This is the type of fuel tank that will be required for the Emergency Generator at M ain St. However, certain features will be different than shown: 1. The Tank can be painted green to match its surroundings 2. The fuel lines will be buried. 3. The dimensions will be different. In order to fit in the location identified in drawings the tank will be 10’ x 6’ and 7’ tall. There is an existing transformer adjacent to the location that is already green and 7’ tall.
SLIDE 4
Existing transformer height is about equal to the fuel tank and existing screening is slightly taller. Approximate Location of Fuel Tank. Note that the Portofino has installed screening around the location in addition to the large ivy wall.
SLIDE 5
No bay views would be blocked as desired by BCDC. No beach or boardwalk access would be impacted. No parking spaces would be impacted.
SLIDE 6
Approximate Location Tank is 6’ x 10’ and 7’ tall.
SLIDE 7
SLIDE 8
SLIDE 9
Existing Control Panel Existing panel is close to the same height as new panel but several feet wider. Existing Panel Dimensions Including wood enclosure: 3’ 9” Tall 14’ wide 3’ Deep Access to deteriorated dock is unsafe. Operators are required to inspect the station 3 times a week.
SLIDE 10
Approximate location of new Control Panel The new panel will be slightly smaller than the existing panel. 3 or 4 bollards will be placed in front of the panel similar to the PG&E meter adjacent to it. Consequently, Parking spaces would remain substantially the same. Operators access the station for about 30 minutes 3 times a week and do not require parking spaces. Existing Panel New Panel Height 3’ 9” 4’ Width 14’ 10’ Depth 3’ 2’ 6”