Route 15 Congestion Report Improvements Board of Supervisors - - PowerPoint PPT Presentation

Route 15 Congestion Report Improvements Board of Supervisors Business Meeting September 20, 2018 Decision Points Widening: Yes or No; and if Yes, limits of widening Intersection Improvement(s): North King Street Whites Ferry


slide-1
SLIDE 1

Route 15 Congestion Report Improvements

Board of Supervisors Business Meeting September 20, 2018

slide-2
SLIDE 2

Decision Points

  • Widening: Yes or No; and if Yes, limits of widening
  • Intersection Improvement(s):
  • North King Street
  • Whites Ferry Road/Raspberry Drive
  • Montresor Road
  • Limestone School Road: Should the road be realigned to connect

to Route 15 at Montresor Road?

  • Context Sensitive Design features
slide-3
SLIDE 3

Extent of Widening on Route 15

Battlefield Parkway to 2,000 feet north of Whites Ferry Road Battlefield Parkway to Montresor Road

slide-4
SLIDE 4

Flyover Ramp

Route 15/North King Street Intersection Options

Continuous Green-T Intersection

slide-5
SLIDE 5

Route 15/Whites Ferry Road/Raspberry Drive

New signal to accommodate 4-lane median divided roadway

slide-6
SLIDE 6

Route 15/Whites Ferry Road/Raspberry Drive

Two lane roundabout

slide-7
SLIDE 7

Route 15/Whites Ferry Road/Raspberry Drive

Bow tie roundabout

slide-8
SLIDE 8

Realignment of Limestone School Road to Connect with Montresor Road with 2-lane Roundabout

LIMESTONE SCHOOL ROAD EXISTING CONNECTION TO ROUTE 15 PROPOSED REALIGNMENT OF LIMESTONE SCHOOL ROAD TO CONNECT AT MONTRESOR ROAD

slide-9
SLIDE 9

Context Sensitive Design Features

 Collaborative involvement during the Design Process  Roadway features such as:

  • Landscaping
  • Stone face walls
  • Fencing
  • Textured painted paved shoulders
slide-10
SLIDE 10

Staff Recommendations

  • 1. Widening: from Battlefield Parkway NE and Montresor Road, 4 lane

median divided

  • 2. North King Street: Continuous Green-T Intersection
  • 3. Whites Ferry Road: Replace existing traffic signal with a new signal to

accommodate 4-lane median divided roadway

  • 4. Montresor Road: Realign Limestone School Road to connect to Route 15

at Montresor Road

  • 5. Montresor Road: 2-Lane roundabout
  • 6. Incorporate context sensitive design methodology and the Journey

Through Hallowed Ground’s design guidelines where feasible