Report on Feasibility Assessment and Proposed Consolidation Agreement Maumelle Water Management September 22, 2015 Combined Average Utility Bill for 2015-2020 5/8 Meter with 4,400 Gallons 100 90 Monthly Utility Bill in $ 80 70 60 50 40
40 50 60 70 80 90 100 Sep-15 2016 2017 2018 2019 2020 Future Monthly Utility Bill in $
Combined Average Utility Bill for 2015-2020 5/8” Meter with 4,400 Gallons
Established Rates MWM Option 1 MWM Option 2
MWM’s Water System
- approximately 10,500 metered service
connections
- 613,507 linear feet of water mains
- 2 water storage tanks
- 675 fire hydrants
- 13 supply wells,
- 2 pump stations
- 1 water treatment plant
- 2.78 MGD average
- 6.68 MGD peak
- 2.4 – peaking factor
- 7.8 MGD Well Capacity
- 6.84 MGD Treatment Capacity
MWM’s Wastewater System
- approximately 7,500 service
connections
- 621,000 linear feet of collection
mains
- 3,100 manholes
- 25 pump stations
- 1 wastewater treatment plant
- 2.08 MGD average
- 2.80 MGD max
- 3.50 MGD Permitted Treatment
Capacity
Project Description Estimated Cost Manitou Booster Pump Station $500,000 Ground Storage Tank #1 & #2 Maintenance $1,200,000 New 2.5 MG Storage Tank $3,000,000 Flushing System $150,000 Water Transmission Improvements $5,500,000 WTP Residual Handling $1,000,000 New Wells (4) $800,000 Emergency Generators & Platforms for 5 Wells $425,000 Expansion of WTP to 12 MGD $22,250,000 Meter Replacement $888,000 Permanent Chlorine Dioxide Feed System $25,000 Entergy Power Distribution in Well Field TBD Future Improvements Required for Water Quality TBD Total Estimated Cost $35,738,000
Feasibility Assessment
Water PER Projects without Consolidation
Project Description Estimated Cost Sewer Rehabilitation $2,370,000 WWTP Expansion $10,000,000 Mechanical Bar Screen $750,000 Aeration Improvements $600,000 WWTP Blower $100,000 Rehabilitate Secondary Clarifier $50,000 Sludge Dewatering Container $150,000 Disinfection System $200,000 Effluent Pump Station $500,000 WTP Residuals Disposal $2,000,000 Total Estimated Cost $16,720,000
Feasibility Assessment
Wastewater PER Projects without Consolidation
CAW’s Water System
- Over 125,000 metered service
connections
- 12,144,000 linear feet of water mains
- 27 water storage tanks
- 14,870 fire hydrants
- 2 water supply lakes
- 26 pump stations
- 2 water treatment plants
- 62 MGD average
- 126 MGD peak
- 2.06 – peaking factor
- 121 MGD Lake Capacity
- 153 MGD Treatment Capacity
MWM’s Water System
- Approximately 10,500 metered service
connections
- 613,507 linear feet of water mains
- 2 water storage tanks
- 675 fire hydrants
- 13 supply wells,
- 2 pump stations
- 1 water treatment plant
- 2.78 MGD average
- 6.68 MGD peak
- 2.4 – peaking factor
- 7.8 MGD Well Capacity
- 6.84 MGD Treatment Capacity
System Comparisons
CAW Service Territory
Project Description Budget Estimate Implementation Manitou Booster Pump Station $500,000 12 months Ground Storage Tank #1 & #2 Maintenance $1,200,000 8 months Flushing System $150,000 6 months Distribution System Improvements $71,000 6 months 30” CAW Transmission Main $8,320,000 24 months New High Service Pump at Jack Wilson $375,000 8 months Meter Replacement $888,000 48 months Permanent Chlorine Dioxide Feed System $25,000 12 months Total Budget $11,529,000 24 Months
Feasibility Assessment
Water PER Projects with CAW Consolidation
Feasibility Assessment
Water Consolidation Connection Location
CAW Transmission System
CAW Distribution System
CAW Water Sources
Description Budget Estimate Source of Funds
Transition Costs Intermediate Debt Long Term Debt
Manitou Booster Pump Station
$500,000
X Ground Storage Tank #1 & #2 Maintenance
$1,200,000
X Flushing System
$150,000
X Distribution System Improvements
$71,000
X 30” CAW Transmission Main
$8,320,000
X New High Service Pump at Jack Wilson
$375,000
X Meter Replacement
$888,000
X Chlorine Dioxide Feed System
$25,000 X
Feasibility Assessment
Water PER Projects with CAW Consolidation
Cost Description Estimated Costs Decommissioning of Existing Water Plant & Wells
$300,000
Information Services Transition
$50,000
GIS Mapping
$360,000
Property Transfers
$2,500
Increased Payroll/Benefits during first 2 years
$400,000
Billing Modifications to enQuesta
$135,000
Immediate Transition Costs (rolling stock, computers, telephone system, rebranding, outfitting employees)
$150,000
Connect to CAW SCADA
$50,000
Banking Transition
$15,000
Health Insurance Transition Costs
TBD
Feasibility Assessment
CAW Consolidation - Other Transition Costs
Project Description Estimated Cost Sewer Rehabilitation $2,370,000 Mechanical Bar Screen $750,000 Aeration Improvements $600,000 WWTP Blower $100,000 Rehabilitate Secondary Clarifier $50,000 Sludge Dewatering Container $150,000 Disinfection System $200,000 Effluent Pump Station $500,000 WTP Residuals Disposal $2,000,000 Total Estimated Cost $6,720,000
Feasibility Assessment
Wastewater PER Projects with NLRWW Consolidation
2 4 6 8 10 12 14 16 18 20 Monthly Surcharge in $
Monthly Surcharge Comparison 2014 – 2047 5/8” Meter
Existing MWM Combined Option 1 MWM Combined Option 2
MWM Existing Debt Schedule
Debt Issue Total
ASWCC #1 $3,331,531.97 ASWCC #2 $1,035,358.57 2002 Lease Purchase $2,047,492.58 Series 2005 $3,017,404.36 Series 2008 $1,859,928.30 Total $11,291,715.78
MWM Existing Debt Schedule
Debt Issue Total
ASWCC #1 $3,331,531.97 ASWCC #2 $1,035,358.57 2002 Lease Purchase $2,047,492.58 Series 2005 $3,017,404.36 Series 2008 $1,859,928.30 Total $11,291,715.78 ASWCC #1 Clarifier Aerator Water Filters (4) 2.4 MG Storage Tank 3 Wells (6, 7, & 8) SCADA
ASWCC #2 Water Plant Imp. 2 Wells (9 & 10) Waste lime pond Lift Station 4 Imp. Raw Water Booster Pump
MWM Existing Debt Schedule
Debt Issue Total
ASWCC #1 $3,331,531.97 ASWCC #2 $1,035,358.57 2002 Lease Purchase $2,047,492.58 Series 2005 $3,017,404.36 Series 2008 $1,859,928.30 Total $11,291,715.78
2002 Lease Purchase Surge Basin Imp. Surge Basin Lift Station Levee Improvements Well Field Generators Office Building Water Meters
MWM Existing Debt Schedule
Debt Issue Total
ASWCC #1 $3,331,531.97 ASWCC #2 $1,035,358.57 2002 Lease Purchase $2,047,492.58 Series 2005 $3,017,404.36 Series 2008 $1,859,928.30 Total $11,291,715.78
Series 2005 Bonds - Wastewater Improvements:
Clarifier Yard piping & pumping improvements Lift Station #2 rehab Chlorination facility Dechlorination facility SCADA/Telemetry Equipment storage building Outfall line (discharge to river) Lift Station #4 rehab Engineering costs
MWM Existing Debt Schedule
Debt Issue Total
ASWCC #1 $3,331,531.97 ASWCC #2 $1,035,358.57 2002 Lease Purchase $2,047,492.58 Series 2005 $3,017,404.36 Series 2008 $1,859,928.30 Total $11,291,715.78
Series 2005 Bonds - Water Improvements
Well field fencing Aerator SCADA/Telemetry rehab Filter 1 through 4 backwash valve Lime Silo Well #11 Filter 1 through 4 rehab Existing clarifier demolition New clarifier Yard Piping Equipment building Chemical Feeders
MWM Existing Debt Schedule Debt Issue Total
ASWCC #1 $3,331,531.97 ASWCC #2 $1,035,358.57 2002 Lease Purchase $2,047,492.58 Series 2005 $3,017,404.36 Series 2008 $1,859,928.30 Total $11,291,715.78
Series 2008 Bonds
Complete 2005 Projects Water Plant Elec. Rehab Wastewater Lift Station Rehab Water Plant Emergency Generator Wastewater Sludge Drying Container
MWM Existing Debt Schedule
Debt Issue Total
ASWCC #1 $3,331,531.97 ASWCC #2 $1,035,358.57 2002 Lease Purchase $2,047,492.58 Series 2005 $3,017,404.36 Series 2008 $1,859,928.30 Total $11,291,715.78
