sanfo1
play

Sanfo1 Current Science Program LUX - Large Underground Xenon - PDF document

SURF - Sept. 2012 presentation Friday, January 18, 2013 3:57 PM Sanfo1 Current Science Program LUX - Large Underground Xenon Experiment (Dark Matter Search) - Direct search for WIMPs using 350 kg xenon within ultra-pure titanium cryosta -


  1. SURF - Sept. 2012 presentation Friday, January 18, 2013 3:57 PM Sanfo1

  2. Current Science Program • LUX - Large Underground Xenon Experiment (Dark Matter Search) - Direct search for WIMPs using 350 kg xenon within ultra-pure titanium cryosta - Surface Laboratory checkout activities to exercise procedures, test installation and detector operations just wrapping up for transition to Davis Campus MJD - MAJORANA DEMONSTRATOR (Neutrinoless Double Beta Decay) - Investigate neutrinoless double beta decay using 40 kg Ge in two cryostats (start with natural Ge, add up to 30 kg enriched 76 Ge) - Electroforming copper for detector shielding on 4850L - Will deploy detector in Davis Campus; Experiment is a pathfinder for 1-tonne scale • Biology, Geology, Engineering (BGE) experiments operational at SURF - Program of characterization (including physics): Biology sampling, seismic/ frequency, microclimate, physics backgrounds - Includes Center for Ultralow Background Experiments in the Dakotas (CUBED (EPSCoR/SD) experiment planned for installation in the Davis Campus

  3. Extending the life of the lab We have current proposals in to the NSF & DOE; • DIANA (Nuclear astrophysics) would run 2015 through 2022 +. • LZ (2 nd generation Dark Matter) would run from 2015 through 2022. • Low Background Counting Facility would run throughout all experiments. • LBNE (Long Baseline Neutrino Experiment) would run from 2016 through 2040 • Reengaging the NSF for Geology, Biology and other experiments ..

  4. Temporary CINn Room (Coppe, eiec:lrolomwlg)

  5. LBNE Far Site Detector at Sanford Lab schedule • Schedule Summary Overview Jan-10 Jun-23 Jan-13 Mar-16 Apr•17 CO.() CD-4 CD·1 CD-2/3a CD-3b Approve Approve Sta Approve Approve Approve Start Mi ssion Need Operation Alternate Performance of Project Com1 Selection & Cost Baseline / Long Construction Ral')ge Lead lt(lm Procurement Conceptual Design Geotechnical Investigation ___ _, Preliminary Design ___ Final Design Construction FY10 FY11 FY12 FY13 FY14 FY15 FY16 FY17 FY18 FY19 FY20 FY21 LAr Beneficial Occupancy

  6. Ross shaft steel replacement ..

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend