SALT LAKE CITY AIRPORT 10,000 LIGHT FIXTURES WHICH INCLUDES OVER - PowerPoint PPT Presentation

SALT LAKE CITY AIRPORT 10,000 LIGHT FIXTURES WHICH INCLUDES OVER 17,000 LAMPS 9 SMGCS CONTROLLABLE STOP-BAR INTERSECTIONS 450 MILES OF UNDERGROUND CABLE 150 CONSTANT CURRENT REGULATORS 20 CIRCUIT SELECTOR SWITCHES 1000


  1. SALT LAKE CITY AIRPORT 10,000 LIGHT FIXTURES WHICH INCLUDES OVER 17,000 LAMPS 9 SMGCS CONTROLLABLE STOP-BAR INTERSECTIONS 450 MILES OF UNDERGROUND CABLE 150 CONSTANT CURRENT REGULATORS 20 CIRCUIT SELECTOR SWITCHES 1000 ADDRESSABLE LIGHTING CONTROL UNITS ( BRITE, AGLAS) 3 MAIN LIGHTING VAULTS 8 WIND CONES 6 4 BOX PAPI’S 1 AIRPORT BEACON 450 AIRFIELD SIGNS 3 ROAMING MAINTENANCE LAPTOP

  2. TVA AND SVRA SOUTH VALLEY REGIONAL AIRPORT TOOELE VALLEY AIRPORT 354 LIGHT FIXTURES 543 LIGHT FIXTURES 3 CONSTANT CURRENT REGULATORS 3 CONSTANT CURRENT REGULATORS PAPI’S PAPI’s REIL LIGHTS REIL LIGHTS ROTATING BEACON ROTATING BEACON WIND-CONES WIND-CONES LIGHTING VAULT LIGHTING VAULT

  3. EARLY AVIONIC LIGHTING HISTORY WHERE IT STARTED

  4. EARLY AVIONIC LIGHTING HISTORY WHERE IT STARTED

  5. EARLY AVIONIC LIGHTING HISTORY WHERE IT STARTED

  6. EARLY AVIONIC LIGHTING HISTORY WHERE IT STARTED

  7. EARLY AVIONIC LIGHTING HISTORY WHERE IT STARTED • Early emergency landing strips were marked with smudge pots

  8. TODAY’S LIGHTING FIXTURES

  9. PROGRESS OF LIGHTING SOURCE • Early years of runway lighting were accomplished with Incandescent lamps with filter for color • Then came quarts lamps • Longer lamp life but still using filters for color • More control of focus • Today the industry is moving towards LED • Longer Lamp life • Truer color quality at all levels of intensity • Cost of fixtures

  10. SCIENCE OF PHOTOMETRIC • Color • Configuration • Candela • Coverage

  11. PHOTOMETRIC TESTING: COLOR

  12. PHOTOMETRIC TESTING: COLOR

  13. PHOTOMETRIC TESTING: CONFIGURATION

  14. PHOTOMETRIC TESTING: CANDELA

  15. PHOTOMETRIC TESTING: COVERAGE

  16. PAST PHOTOMETRIC TESTING AT SLC • New construction commissioning • Annual testing • Run to fail • Rebuild fixture without photometric testing • Reinstall of fixture in the field and run to fail

  17. TODAYS TESTING • Post Construction Commissioning • Summer months we test monthly • Weather affects • Chemicals • Need for cleaning

  18. TODAY’S TESTING

  19. TODAY’S TESTING

  20. TODAY’S TESTING

  21. BENCH TEST OF ALL NEW AND REBUILT FIXTURES • Lessons learned • Prisms have become the new “weak link” in fixture performance • Lamp focusing problems • Prism and Light source alignment • New fixture Testing

  22. TODAY’S TESTING

  23. TODAY’S TESTING

  24. TODAY’S TESTING

  25. TODAY’S TESTING

  26. TODAY’S TESTING

  27. AIRFIELD TESTING LESSONS LEARNED • New fixture do not always meet standards • New fixtures can develop problems at initial running • New fixtures are not always assembled correctly from the manufacturer • Fixtures can be installed too high and too low • Azimuth or plumb incorrect

  28. TODAY’S TESTING

  29. TODAY’S TESTING

  30. CLOSING • Overall performance of our airfield lighting has greatly improved with the use of Photometric Test Equipment.

  31. QUESTIONS?

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.