Debt Issue Total Allocated to Water Allocated to Wastewater ASWCC #1 $3,331,531.97 $3,331,531.97 ASWCC #2 $1,035,358.57 $1,035,358.57 2002 Lease Purchase $2,047,492.58 $1,740,368.69 $307,123.89 Series 2005 $3,017,404.36 $1,418,180.05 $1,599,224.31 Series 2008 $1,859,928.30 $1,320,549.09 $539,379.21 Totals $11,291,715.78 $8,845,988.37 $2,445,727.41
MWM Existing Debt Schedule
2 4 6 8 10 12 14 16 18 20 Monthly Surcharge in $
Monthly Surcharge Comparison 2014 – 2047 5/8” Meter
Existing MWM Combined Option 1 MWM Combined Option 2
Option 1 Debt Existing $11,291,715.78 + Proposed $15,625,000.00 TOTAL $26,916,715.78
2 4 6 8 10 12 14 16 18 20 Monthly Surcharge in $
Monthly Surcharge Comparison 2014 – 2047 5/8” Meter
Existing MWM Combined Option 1 MWM Combined Option 2
Option 2 Debt Existing $11,291,715.78 + Proposed $10,150,000.00 TOTAL $21,441,715.78
2 4 6 8 10 12 14 16 18 20 Monthly Surcharge in $
Monthly Surcharge Comparison 2014 – 2047 5/8” Meter
MWM Wastewater Only CAW Water NLR Wastewater
CAW Consolidation Debt Existing MWM Water $8,845,988.37 + 2-year Transition $1,637,500.00 + 10-year Intermediate $2,088,000.00 + 30-year Long-Term $9,117,128.40 TOTAL $21,688,616.77
2 4 6 8 10 12 14 16 18 20 Monthly Surcharge in $
Monthly Surcharge Comparison 2014 – 2047 5/8” Meter
MWM Wastewater Only CAW Water NLR Wastewater
MWM Wastewater Only Debt Existing MWM Wastewater $2,445,727.41 + New MWM Wastewater $4,720,000.00 TOTAL $7,165,727.41
2 4 6 8 10 12 14 16 18 20 Monthly Surcharge in $
Monthly Surcharge Comparison 2014 – 2047 5/8” Meter
Existing MWM Combined Option 1 MWM Combined Option 2 MWM Wastewater Only CAW Water NLR Wastewater
5 10 15 20 25 Monthly Surcharge in $
Monthly Surcharge Comparison 2016 – 2047 5/8” Meter
Existing Rates MWM Combined Option 1 MWM Combined Option 2 MWM Wastewater Only CAW Water NLR Wastewater MWM Water & Wastewater Capacity Expansions MWM Wastewater Only Capacity Expansions
Long-Term Water and Wastewater Capacity Debt Estimate $34,833,000.00 Long-Term Wastewater Capacity Debt Estimate $10,000,000.00
40 50 60 70 80 90 100 Sep-15 2016 2017 2018 2019 2020 Future Monthly Utility Bill in $
Combined Average Utility Bill for 2015-2020 5/8” Meter with 4,400 Gallons
Established Rates MWM Option 1 MWM Option 2
40 50 60 70 80 90 100 Sep-15 2016 2017 2018 2019 2020 Future Monthly Utility Bill in $
Combined Average Utility Bill for 2015-2020 5/8” Meter with 4,400 Gallons
Established Rates MWM Option 1 MWM Option 2 CAW/MWM
40 50 60 70 80 90 100 Sep-15 2016 2017 2018 2019 2020 Future Monthly Utility Bill in $
Combined Average Utility Bill for 2015-2020 5/8” Meter with 4,400 Gallons
Established Rates MWM Option 1 MWM Option 2 CAW/MWM CAW/NLRWW
20 25 30 35 40 45 50 55 60
Sep-15 2016 2017 2018 2019 2020 Future
Monthly Water Bill in $
Water Average Bill 2016-2020 5/8” Water Meter with 4,400 Gallons
Existing Rates CAW/MWM MWM - Option 1 MWM - Option 2 CAW/NLRWW
45 55 65 75 85 95 105 115 Sep-15 2016 2017 2018 2019 2020 Future Monthly Sprinkler Bill in $
Sprinkler Bill 2016-2020 5/8” Sprinkler Meter with 11,000 Gallons
Existing Rates CAW/MWM MWM - Option 1 MWM - Option 2 CAW/NLRWW
10 15 20 25 30 35 Sep-15 2016 2017 2018 2019 2020 Future Monthly Wastewater Bill in $
Wastewater Average Bill 2016-2020 5/8” Meter with 4,400 Gallons
MWM - Option 1 MWM - Option 2
10 15 20 25 30 35 Sep-15 2016 2017 2018 2019 2020 Future Monthly Wastewater Bill in $
Wastewater Average Bill 2016-2020 5/8” Meter with 4,400 Gallons
Existing Rates MWM - Option 1 MWM - Option 2 MWM with CAW
10 15 20 25 30 35 Sep-15 2016 2017 2018 2019 2020 Future Monthly Wastewater Bill in $
Wastewater Average Bill 2016-2020 5/8” Meter with 4,400 Gallons
Existing Rates MWM - Option 1 NLRWW MWM - Option 2 MWM with CAW
