Real Estate Portfolio Optimization Midpoint Presentation Monday - - PowerPoint PPT Presentation

real estate portfolio optimization
SMART_READER_LITE
LIVE PREVIEW

Real Estate Portfolio Optimization Midpoint Presentation Monday - - PowerPoint PPT Presentation

Real Estate Portfolio Optimization Midpoint Presentation Monday March 4, 2019 Iowa State University Senior Design ARIN: Analytics Research Intelligence Network analytics@scale Classification: Company Confidential The Team Blake Kevin


slide-1
SLIDE 1

Classification: Company Confidential

ARIN: Analytics Research Intelligence Network analytics@scale

Real Estate Portfolio Optimization

Midpoint Presentation

Monday March 4, 2019

Iowa State University

Senior Design

slide-2
SLIDE 2

Classification: Company Confidential

Leelabari Fulbel

Meeting Facilitator / Frontend Software Engineering

Colton Goode

Meeting Scribe / Backend Computer Engineering, Management of Information Systems

Blake Roberts

Project Lead / Backend Software Engineering

Kevin Johnson

Quality Control / Frontend Computer Engineering

Nickolas Moeller

Report Manager / Backend Software Engineering

The Team

Classification: Company Confidential

2

slide-3
SLIDE 3

Classification: Company Confidential

Gather requirements. Master the real estate domain and portfolio

  • ptimization.

Design the system and create a working prototype. Test, iterate, and report out.

Bottom Line Up Front

Our mission is to design and develop a portfolio optimization system that meets the unique needs of a commercial real estate portfolio manager.

BLUF

Project Scope

1

3

2 3

slide-4
SLIDE 4

Classification: Company Confidential

Intro to Portfolio Optimization

Agenda

The Problem and Plan Demonstration Next Steps

Classification: Company Confidential

4

slide-5
SLIDE 5

Classification: Company Confidential

Intro to Portfolio Optimization

Agenda

The Problem and Plan Demonstration Next Steps

Classification: Company Confidential

5

slide-6
SLIDE 6

Classification: Company Confidential

Compare thousands of runs to identify the best strategies

6

Define Constraints Calculate Inputs Optimize Local Knowledge

Portfolio optimization requires estimates of expected return and the asset covariance matrix Allow the user to express their beliefs about a given asset, market, lifecycle, or property type The user defines portfolio constraints. e.g. The portfolio’s allocation to NYC must be 35-40%

Portfolio Optimization

1 2 4 3

Algorithm searches for the mixture of assets that minimizes

  • r maximizes the objective

function (e.g. risk-adjusted return)

slide-7
SLIDE 7

Classification: Company Confidential 7

Balancing Risk & Reward

Help PMs efficiently allocate capital and reduce portfolio risk

slide-8
SLIDE 8

Classification: Company Confidential

Intro to Portfolio Optimization

Agenda

The Problem and Plan

Demonstration Next Steps

8

slide-9
SLIDE 9

No portfolio optimization currently being done in house Market level data analysis is outsourced

  • Costar is expensive, slow, and

uncustomizable

The Problem

A Software that enables PM’s to optimize and compare their portfolios in real time Control data visuals through Microsoft’s Power BI

The Solution

9 Classification: Company Confidential

slide-10
SLIDE 10

Classification: Company Confidential

System Block Diagram

10

slide-11
SLIDE 11

Dash

  • callbacks limit UI

possibilities

  • can’t use JQuery
  • difficult to use

JavaScript Modern Portfolio Theory Markowitz Optimization Dash UI/UX Power BI Integration

Strengths Weaknesses Challenges

Quality of Approach

11 Classification: Company Confidential

slide-12
SLIDE 12

Classification: Company Confidential

Intro to Portfolio Optimization

Agenda

The Problem and Plan

Demonstration

Next Steps

12

slide-13
SLIDE 13

Classification: Company Confidential

App Demo

Classification: Company Confidential

slide-14
SLIDE 14

Classification: Company Confidential

Intro to Portfolio Optimization

Agenda

The Problem and Plan Demonstration

Next Steps

14

slide-15
SLIDE 15

Optimization results need be sent to Power BI for visualization Iterate Power BI dashboard design Iterate web application interface design Document code and procedures Deliver all project materials to the Principal Data Science team

Real Time Results UI Iteration and User Testing Documentation and Handoff

Next Steps

15 Classification: Company Confidential

slide-16
SLIDE 16

Classification: Company Confidential

Project Timeline

Sometimes you will want to use a subtitle​

April 1st, 2019 Connect database to dashboard

Update the dashboard automatically with newly formed optimization data

March 11th, 2019 Authentication

Automatic authentication so anyone can view the

  • ptimization results

March 4th, 2019 Current progress

Perform optimization with constraints Embed a Power BI dashboard

April 29th, 2019 - May 3rd, 2019 Semester and Project End May 9th, 2019 Final Presentation

ISU CPRE 492 requirement

16

slide-17
SLIDE 17

Classification: Company Confidential

Thank You – Questions?

Classification: Company Confidential