Waimea Community Dam Shareholders update 12 September 2019 12/09/2019 Waimea Water Ltd 1 Agenda Project update Annual Report Q&A 20/05/2019 Waimea Water Ltd 2 Waimea Dam is underway and progressing well Ground Breaking


slide-1
SLIDE 1

Waimea Community Dam Shareholders update

12 September 2019

Waimea Water Ltd 12/09/2019 1

slide-2
SLIDE 2

Agenda

  • Project update
  • Annual Report Q&A

Waimea Water Ltd 20/05/2019 2

slide-3
SLIDE 3

Waimea Dam is underway and progressing well

Ground Breaking Ceremony 9 August 2019

Waimea Water Ltd 3 12/09/2019

slide-4
SLIDE 4

Design

  • Damwatch supporting design enhancements and construction verification (PS-4)
  • Optimising zoning of rock fill materials to provide flexibility and robustness to geology
  • Optimised spillway design to de-risk construction and operations
  • Optimised plinth design and updated grout curtain specification
  • Mechanical and Electrical design progressing (hydropower compatible)

Waimea Water Ltd 4

2009: 5-9 2012: 10-14 2017: 15-17

12/09/2019

slide-5
SLIDE 5

Construction

  • Access Road: 5.5 km of 6.5 km complete.
  • Pig Flat bridges underway
  • Haul roads established
  • Concrete batching plant operational
  • Clearing Right Hand Abutment

Inspected and mapped top exposed section

  • Cutting down for Left Hand Abutment
  • Excavating for Left Hand plinth

Completed and cleaned for first 20m

  • River training to Left Hand side
  • Vegetation clearance, salvage and mulch underway

Waimea Water Ltd 5 12/09/2019

slide-6
SLIDE 6

Construction: Clearing LHS Abutment. As expected

Waimea Water Ltd 6 12/09/2019

slide-7
SLIDE 7

Construction: Preparing for LHS Plinth. As expected

Waimea Water Ltd 7 12/09/2019

slide-8
SLIDE 8

Construction: Preparing for LHS Plinth. As expected

Waimea Water Ltd 8 12/09/2019

slide-9
SLIDE 9

Construction: Clearing RHS Abutment. As expected

Waimea Water Ltd 9 12/09/2019

slide-10
SLIDE 10

Construction: September to December 2019

  • Clear the RHS and LHS abutments and plinth cut. Rock anchors and slope stabilisation
  • Commence forming plinth LHS and RHS
  • Construct diversion bunds to move river away from RHS for culvert construction
  • Excavate for and commence forming culvert in RHS of riverbed
  • Continue vegetation clearance in reservoir footprint

Waimea Water Ltd 10 12/09/2019

slide-11
SLIDE 11

Environment and Sustainability

  • 164 Resource Consent conditions; Working 98 action items
  • Biodiversity Management Plan approved with 8 plans. BTAG

Onsite

  • 7/9 SCEMPS approved, implemented and being monitored
  • 4 Sediment Retention Ponds & 8 Decanting Bunds operating
  • Hydroseeding & mulching mitigates erosion and sedimentation
  • Fortnightly independent water quality monitoring complies
  • Continuous turbidity monitors guides river works
  • 2/4 rare plant species being moved (BMP #2)

Offsite

  • Ordering 10,000 plants and weed control for Rough Island

Waimea Water Ltd 11 12/09/2019

slide-12
SLIDE 12

Program

Waimea Water Ltd 12 12/09/2019

slide-13
SLIDE 13

Challenges and Risks

  • Geology to be better understood 4Q2019
  • Mechanical, electrical and surveillance design finalised 4Q2019
  • Schedule risk to be better understood 2H2020 – commence main embankment
  • Force Majeure Risks: Drought / Fire risk; Disturbances

Waimea Water Ltd 13

Coming Up Town Hall Public Forum: Info Event – Waimea Community Dam Richmond Town Hall – Meeting Room Wednesday 25th of September 2019, 7:00pm – 8:30pm Speakers: Waimea Water; Damwatch Engineering; Fulton Hogan Taylors

12/09/2019

slide-14
SLIDE 14

SOI: We are doing what we said we would do

✓ Implement Health and Safety Management System complementing Contractor’s system ✓ Verify and audit Contractor compliance and track investigations ✓ Track key leading and lagging indicators ✓ Comply with Resource Consent conditions and Biodiversity Management Plan ✓ Review and audit Construction Environmental Management and Vegetation Clearance Plans ✓ Water quality monitoring ≈ Implement carbon offset (ETS) plan; and minimise carbon emissions ✓ Optimise design for safe, reliable and efficient operation ✓ Design (PS-1; PS-2) and construction (PS-4) certification ≈ Review and optimise schedule for practical completion Oct-2021

Waimea Water Ltd 14

Health & Safety Sustainability Project Delivery

12/09/2019

slide-15
SLIDE 15

SOI: We are doing what we said we would do

Waimea Water Ltd 15

Risk Manage Funding Engagement

✓ Provide regular and transparent cost and funding forecasts to completion ✓ Meet statutory and agreed financial deadlines with financial accounts. Audited ✓ Operate an effective internal control environment ≈ Active engagement with our communities and stakeholders ✓ Proportionate media and social media presence ✓ Engage Mana Whenua. Implementation Agreement ✓ Implemented small and specialised organisation of experienced professionals ✓ Implemented a system to determine and mitigate risks ✓ Governing the project to mitigate cost and schedule risk

12/09/2019

slide-16
SLIDE 16

SOI: We are doing what was said we would do

Waimea Water Ltd 16

Funding and Spend Forecast cost & schedule to complete

12/09/2019

slide-17
SLIDE 17

Waimea Water Ltd 17

Risk Management: 22% of Project Budget at Risk

SOI: We are doing what we said we would do

Compaction trials Further Borelogs Embankment design M&E Design Refine Grout Spec FM Preparedness

Identify Ownership Assess Mitigate Portfolio

Risk Register (56 27)

12/09/2019

slide-18
SLIDE 18

SOI: We are doing what we said we would do

Waimea Water Ltd 18

Health and Safety Compliance and Audit Late or urgent compliance issues:

12/09/2019

slide-19
SLIDE 19

Plan: Quarterly Update to Shareholders

Waimea Water Ltd 19

September

1. Project Update 2. Annual report 3. Performance against Statement of Intent previous year

December February May

1. Project Update 1. Project Update 2. Interim (half yearly) report 3. Proposed Statement of Intent for next year 1. Project Update

12/09/2019

slide-20
SLIDE 20

Agenda

  • Project update
  • Annual Report Q&A

Waimea Water Ltd 20 12/09/2019