40 50 60 70 80 90 100 Sep-15 2016 2017 2018 2019 2020 Future Monthly Utility Bill in $
Combined Average Utility Bill for 2015-2020 5/8” Meter with 4,400 Gallons
Established Rates MWM Option 1 MWM Option 2 CAW/MWM CAW/NLRWW
Proposed Consolidation Agreement
- Overall Water Intent
- CAW to provide retail water
service to MWM Customers
- Definitions (Section 1)
- Wastewater (Section 2)
- If desired, CAW will negotiate
and bring MWM an offer
- December 31, 2015
Proposed Consolidation Agreement
- Purchase of Water System (Section 3)
- Closing no later than March 1, 2016
- Purchase price is the existing debt to be
pay off with new bonds
- Offer to hire employees
- Employees (Sections 3.D and 5.A)
- “Unless otherwise directed by
MWM,” CAW shall offer employment to all MWM employees
- Employees will receive compensation
and benefits that CAW provides
- Lease employees to wastewater provider if needed
- Pre-employment testing
Proposed Consolidation Agreement
- Covenants (Section 4)
- Parties will work together to
complete consolidation
- MWM will not issue debt, sell
property, etc.
- Division of Assets (Section 6)
- Parties will identify water and
wastewater assets to attach to Schedules in next couple of weeks, pending decision from MWM
- Cash will include
– Water Account Deposits – Water Accounts Payable – Employee Obligations
- Post Closing Clean-Up
Proposed Consolidation Agreement
Proposed Consolidation Agreement
- Rates (Section 5.D)
- Transition Period (24-30 months)
– MWM Existing Rates – Ends when begin supplying CAW lake water in place of Maumelle well water
Debt Amount Surcharge Transition Period $1,637,500 $7.69 Intermediate Period $2,088,000 $2.18 Long-Term Period $17,963,116.77 $9.34
- Rates (Section 5.D)
- After Transition Date
– CAW Outside City Rates – Transition Surcharge is eliminated – Intermediate Surcharge for about 8 additional years – Long-Term Surcharge for about 22 additional years – Surcharges represent high-end estimates; Actual surcharges will reflect actual costs incurred
Proposed Consolidation Agreement
Debt Amount Surcharge Intermediate Period $2,088,000 $2.18 Long-Term Period $17,963,116.77 $9.34
2 4 6 8 10 12 14 16 18 20 Monthly Surcharge in $
Monthly Surcharge Comparison 2014 – 2047 5/8” Meter
CAW Consolidation Debt Existing MWM Water $8,845,988.37 + 2-year Transition $1,637,500.00 + 10-year Intermediate $2,088,000.00 + 30-year Long-Term $9,117,128.40 TOTAL $21,688,616.77
- Post Consolidation
Operations (Sections 5.E-G)
- Completion of Transition
Improvements
- Use of Surcharge Proceeds
- Quality of Operations
- Billing Partners
Proposed Consolidation Agreement
- Addition of approximately 10,500 customer accounts
- Additional year-round revenue will help offset declining
CAW water demands
- Skilled and knowledgeable employee pool
- Relatively new system
- Additional return on capital investments throughout CAW
system
- Large customer base will help mitigate future rate
increases across entire system through additional economies of scale
Benefits to CAW of Consolidation
- Economies of scale from being part of a system with
125,000 other customer accounts
- Relatively stable rates over time
- Lower operating costs, resulting in lower rates
- Award winning utility operations
- Multiple water sources and supply lines
Benefits to MWM of Consolidation
$22.83 $28.54 $35.90 $29.54 $- $5.00 $10.00 $15.00 $20.00 $25.00 $30.00 $35.00 $40.00 CAW Existing Outside-City MWM Existing MWM Option 1 MWM Option 2
Example Water Bill Using 2015 Water Rates 5/8” Meter with 4,400 Gallons
Benefits to MWM of Consolidation
Does not include taxes and fees; MWM Bills include the water portion of the Debt Surcharge fee based on water’s proportionate share of the proposed debt.
$80.42 $80.42