Reinvesting in Urban Water Infrastructure through Combined Sewer Overflow Long Term Control Plans THURSDAY, JANUARY 8, 2015 RUTGERS UNIVERSITY NEWARK, NEW JERSEY Welcome to Hoboken A lit little ab about Ho Hoboken Population: 52,575


  1. Reinvesting in Urban Water Infrastructure through Combined Sewer Overflow Long Term Control Plans THURSDAY, JANUARY 8, 2015 RUTGERS UNIVERSITY NEWARK, NEW JERSEY

  2. Welcome to Hoboken

  3. A lit little ab about Ho Hoboken… Population: 52,575 Households: 26,855 Real Property Ratable Base: $9.7 Billion Land Area: 1.275 Square Miles

  4. Severe and Repetitive Flooding… Hurricane Irene 2011 Superstorm Sandy 2013

  5. Flood Hazard Area Landmass within Flood Zone (A): 63.85% Landmass within Flood Zone (V): 7.41% Landmass within Flood Zone (X): 7.66% Hoboken NFIP Total Liability: $1,922,187,500 Hoboken NFIP Annual Premiums: $5,984,720

  6. Lack of Parks and Green Space… Master Plan Reexamination Report 2010

  7. Combined Sewer Overflows… Public demand for parks, recreation and access to the Hudson River waterfront

  8. Form Partnerships… North Hudson Sewerage Emnet Report 2011 Authority (Sewer Atlas)

  9. Leverage Resources… Mayor’s Institute on Columbia University City Design 2011 Research Project 2012

  10. Green Infrastructure Strategic Plan 2013 Special Thanks to: Together North Jersey

  11. Green Infrastructure BMPs  Constructed Wetlands  Permeable Pavements  Stormwater Tree pits  Vegetated Swales  Rainwater Harvest/Reuse  Basins or Ponds Green  Raingardens Infrastructure  Stormwater Infiltration Planters  Subsurface Storage  Greenroofs

  12. Hoboken City Hall Sustainable Stormwater Demonstration Pilot Project Special Thanks to: Rutgers University Low Interest Loan Application pending Center for Urban Environmental before the NJ Environmental Sustainability (CUES) Infrastructure Trust Estimated Cost: $300,000

  13. Rain Garden Curb Extensions Special Thanks to: Sustainable Jersey and Rutgers University Estimated Cost: $10,000 per intersection Washington Street Redesign and Frank Sinatra Drive Redesign

  14. Hoboken Block 12 Southwest Park Low Interest Loan Application LOI to Special Thanks to: the NJ Environmental Infrastructure Hudson County Open Space Trust Fund and National Fish and Wildlife Foundation Trust Fund Estimated Price: TBD

  15. Hoboken (BASF) Resiliency Park Rotterdam Museumpark, NL Special Thanks to:  Rockefeller Foundation,  Re.Invest Initiative, and  Refocus Partners Low Interest Loan LOI Application pending before the NJ Environmental Infrastructure Trust Fund. Estimated Price: TBD

  16. Rebuild By Design

  17. Stephen D. Marks @SDMarksNJ

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.