Sheldon Way Pathway to Field Cost Summary (Forecast) Demolition*: - - PowerPoint PPT Presentation

Existing Cafeteria MPR Existing Portable Classrooms To Be Used Existing Play Structure Sheldon Way Pathway to Field Cost Summary (Forecast) Demolition*: $1.6M Design/CA: $87K Area of Demolition Spec. Consult. $25K CM:


slide-1
SLIDE 1
slide-2
SLIDE 2

Existing Cafeteria MPR Existing Portable Classrooms To Be Used Existing Play Structure

Sheldon Way Pathway to Field

slide-3
SLIDE 3

Cost Summary (Forecast)

  • Demolition*:

$1.6M

  • Design/CA:

$87K

  • Spec. Consult.

$25K

  • CM:

$81K Total $1.8M Area of Demolition * Based on October 13,2014 Mercurial Consulting Estimate

slide-4
SLIDE 4

Valley View demolition to be considered as part of the Facilities Master Plan sequencing and cost analysis decision-making process

The following also needs to be taken into consideration

 Interim campus will use portion of existing building until new

construction of school

 Add’l design and DSA costs would be required since demolition

plans part of new construction of building

 Existing campus will be monitored closely by District staff for

vandalism until demolished

 Board decision for interim campus did not constitute a decision

to move forward with demolition and/or construction of new school