Re Requ quest st for Pr Propo posals sals 20 2017 17 Sele - - PowerPoint PPT Presentation

re requ quest st for pr propo posals sals 20 2017 17 sele
SMART_READER_LITE
LIVE PREVIEW

Re Requ quest st for Pr Propo posals sals 20 2017 17 Sele - - PowerPoint PPT Presentation

Ge Gene neral ral En Engine neerin ering g Co Cons nsul ulta tant nt Re Requ quest st for Pr Propo posals sals 20 2017 17 Sele lection ction Committee mmittee Theresa Simmons, PE (Operations/Engineering) Jim Madison


slide-1
SLIDE 1

Ge Gene neral ral En Engine neerin ering g Co Cons nsul ulta tant nt Re Requ quest st for Pr Propo posals sals 20 2017 17

slide-2
SLIDE 2

Sele lection ction Committee mmittee

  • Theresa Simmons, PE (Operations/Engineering)
  • Jim Madison (Finance)
  • Paula Watson (Procurement & Audit)
slide-3
SLIDE 3

RMT MTA O Ove vervi rview ew

  • Political subdivision of the Commonwealth of Virginia
  • Created in 1966 to improve mobility within the Richmond

Region

  • 2014 – Legislative name change to RMTA from RMA
  • Governed by a Board of Directors
  • 5 – City of Richmond
  • 5 – Henrico
  • 5 – Chesterfield
  • 1 – Commonwealth Transportation Board
  • Self-supporting through toll revenue
  • Expressway System
  • ≈ 7.0 miles
  • ≈ 51.2 lane-miles
  • 36 bridges (5 RR bridges)
  • 2 culverts
slide-4
SLIDE 4

Existing Roadway System 7 miles long 50 lane miles A part of the Federal NHS 31 Highway Bridges & 5 RR

slide-5
SLIDE 5

RMT MTA Toll ll System em Repl placement acement

Scope e of Servic ices es Dedicated Toll System Project Manager Construction administration & project management Toll system design, integration & installation review & coordination Toll system testing

  • versight for traditional

& ORT systems Systems transition

  • versight between

integrators and VDOT CSC

slide-6
SLIDE 6

RMT MTA Toll ll Road d Faci cilities lities

Scope e of Servic ices es Structural & highway design Architectural services Facility inspections and reports Environmental services Strategic planning

slide-7
SLIDE 7

RMTA Toll ll Road Inspections ections

  • Pavement, shoulder and curb conditions
  • Culverts and other drainage structures
  • Grading, slopes and landscaping
  • Roadway and sign lighting
  • Signing and sign structures
  • Pavement markings
  • ROW Fencing
  • Guardrail and impact attenuators
  • Toll plazas and administration facilities
  • Bridges
slide-8
SLIDE 8

RMT MTA Bri ridg dge e In Inspecti pections

  • ns
  • All 36 bridges are inspected on a biannual basis
  • 8 bridges contain fracture critical members that must be inspected on

a yearly basis

  • 14 bridges require element level inspections
  • 9 bridges require CSX and/or NS Entry Agreements
  • Ability to secure agreements before inspections begin is mandatory (July

2017)

  • 4 bridges contain submerged elements which are inspected every 5

years

  • A portion of submerged elements on 1 bridge is inspected every 2

years due to existing cracking

  • All bridge safety inspection reports shall be submitted by the GEC on

behalf of the RMTA to VDOT upon completion

slide-9
SLIDE 9

Typical Bridge Inspection Pictures

slide-10
SLIDE 10

Up Upda dating ing Capi pital tal Im Improv provemen ement t Pro rogram ram

  • 1. Inspection and Evaluation
  • 2. Prioritize
  • 3. Estimate
  • 4. Schedule
slide-11
SLIDE 11

Typical Capital Improvements

  • 1. Maintenance/Repair
  • Steel Protective Coatings
  • Annual Maint/Repair Project
  • Facility Inspections
  • Admin Costs
  • 2. Replacement/Improvements/Expansion
  • Toll System Replacement
  • Bridge Overlays
  • Pavement Overlays
  • Bridge Superstructure Replacement
  • Bridge Replacement
slide-12
SLIDE 12

Protective Coatings

slide-13
SLIDE 13

Typical MR repairs

slide-14
SLIDE 14

Joint & Deck Repairs

slide-15
SLIDE 15

Steel Repairs

slide-16
SLIDE 16

Epoxy Injection

slide-17
SLIDE 17

Pavement Overlays

slide-18
SLIDE 18

Bridge Overlays

slide-19
SLIDE 19

Superstructure Replacement

slide-20
SLIDE 20

Bridge Replacement

slide-21
SLIDE 21

Cost st Estim timate ate & S & Sch chedu dule le

slide-22
SLIDE 22

GE GEC Evaluation luation Cri riter teria ia

  • Proposal Responses

85%

  • Experience of Personnel
  • Experience of Firm
  • Organizational Approach & Managerial Capability
  • Qualifications of PM
  • Diversity & Inclusion Plan
  • Interview

15%

slide-23
SLIDE 23
  • Written questions due – May 15th
  • Question responses addendum – May 19th
  • Proposals due – May 30th at 3:00 PM (local time)
  • Interviews – June 19th (week of)
  • Board recommendation – July 11th
  • Final agreement – Anticipated by end of July 2017

Im Importa portant nt Da Dates es