Shaping the Future of Forestry Commission England The way forward to 2015 Presentation for all staff 23 rd May 2011 The SR10 Challenge Reduction in Defra funding by 25% by 2014/15 Stopping the use of land sales as means to balance the


slide-1
SLIDE 1

Shaping the Future of Forestry Commission England

The way forward to 2015 Presentation for all staff 23rd May 2011

slide-2
SLIDE 2

2 DRAFT V8 - Shaping our Future – May 2011

  • Reduction in Defra

funding by 25% by 2014/15

  • Stopping the use of

land sales as means to balance the books (currently £8m per annum)

  • Change what the

Forestry Commission delivers and how it is delivered to reflect the Government’s new policies and approach.

The SR10 Challenge

slide-3
SLIDE 3

3 Shaping our Future – The Way Forward - May 2011

Our Initial Response

  • Cannot continue with small

incremental changes – significant reform is essential so that we remain fit for purpose

  • Launched staff consultation on 2nd

February

  • Extended at the request of the FCTU
  • Consultation closed on 1st April

and we have now revised proposals in light of feedback and

  • ther work
  • Consultation on Shared Services

and England Corporate Functions is still to begin.

slide-4
SLIDE 4

4 Shaping our Future – The Way Forward - May 2011

Please Remember!

  • FC is a successful organisation, delivering a wide

range of benefits – but we are facing unprecedented change

  • Our settlement with Defra requires us to reduce our

resources budget by 25%

  • We need to re-shape our organisation so that we

are fit for the future - your input has helped us to improve our plans – thank you

  • We encourage your ongoing participation in shaping
  • ur new ways of working
  • We appreciate everyone's ongoing hard work and

your commitment to our values.

slide-5
SLIDE 5

5 Shaping our Future – The Way Forward - May 2011

Why We Are Here

  • Today is to present to all staff and FCTU:
  • Revised plans following consultation
  • Updated Staff Protocol
  • Headline Implementation Plan
  • These build on the presentation given in February

and feedback to the consultation

  • Seek to confirm as much detail as we can do at

this stage

  • Further changes will follow once:
  • Further work is completed, and
  • After the Shared Services and Corporate Functions

consultation

  • We may need to make some changes earlier than

we currently anticipate

slide-6
SLIDE 6

6 Shaping our Future – The Way Forward - May 2011

Staff Consultation Feedback

  • An excellent response to the consultation
  • Over 500 responses from individuals, teams and the

Trade Unions

  • 88% from individuals
  • 12% from groups
  • 67% from Forest Enterprise staff
  • 26% from Forest Services staff
  • 7% from others
  • We have made a number of significant changes as

a result

  • Further detailed suggestions will be incorporated

as part of the detail of the implementation plans.

slide-7
SLIDE 7

FC England Overview

slide-8
SLIDE 8

8 Shaping our Future – The Way Forward - May 2011

Our Vision – a reminder

  • By April 2015 the Forestry

Commission in England has evolved in its scale, remit and approach, to lead the delivery of Government policy for trees, woods and forests, whilst achieving deficit reduction funding targets and to be resilient so as to continue to be able to deliver into the future.

slide-9
SLIDE 9

9 Shaping our Future – The Way Forward - May 2011

New Policy Priorities

  • We will focus on:
  • Protection: protecting the woodland resource and increasing its

resilience, for example, to pests, diseases and the impact of climate change

  • Improvement: improving the woodland resource to enhance

benefits including biodiversity, landscape quality and a range of

  • ther ecosystem services
  • Expansion: Promote and incentivise the planting and natural

regeneration of trees, woods and forests of the right type in the right place

  • We will deliver this by:
  • Empowerment and Engagement: empowering and enabling

people to engage with trees, woods and forests, so that they can determine the benefits that they wish to see delivered

  • Economic Activity: promoting a competitive, thriving and

resilient forestry sector alongside a wide range of private sector business partners.

slide-10
SLIDE 10

10 Shaping our Future – The Way Forward - May 2011

England Structure and Senior Staff*

Director General Chief Executive Director of Forest Services Head of FS Delivery Head of Woodland Expansion and National Expertise Head of Sustainable Forest Management Director of Forest Enterprise Head of Sustainable Land Management Head of Estates Head of Recreation and Public Affairs

  • Create two teams of Forest Services

and Forest Enterprise

  • Look to take advantage of

efficiencies from sharing services and/or offices

  • Looking to make all possible savings

and efficiency gains to minimise staff losses.

  • Integrated senior management

structure with combined Director General and Director England post

  • Clearer support and single

point of contact for Westminster

* Includes Senior Staff Group, and Pay Band 1s with a national role and excludes England Corporate Functions and other reporting responsibilities, in England or elsewhere

slide-11
SLIDE 11

The Way Forward for Forest Services

slide-12
SLIDE 12

12 DRAFT V8 - Shaping our Future – May 2011

  • Move to a 5-area structure each led by an Area Director

and based on amalgamated regional boundaries

  • Delivery and partnership / expertise teams based within

these areas and with a greater lead in sub-national or national roles

  • Woodland Officers (numbers maintained) with refreshed

roles to reflect the new delivery framework and based locally to reflect their working areas

  • Administrative teams primarily organised in hubs and

managed from the national office. Some additional work is required before a final conclusion.

Forest Services Summary 1

slide-13
SLIDE 13

13 DRAFT V8 - Shaping our Future – May 2011

  • A national expertise team organised around ecosystem

services and with greater distribution of expert roles to local teams and recognition and use of the expertise within local teams

  • Combined Strategic Development Team in the national
  • ffice supporting the whole of FS (national and local

delivery).

  • A single Management Board consisting of 4 senior

Forest Services posts with representation from local delivery teams from an Area Director on a rotating basis

  • Proposals may need some adaptation when the

Independent Forestry Panel has reported and Ministers have responded.

Forest Services Summary 2

slide-14
SLIDE 14

14 DRAFT V8 - Shaping our Future – May 2011

  • Our approach remains consistent with the consultation

document as a high proportion of our activities are:

  • statutory duties
  • existing or new programmes endorsed by Ministers and
  • directly reflecting FC’s own delivery framework or
  • ensuring technical expertise at the local and national levels
  • focusing on doing things differently – e.g. different ways of

administering grants and others delivering for us

  • or doing less e.g. reduced manner
  • But responds to consultation feedback e.g.:
  • further work on implementing admin hubs
  • using existing regional boundaries
  • respecting the Midlands as an entity
  • Providing northern representation.

Our Approach

slide-15
SLIDE 15

15 Shaping our Future – The Way Forward - May 2011

Main Structures – Local Areas

  • A refined 5 area structure, each led by a PB2 Area

Director (one change of Main office from Delamere to Penrith – with EA and NE)

  • Reflect and combine existing regional boundaries
  • Delivery and Partnership / local expertise teams

based within those areas, with some lead expertise roles

  • Woodland officers (numbers maintained) with

refreshed roles based locally to reflect their working areas

  • Management Structures in areas reflecting

reasonable spans of control

  • Administrative teams primarily organised in hubs

and managed from the national office.

slide-16
SLIDE 16

16 Shaping our Future – The Way Forward - May 2011

New Forest Services Areas

slide-17
SLIDE 17

17 Shaping our Future – The Way Forward - May 2011

FS Areas and Offices

Area Main office and Administrative Hubs (at 14/15) Offices in which Administration of Forest Services will cease by 14/15 National

  • Bristol

South West

  • Exeter on Defra site or at FE Buller’s Hill as

co-located office

  • Exeter Administrative Hub
  • Coleford
  • Mamhead

South East, London and Chilterns

  • Alice Holt co-located with Forest Research
  • London sub-office co-located with Defra
  • Alice Holt Administrative Hub
  • Wendover
  • Bedgebury

East and East Midlands

  • Santon Downham co-located with FE
  • Santon Downham Administrative Hub
  • Sherwood
  • Market Rasen
  • Tangham
  • Fineshade

Yorkshire and North East

  • York co-located with FE, Defra and NE
  • York Administrative Hub
  • Rothbury
  • Hamsterley
  • Wheldrake (May 2011)

North West and West Midlands

  • Penrith . Main office – co-located with EA

and NE

  • Worcester Administrative Hub
  • Peil Wyke
  • Delamere
  • Ludlow
slide-18
SLIDE 18

18 Shaping our Future – The Way Forward - May 2011

Staff Numbers

FTE Totals Payband FY 2010/11 FY 2014/15 FTEs in 2014/15 as % of FTEs in 2010/11 Reduction in number of FTE from 2010/11 to 2014/15 SSG 1 1.00 1.00 100% 0.00 PB1 4.00 3.00 75% 1.00 PB2 17.00 12.00 71% 5.00 PB3 26.17 22.00 84% 4.17 PB4 30.23 26.00 86% 5.23 PB5 19.91 16.50 83% 3.41 PB5 (Ops) 45.53 46.00 101% (+0.47) PB6a 2.75 0.00 0% 2.75 PB6b 63.59 45 69% 18.59 PB7 0.36 0.00 0.36 Totals 210.55 171.59 81% 38.96

slide-19
SLIDE 19

19 Shaping our Future – The Way Forward - May 2011

Main Structures – National Office

  • National Expertise Team based on

ecosystem services with greater distribution of expertise roles to local teams

  • Sustainable Forest Management Team
  • Strategic Development Team supporting all

FS national and local delivery

  • Single Management Board (4 senior FS posts,

with rotating Area Director representation).

slide-20
SLIDE 20

20 Shaping our Future – The Way Forward - May 2011

Forest Services Management Board

slide-21
SLIDE 21

21 Shaping our Future – The Way Forward - May 2011

Forest Services Delivery

slide-22
SLIDE 22

22 Shaping our Future – The Way Forward - May 2011

National Expertise

slide-23
SLIDE 23

23 Shaping our Future – The Way Forward - May 2011

Sustainable Forest Management

slide-24
SLIDE 24

24 Shaping our Future – The Way Forward - May 2011

Strategic Development

slide-25
SLIDE 25

25 Shaping our Future – The Way Forward - May 2011

  • Structure
  • Administration balance between admin hubs and main offices

(to conclude by Sept 11)

  • further consider admin capacity beyond current G&R workload

assessment

  • Processes for ensuring continued good customer care

incorporated in implementation

  • Some decisions delegated to local managers, e.g.
  • Details of staff locations and FJPs
  • Hot-desks for teams etc
  • Normal business plan changes.

Areas of Further Work

slide-26
SLIDE 26

The Way Forward for Forest Enterprise

slide-27
SLIDE 27

27 Shaping our Future – The Way Forward - May 2011

  • Move to 6 Forest Districts, but a modified structure

following consultation

  • Beat structures remain at the heart of the proposals
  • No changes to previously proposed main or sub-offices
  • Maintain an additional management unit (as currently)

for Westonbirt (with head of unit having a role in all tree collections)

  • Include staff required to manage total current area of

the FC Estate.

Summary 1

slide-28
SLIDE 28

28 Shaping our Future – The Way Forward - May 2011

Summary 2

  • Civil Engineering to remain as a National functional unit
  • Incoming work from Business units/shared services not

yet included

  • Proposals may need some adaptation when the

Independent Forestry Panel has reported and Ministers have responded.

slide-29
SLIDE 29

29 Shaping our Future – The Way Forward - May 2011

  • A modified structure of 6 Forest Districts
  • Replace proposal to create a ‘Moors & Lakes’ FD & a

reduced ‘Kielder FD’ with two FDs comprised of:

  • North England - all existing Kielder FD + Bowland and

Cumbria parts of NW England FD

  • Yorkshire – based on North York Moors FD existing

boundaries

  • Move Savernake into West England District
  • Minor alterations to other proposed boundaries:
  • Warwickshire woods from Central to West
  • South Bedfordshire woods from Central to East

Forest Districts

slide-30
SLIDE 30

30 Shaping our Future – The Way Forward - May 2011

Six Districts and Westonbirt

slide-31
SLIDE 31

31 Shaping our Future – The Way Forward - May 2011

FE Structure and Senior Staff

Director FEE SSG1* SFLM PB1* H&M PB2 Civil Engineering PB2 Planning and Environment PB2* Estates PB1* Finance PB2* RPA PB1* Tourism & Leisure PB2*

*FEEMB Member

slide-32
SLIDE 32

32 Shaping our Future – The Way Forward - May 2011

  • National Office
  • Main Office at Bristol (shared with Forest Services etc)
  • Sub Office at York (shared with Forest Services)
  • Forest Districts
  • Three levels of office
  • Main FD Office (FMD, most senior team and admin)
  • Sub Office (PB4 or above and probably some admin)
  • Beat Office (PB5 and generally no admin)

Offices

slide-33
SLIDE 33

33 Shaping our Future – The Way Forward - May 2011

Management Unit Main Office

  • Sub-Offices
  • Beat Offices

Office Closures National Bristol

  • York (new office with Forest Services)
  • Clifton Moor

North Bellingham

  • Grizedale
  • Spadeadam
  • Gisburn
  • Hamsterley
  • Whinlatter and Peil Wyke
  • Rothbury
  • Dunsop Bridge

Yorkshire Pickering

  • None
  • None

Central Sherwood

  • Cannock
  • Delamere
  • Fineshade
  • Market Rasen
  • Bamford or Rosliston
  • Bourne Wood
  • Silverstone
  • Bentley

East Santon Downham

  • Bedgebury
  • Tangham
  • Wendover
  • Thames Chase
  • None

South Lyndhurst

  • Farnham (Alice Holt or Bucks Horn Oak)
  • Micheldever
  • Eartham
  • Wareham
  • None

West Coleford

  • Haldon
  • Ludlow
  • Wyre
  • Savernake
  • Halwill
  • Quantocks
  • Dunmere or Cardinham
  • Bellever

Westonbirt Westonbirt

  • None
  • None

Forest Districts

slide-34
SLIDE 34

34 Shaping our Future – The Way Forward - May 2011

  • 10/11 baseline: 872 (full time equivalent - FTE)
  • Staff number in Consultation proposal = 617 FTE
  • Following consultation staff number has been revised to

661 FTE. Revised proposal includes:

  • Retain beat-level staff to enable management of all current estate

area,

  • provision of a small number of additional specialist posts to provide

capacity for future development,

  • responses to Consultation comments on individual posts,
  • correction of anomalies and errors in previous proposed structure,
  • Staff numbers in some activities remain subject to
  • ngoing Projects:
  • Admin, Wildlife, Learning, Retail.

Staff Proposals

slide-35
SLIDE 35

35 Shaping our Future – The Way Forward - May 2011

  • Some changes have been made to Pay Bands, including

for FMDs, following feedback and further analysis of job roles, to better reflect existing arrangements and provide more consistency

  • Job titles have been rationalised from 122 to 86
  • Contracts of employment and shift and working patterns

have been reviewed for RPA staff. New draft standard contracts are being prepared to reflect typical working arrangements for consultation with the FCTU

  • Staff savings will contribute up to half of the required

financial improvement. Significant cash programme savings or income improvements will also be required.

Staff Proposals

slide-36
SLIDE 36

36 Shaping our Future – The Way Forward - May 2011

FTE Totals Payband FY 2010/11 FY 2014/15 % of 2010/11 Reduction in number of FTE from 2010/11 to 2014/15 SSG 1/1A 2.00 1.00 50% 1.00 PB1 4.00 6.00 150% (+2.00) PB2 15.8 9.00 57% 6.80 PB3 25.4 28.00 110% (+2.60) PB4 67.45 47.9 71% 19.55 PB5 (Ops and non Ops) 163.84 127.6 78% 36.24 PB6a (Ops and non Ops) 271.05 218.2 81% 52.85 PB6b 287.97 212.50 74% 75.47 PB7 35.10 11.00 31% 24.1 Totals 872.61 661.2 76% 211.41

Staff Numbers

slide-37
SLIDE 37

37 Shaping our Future – The Way Forward - May 2011

FE National Office

slide-38
SLIDE 38

38 Shaping our Future – The Way Forward - May 2011

North Forest District

slide-39
SLIDE 39

39 Shaping our Future – The Way Forward - May 2011

Yorkshire Forest District

slide-40
SLIDE 40

40 Shaping our Future – The Way Forward - May 2011

Central Forest District

slide-41
SLIDE 41

41 Shaping our Future – The Way Forward - May 2011

West Forest District

slide-42
SLIDE 42

42 Shaping our Future – The Way Forward - May 2011

East Forest District

slide-43
SLIDE 43

43 Shaping our Future – The Way Forward - May 2011

South Forest District

slide-44
SLIDE 44

44 Shaping our Future – The Way Forward - May 2011

Westonbirt Arboretum

slide-45
SLIDE 45

45 Shaping our Future – The Way Forward - May 2011

Priority Projects

  • Forest District Administration – quantifying and
  • rganising support required for new FD

structures

  • Wildlife Management – moving to a mixed

delivery model

  • Learning – moving out of direct delivery
  • Retail – moving out of direct delivery

New Projects (following Consultation)

  • Review of Procedures
  • Built Estate

Activities Projects

slide-46
SLIDE 46

46 Shaping our Future – The Way Forward - May 2011

Priority Projects (major staff implications)

  • Project Teams established from across the business
  • Reporting by end of September
  • Projects will make use of the detailed consultation

responses

  • Change in some activities is complex and requires

development of new models. Need to get this right.

  • Proposals will be subject to separate further

consultation

  • Wildlife and Admin projects do not include PB5 staff

who are already shown in the new structures

  • Numbers for PB6 and PB7 staff shown in the

structures are from the original consultation proposal and are subject to change when the projects report

  • Project plans will be made available.

Activities Projects

slide-47
SLIDE 47

47 Shaping our Future – The Way Forward - May 2011

  • Other projects will support changes required in
  • ther areas, e.g. – forest management,

community woodlands

  • These will be timed to run over the Spending

Review period

  • We will need to continue to develop new ways of

working:

  • To live within our resources
  • To meet Government expectations on localism, Big

Society and appropriate levels of engagement for public bodies.

New Ways of working

slide-48
SLIDE 48

Staffing Protocol

slide-49
SLIDE 49

49 Shaping our Future – The Way Forward - May 2011

  • rethink over categories in Staffing Protocol
  • defining what we mean by unchanged and new

jobs

  • minimising impact on people/mobility where

we can

  • revamp of assimilation arrangements
  • consultation with FCTU over principles re pools
  • f redundancy.

Outcome from Consultation....

slide-50
SLIDE 50

50 Shaping our Future – The Way Forward - May 2011

Staffing Protocol Changes

  • Three revised categories
  • Category 1 - Unchanged or minor changed posts
  • Category 2 - New Posts
  • Category 3 - Downgrading of posts
  • Revised protocol helps define what these are
  • Identify any posts that are ‘downgraded’.
slide-51
SLIDE 51

51 Shaping our Future – The Way Forward - May 2011

Why these categories?

  • Feedback and advice that we need different

approaches

  • 'Selecting out'
  • Need to use our redundancy matrix to 'select' people

'out' when we have more people than posts

  • 'Selecting in'
  • We need to use a ring-fenced 'selection' process to

select people 'in' where we have new jobs.

slide-52
SLIDE 52

52 Shaping our Future – The Way Forward - May 2011

Posts – Categories 1, 2 and 3

Redundancy matrix applied where required

Category 1 Posts Unchanged jobs Posts retained – people with existing experience, skills and competencies.

Assimilation to post Ring-fenced internal competition (at same substantive PB)

Category 2 Posts New jobs Need to fill with right people with right experience, skills and competencies

Appointment to post Further ring-fenced competition (s) then suitable alternative employment sought GB FC pool CS Vacs etc Redundancy

Category 3 Posts Downgraded jobs Options for existing post holder

  • voluntary downgrade
  • r
  • apply for new post

Phase 1 – Assimilation - “Selecting Out” Phase 2 – Appointment – “Selecting In”

slide-53
SLIDE 53

53 Shaping our Future – The Way Forward - May 2011

  • VEE first - June 2011
  • Assimilation arrangements - Phase 1
  • Posts in categories 1 & 3 dealt with first
  • Where there are more people than posts,

redundancy matrix applies

  • PB 1, 2 & specialist posts - National

assimilation

  • PB3 and below - Geographic assimilation, in

line with newly defined boundaries for FS and

  • FE. Some roles may be pooled across both

areas and possibly FR, i.e. admin roles.

slide-54
SLIDE 54

54 Shaping our Future – The Way Forward - May 2011

Assimilation arrangements - Phase 2

  • Deals with posts in category 2
  • Ring-fenced paper selection process applies

first

  • Appointments made top down
  • Staff who don't have posts need to apply
  • This includes those staff selected out in Phase 1.
slide-55
SLIDE 55

55 Shaping our Future – The Way Forward - May 2011

Surplus Staff

  • Staff who are unsuccessful in securing a post

remain 'at risk' of redundancy during phases 1 and 2

  • Staff only declared surplus and in the wider

GBFC redeployment pool once phases 1 & 2 exhausted.

slide-56
SLIDE 56

56 Shaping our Future – The Way Forward - May 2011

Implementation

  • Can only assimilate posts where structure has

been determined

  • The process will take time - top downwards
  • We may need to make some changes earlier

than we currently anticipate

  • Managers will have a key role - redundancy

matrix/selection

slide-57
SLIDE 57

Next Steps

slide-58
SLIDE 58

58 Shaping our Future – The Way Forward - May 2011

SR10 Programme – Transition Plan

2011/12 2012/13 2013/14 2014/15

HR Forest Enterprise

  • Activity based streams
  • Learning
  • Leisure and Tourism
  • Woodland Access
  • Deer and Wildlife
  • Community Woodland

Management

  • Timber production
  • Administration
  • Staff Structures
  • Built Estate

Forest Services

  • Our People
  • Our Places of Work
  • Our Ways of Working

Corporate Services

Appoint Senior Staff (inc AD’s) by 31/10/11 Initial Appointments & Assimilation Staff VEE – 2011/12 On-going HR Management and Support throughout Transition Period Planning for Office Closure, relocation and New FS Areas (inc systems changes) Office closures and re-locations – to be completed by end March 2014 From 1/4/12 – New Forest Services Areas in operation Plan / Pilot and establish Admin Hubs by 31/3/13 Develop and Implementation New Ways of Working (inc Comms and Working Relationships) Complete further Staff Appointments and Assimilation Possible Merged Grant Scheme Operating / EWGS Efficiencies District Senior Staff appointed by 31/10/11 Deliver Local Community and Stakeholder Comms (inc Media Relations – Proactive and Reactive)) Consultation Period (End June 2011) Reconfigure FS / systems to cater for FCE SR10 changes and other systems Implement SR10 changes for Finance, Comms and Secretariat in-line with Westminster changes Appoint Hd of Comms IS Systems Changes Complete further Staff Appointments and Assimilation Built Estate Review then office Closures complete by end March 2013 Implementation – Across Activity Areas covering Leisure and Tourism (Forest Centres) and (Retail), Woodland Access, Deer and Wildlife Management and other key areas following scoping. Review of Administration Functions and Implementation Support subsequent Appointments and Assimilation Processes Scoping Review for key activity areas including Learning, Community and Woodland Mgt, Management of Habitats and Heritage, Timber Production and Regeneration Planning New arrangements operational for Plant and Seed Supply (PSS) New arrangements operational for Mechanical Engineering Services (MES) Staff Skill Sets – Identify Requirements / Training From 1/4/12 – New Forest Enterprise Districts initially in operation (fully established by 1/4/13) Continued transition and transformation of Admin functions

slide-59
SLIDE 59

59 Shaping our Future – The Way Forward - May 2011

SR10 Programme - Summary Milestone Table

HR Forest Enterprise Forest Services Corporate Services (including Communications) By April 2012 We will have: By April 2013 We will have: By April 2014 We will have: By April 2015 We will have:

  • Completed PB1-2 and

Special Posts Assimilation (by 16/9/11)

  • Completed PB1-2 and

Special Posts Appointments (by 31/10/11)

  • Completed PB3 and below

Assimilation (by 31/12/11)

  • Completed PB3 and below

Appointments by 31/3/12)

  • Completed 2011/12 VEE
  • Delivered on-going HR

support to business transition teams

  • Managed on-going

appointments and assimilation processes

  • Delivered on-going HR

support to business transition teams

  • Managed on-going

appointments and assimilation processes

  • Completed all

appointments and assimilations

  • Appointed our Senior

District Staff (by 31/10/11)

  • Completed Built Estate

review and planned for office closures/ relocations

  • Completed system changes

to cater for new SR10

  • rganisation (by 31/3/12)
  • Completed Scoping for key

activity areas

  • Initiated planning around

each business activity stream

  • Prepared for start of new

Forest District Areas on 1/4/12

  • Completed Office closures

by 31/3/13

  • Completed Planning Phase

for business activity streams

  • Commenced

Implementation in areas such as Leisure and Tourism and Learning

  • Completed the majority of

appointments and assimilation

  • Operated new PSS and

MES arrangements

  • Operated fully functioning

new Forest District areas for 1 yr.

  • Continued Implementation

across Activity areas

  • Planned and Implemented

revised Administration Functions

  • Delivered required FE SR10

cost savings and headcount reductions

  • Appointed our Senior Staff

including AD’s (by31/10/11)

  • Planned for office closures

and relocations

  • Reviewed staff skill sets
  • Developed the Business

Vision and Programme for New Ways of Working

  • Planned and commenced

initial implementation around Admin Hubs

  • Prepared for the start of

new FS Areas on 1/4/2012

  • Established new Admin

Hubs and working processes by 31/3/13

  • Developed staff skill sets
  • Implemented priority New

Ways of Working

  • Completed the majority of

appointments and assimilation

  • Established new working

relationships with stakeholders

  • Completed office closures

and relocations

  • Implemented all SR10 New

ways of working

  • Completed all necessary

additional staff training

  • Prepared for and

implemented any Grant Merger arrangements or EWGS efficiency

  • Completed transition and

transformation of Admin functions

  • Delivered required FS

SR10 cost savings and headcount reductions

  • Established continuous

improvement processes around new ways of working

  • Closed the FS Transition

programme

  • Completed the SR10

Consultation process in-line with the Westminster Stream process

  • Appointed Head of Comms
  • Reconfigured systems

(especially Finance) to cater for SR10 structures

  • Managed the

communications to staff and stakeholders around the SR10 plans

  • Developed a new

Communications Strategy

  • Continued to implement

staff and cost savings in line with SR10 plans

  • Developed support tools to

help staff manage stakeholder communications

  • Continued to implement staff

and cost savings in line with SR10 plans

  • Provided Proactive and

Reactive communications to internal and external stakeholders

  • Delivered required CS

SR10 cost savings and headcount reductions

  • Provided Proactive and

Reactive communications to internal and external stakeholders

slide-60
SLIDE 60

60 Shaping our Future – The Way Forward - May 2011

SR10 Programme – FE Transition Plans

2011/12 2012/13 2013/14 2014/15

Forest Enterprise

  • Activity based

streams

  • Learning
  • Leisure and

Tourism

  • Woodland Access
  • Deer and Wildlife
  • Community

Woodland Management

  • Timber production
  • Administration
  • Staff Structures
  • Built Estate

District Senior Staff appointed by 31/10/11 IS Systems Changes Complete further Staff Appointments and Assimilation Built Estate Review then office closures complete by end March 2013 Implementation – Across Activity Areas covering Leisure and Tourism (Forest Centres) and (Retail), Woodland Access, Deer and Wildlife Management and other key areas following scoping. Review of Administration Functions and Implementation Scoping Review for key activity areas including Learning, Community and Woodland Mgt, Mgmt

  • f Habitats

and Heritage, Timber Production and Reg’n Planning New arrangements operational for Plant and Seed Supply (PSS) New arrangements operational for Mechanical Engineering Services (MES) From 1/4/12 – New Forest Enterprise Districts initially in operation (fully established by 1/4/13)

slide-61
SLIDE 61

61 Shaping our Future – The Way Forward - May 2011

SR10 Programme – FS Summary Milestone Table

Forest Enterprise

By April 2012 We will have: By April 2013 We will have: By April 2014 We will have: By April 2015 We will have:

  • Appointed our

Senior District Staff (by 31/10/11)

  • Completed Built

Estate review and planned for office closures/ relocations

  • Completed system

changes to cater for new SR10

  • rganisation (by

31/3/12)

  • Completed Scoping

for key activity areas

  • Initiated planning

around each business activity stream

  • Prepared for start
  • f new Forest

District Areas on 1/4/12

  • Completed Office

closures by 31/3/13

  • Completed

Planning Phase for business activity streams

  • Commenced

Implementation in areas such as Leisure and Tourism and Learning

  • Completed the

majority of appointments and assimilation

  • Operated new

PSS and MES arrangements

  • Operated fully

functioning new Forest District areas for 1 yr.

  • Continued

Implementation across Activity areas

  • Planned and

Implemented revised Administration Functions

  • Delivered

required FE SR10 cost savings and headcount reductions

slide-62
SLIDE 62

62 Shaping our Future – The Way Forward - May 2011

Continued transition and transformation

  • f Admin functions

SR10 Programme – FS Transition Plans

2011/12 2012/13 2013/14 2014/15

Forest Services

  • Our People
  • Our Places of Work
  • Our Ways of Working

Appoint Senior Staff (inc AD’s) by 31/10/11 Planning for Office Closure, relocation and New FS Areas (inc systems changes) Office closures and re-locations – to be completed by end March 2014 From 1/4/12 – New Forest Services Areas in operation Plan / Pilot and establish Admin Hubs by 31/3/13 Develop and Implementation New Ways of Working (inc Comms and Working Relationships) Complete further Staff Appointments and Assimilation Possible Merged Grant Scheme Operating / or EWGS Efficiencies Staff Skill Sets – Identify Requirements / Training

slide-63
SLIDE 63

63 Shaping our Future – The Way Forward - May 2011

SR10 Programme - Summary Milestone Table

Forest Services

By April 2012 We will have: By April 2013 We will have: By April 2014 We will have: By April 2015 We will have:

