  2. S-27 275-6(1052) N Norfolk – Wisner; C ; C.N .N. 3 . 32319 PROJECT LOCATION

  3. S-27 275-6(1052) N Norfolk – Wisner; C ; C.N .N. 3 . 32319 SCHEDULE & COST • Development of preliminary engineering and environmental activities. • NDOT has applied for additional federal funding through a BUILD Grant. • Project costs are estimated at $63 million.

  4. S-27 275-6(1052) N Norfolk – Wisner; C ; C.N .N. 3 . 32319 PROJECT PURPOSE • Fulfill legislative intent to continue development of the expressway system identified in the 1988 Nebraska Highway Needs Study. • Improve regional connectivity for vehicles in northeast Nebraska, including commercial vehicles, by providing important expressway connections with Nebraska Highway 57 (N-57), N-15 & N-51, while maintaining convenient highway access for communities within the area. • Reduce the annual corridor delay of 477,300 vehicle hours between Norfolk and Wisner, which is expected to worsen as traffic volumes increase in this area. • Maximize use of existing transportation infrastructure , including connecting highways, and existing right-of-way (ROW) and improve the reliability and condition of existing facilities.

  5. S-27 275-6(1052) N Norfolk – Wisner; C ; C.N .N. 3 . 32319 2 PLUS 2 APPROACH Goals Criteria • Stay consistent with 2+2 • Existing lanes concept § Remain in place • Minimize impacts to § Asset preservation existing lanes § Resurface § Analyze and balance • New lanes the system § Offset of existing § New & Reconstruction Standards

  6. S-27 275-6(1052) N Norfolk – Wisner; C ; C.N .N. 3 . 32319 SCOPE OF WORK

  7. S-27 275-6(1052) N Norfolk – Wisner; C ; C.N .N. 3 . 32319 TYPICAL SECTION

  8. S-27 275-6(1052) N Norfolk – Wisner; C ; C.N .N. 3 . 32319 ALTERNATIVES Design modifications during preliminary engineering may be required to avoid impacting resources.

  9. S-27 275-6(1052) N Norfolk – Wisner; C ; C.N .N. 3 . 32319 ALTERNATIVES Design modifications during preliminary engineering may be required to avoid impacting resources.

  10. S-27 275-6(1052) N Norfolk – Wisner; C ; C.N .N. 3 . 32319 ALTERNATIVES Design modifications during preliminary engineering may be required to avoid impacting resources.

  11. S-27 275-6(1052) N Norfolk – Wisner; C ; C.N .N. 3 . 32319 ALTERNATIVES Design modifications during preliminary engineering may be required to avoid impacting resources.

  12. S-27 275-6(1052) N Norfolk – Wisner; C ; C.N .N. 3 . 32319 FEEDBACK https://dot.nebraska.gov/projects/ Questions or comments should be submitted by September 25, 2019 to: Sarah Soula Public Involvement Manager Nebraska Department of Transportation PO Box 94759 Lincoln, NE 68509-4759 Sarah.soula@Nebraska.gov Tel (402) 479-4871

  13. S-27 275-6(1052) N Norfolk – Wisner; C ; C.N .N. 3 . 32319 THANK YOU! S-27 275-6(1052) N Norfolk – Wisner; C ; C.N .N. 3 . 32319

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend