September 10, 2019 Public Information Meeting S-27 275-6(1052) N - - PowerPoint PPT Presentation

september 10 2019 public information meeting
SMART_READER_LITE
LIVE PREVIEW

September 10, 2019 Public Information Meeting S-27 275-6(1052) N - - PowerPoint PPT Presentation

S-27 275-6(1052) N Norfolk Wisner; C ; C.N .N. 3 . 32319 September 10, 2019 Public Information Meeting S-27 275-6(1052) N Norfolk Wisner; C ; C.N .N. 3 . 32319 PROJECT LOCATION S-27 275-6(1052) N Norfolk Wisner; C ; C.N


slide-1
SLIDE 1

September 10, 2019 Public Information Meeting

S-27 275-6(1052) N Norfolk – Wisner; C ; C.N .N. 3 . 32319

slide-2
SLIDE 2

PROJECT LOCATION

S-27 275-6(1052) N Norfolk – Wisner; C ; C.N .N. 3 . 32319

slide-3
SLIDE 3

SCHEDULE & COST

  • Development of preliminary engineering and

environmental activities.

  • NDOT has applied for additional federal

funding through a BUILD Grant.

  • Project costs are estimated at $63 million.

S-27 275-6(1052) N Norfolk – Wisner; C ; C.N .N. 3 . 32319

slide-4
SLIDE 4

PROJECT PURPOSE

  • Fulfill legislative intent to continue development of the expressway

system identified in the 1988 Nebraska Highway Needs Study.

  • Improve regional connectivity for vehicles in northeast Nebraska,

including commercial vehicles, by providing important expressway connections with Nebraska Highway 57 (N-57), N-15 & N-51, while maintaining convenient highway access for communities within the area.

  • Reduce the annual corridor delay of 477,300 vehicle hours between

Norfolk and Wisner, which is expected to worsen as traffic volumes increase in this area.

  • Maximize use of existing transportation infrastructure, including

connecting highways, and existing right-of-way (ROW) and improve the reliability and condition of existing facilities.

S-27 275-6(1052) N Norfolk – Wisner; C ; C.N .N. 3 . 32319

slide-5
SLIDE 5

2 PLUS 2 APPROACH

Criteria

  • Existing lanes

§ Remain in place § Asset preservation § Resurface

  • New lanes

§ Offset of existing § New & Reconstruction Standards

Goals

  • Stay consistent with 2+2

concept

  • Minimize impacts to

existing lanes § Analyze and balance the system

S-27 275-6(1052) N Norfolk – Wisner; C ; C.N .N. 3 . 32319

slide-6
SLIDE 6

SCOPE OF WORK

S-27 275-6(1052) N Norfolk – Wisner; C ; C.N .N. 3 . 32319

slide-7
SLIDE 7

TYPICAL SECTION

S-27 275-6(1052) N Norfolk – Wisner; C ; C.N .N. 3 . 32319

slide-8
SLIDE 8

ALTERNATIVES

S-27 275-6(1052) N Norfolk – Wisner; C ; C.N .N. 3 . 32319 Design modifications during preliminary engineering may be required to avoid impacting resources.

slide-9
SLIDE 9

ALTERNATIVES

S-27 275-6(1052) N Norfolk – Wisner; C ; C.N .N. 3 . 32319

Design modifications during preliminary engineering may be required to avoid impacting resources.

slide-10
SLIDE 10

ALTERNATIVES

S-27 275-6(1052) N Norfolk – Wisner; C ; C.N .N. 3 . 32319

Design modifications during preliminary engineering may be required to avoid impacting resources.

slide-11
SLIDE 11

ALTERNATIVES

S-27 275-6(1052) N Norfolk – Wisner; C ; C.N .N. 3 . 32319

Design modifications during preliminary engineering may be required to avoid impacting resources.

slide-12
SLIDE 12

FEEDBACK

https://dot.nebraska.gov/projects/ Questions or comments should be submitted by September 25, 2019 to:

Sarah Soula Public Involvement Manager Nebraska Department of Transportation PO Box 94759 Lincoln, NE 68509-4759 Sarah.soula@Nebraska.gov Tel (402) 479-4871

S-27 275-6(1052) N Norfolk – Wisner; C ; C.N .N. 3 . 32319

slide-13
SLIDE 13

THANK YOU!

S-27 275-6(1052) N Norfolk – Wisner; C ; C.N .N. 3 . 32319 S-27 275-6(1052) N Norfolk – Wisner; C ; C.N .N. 3 . 32319