  • Appointed our

Senior Staff including AD’s (by 31/10/11)

  • Planned for
  • ffice closures and

relocations

  • Reviewed staff

skill sets

  • Developed the

Business Vision and Programme for New Ways of Working

  • Planned and

commenced initial implementation around Admin Hubs

  • Prepared for the

start of new FS Areas on 1/4/2012

  • Established

new Admin Hubs and working processes by 31/3/13

  • Developed staff

skill sets

  • Implemented

priority New Ways of Working

  • Completed the

majority of appointments and assimilation

  • Established

new working relationships with stakeholders

  • Completed
  • ffice closures

and relocations

  • Implemented

all SR10 New ways of working

  • Completed all

necessary additional staff training

  • Prepared for

and implemented any Grant Merger arrangements or EWGS efficiency

  • Completed

transition and transformation of Admin functions

  • Delivered

required FS SR10 cost savings and headcount reductions

  • Established

continuous improvement processes around new ways of working

  • Closed the FS

Transition programme

slide-64
SLIDE 64

64 Shaping our Future – The Way Forward - May 2011

SR10 Programme – HR Transition Plans

2011/12 2012/13 2013/14 2014/15

HR

Initial Appointments & Assimilation Staff VEE – 2011/12 On-going HR Management and Support throughout Transition Period Support subsequent Appointments and Assimilation Processes

HR

  • Completed PB1-2

and Special Posts Assimilation (by 16/9/11)

  • Completed PB1-2

and Special Posts Appointments (by 31/10/11)

  • Completed PB3 and

below Assimilation (by 31/12/11)

  • Completed PB3 and

below Appointments by 31/3/12)

  • Completed 2011/12

VEE

  • Delivered on-going

HR support to business transition teams Managed on-going appointments and assimilation processes

  • Delivered on-going

HR support to business transition teams

  • Managed on-going

appointments and assimilation processes

  • Completed all

appointments and assimilations By April 2012 We will have: By April 2013 We will have: By April 2014 We will have: By April 2015 We will have:

slide-65
SLIDE 65

65 Shaping our Future – The Way Forward - May 2011

SR10 Programme – CS Transition Plans

2011/12 2012/13 2013/14 2014/15

Corporate Services

Deliver Local Community and Stakeholder Comms (inc Media Relations – Proactive and Reactive)) Consultation Period (End June 11) Reconfigure FS / systems to cater for FCE SR10 changes and other systems Implement SR10 changes for Finance, Comms and Secretariat in-line with Westminster changes Appoint Hd of Comms By April 2012 We will have: By April 2013 We will have: By April 2014 We will have: By April 2015 We will have:

Corporate Services (including Communications)

  • Completed the SR10

Consultation process in- line with the Westminster Stream process

  • Appointed Head of

Comms

  • Reconfigured systems

(especially Finance) to cater for SR10 structures

  • Managed the

communications to staff and stakeholders around the SR10 plans

  • Developed a new

Communications Strategy

  • Continued to

implement staff and cost savings in line with SR10 plans

  • Developed support

tools to help staff manage stakeholder communications

  • Continued to

implement staff and cost savings in line with SR10 plans

  • Provided Proactive

and Reactive communications to internal and external stakeholders

  • Delivered required

CS SR10 cost savings and headcount reductions

  • Provided Proactive

and Reactive communications to internal and external stakeholders

slide-66
SLIDE 66

66 Shaping our Future – The Way Forward - May 2011

  • Aim to establish new units from April 2012
  • Voluntary Early Exit Scheme will run in June
  • The ongoing workstreams will report at the

end of September.

  • Consultation on Corporate and Shared

Services is still to begin

  • (Communications, Executive office, HR & finance)

Key Stages

slide-67
SLIDE 67

67 Shaping our Future – The Way Forward - May 2011

Please Remember!

  • FC is a successful organisation, delivering a wide

range of benefits – but we are facing unprecedented change

  • We are re-shaping our organisation so that we are

fit for the future - your input has helped us to improve our plans – thank you

  • We welcome and need your ongoing participation in

shaping our new ways of working

  • We appreciate everyone's ongoing hard work and

your commitment

  • We will keep you informed of the progress.