launch facility for zero- and low-emission vehicles (100 % wind power propulsion for plug-ins) • Creating intelligence for mission-specific vehicles and tra ffj c systems • Providing educational support through awareness campaigns for tra ffj c safety eco driving and sustainable development • Implementing self-imposed environmental and safety norms and standards that are stricter than the EU requirements for public roads • Environmental strategy development in collaboration with the Eco-Municipality of Gotland • Strategic partner of World Ecological Forum Saturday, August 31, 13

  12. GGBC Smart Energy Road and Traffic System - SERTS Paradigm shifting technological goals Enabling Environmental goals Infrastructure Smart Energy Road and Traffic safety goals Traffic System SERTS Energy harvesting Social and economic goals network/tarmac/digital traffic system SERTS Added Value Areas Saturday, August 31, 13

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend