Re Requ quest st for Pr Propo posals sals 20 2017 17 Sele - - PowerPoint PPT Presentation
Re Requ quest st for Pr Propo posals sals 20 2017 17 Sele - - PowerPoint PPT Presentation
Ge Gene neral ral En Engine neerin ering g Co Cons nsul ulta tant nt Re Requ quest st for Pr Propo posals sals 20 2017 17 Sele lection ction Committee mmittee Theresa Simmons, PE (Operations/Engineering) Jim Madison
Sele lection ction Committee mmittee
- Theresa Simmons, PE (Operations/Engineering)
- Jim Madison (Finance)
- Paula Watson (Procurement & Audit)
RMT MTA O Ove vervi rview ew
- Political subdivision of the Commonwealth of Virginia
- Created in 1966 to improve mobility within the Richmond
Region
- 2014 – Legislative name change to RMTA from RMA
- Governed by a Board of Directors
- 5 – City of Richmond
- 5 – Henrico
- 5 – Chesterfield
- 1 – Commonwealth Transportation Board
- Self-supporting through toll revenue
- Expressway System
- ≈ 7.0 miles
- ≈ 51.2 lane-miles
- 36 bridges (5 RR bridges)
- 2 culverts
Existing Roadway System 7 miles long 50 lane miles A part of the Federal NHS 31 Highway Bridges & 5 RR
RMT MTA Toll ll System em Repl placement acement
Scope e of Servic ices es Dedicated Toll System Project Manager Construction administration & project management Toll system design, integration & installation review & coordination Toll system testing
- versight for traditional
& ORT systems Systems transition
- versight between
integrators and VDOT CSC
RMT MTA Toll ll Road d Faci cilities lities
Scope e of Servic ices es Structural & highway design Architectural services Facility inspections and reports Environmental services Strategic planning
RMTA Toll ll Road Inspections ections
- Pavement, shoulder and curb conditions
- Culverts and other drainage structures
- Grading, slopes and landscaping
- Roadway and sign lighting
- Signing and sign structures
- Pavement markings
- ROW Fencing
- Guardrail and impact attenuators
- Toll plazas and administration facilities
- Bridges
RMT MTA Bri ridg dge e In Inspecti pections
- ns
- All 36 bridges are inspected on a biannual basis
- 8 bridges contain fracture critical members that must be inspected on
a yearly basis
- 14 bridges require element level inspections
- 9 bridges require CSX and/or NS Entry Agreements
- Ability to secure agreements before inspections begin is mandatory (July
2017)
- 4 bridges contain submerged elements which are inspected every 5
years
- A portion of submerged elements on 1 bridge is inspected every 2
years due to existing cracking
- All bridge safety inspection reports shall be submitted by the GEC on
behalf of the RMTA to VDOT upon completion
Typical Bridge Inspection Pictures
Up Upda dating ing Capi pital tal Im Improv provemen ement t Pro rogram ram
- 1. Inspection and Evaluation
- 2. Prioritize
- 3. Estimate
- 4. Schedule
Typical Capital Improvements
- 1. Maintenance/Repair
- Steel Protective Coatings
- Annual Maint/Repair Project
- Facility Inspections
- Admin Costs
- 2. Replacement/Improvements/Expansion
- Toll System Replacement
- Bridge Overlays
- Pavement Overlays
- Bridge Superstructure Replacement
- Bridge Replacement
Protective Coatings
Typical MR repairs
Joint & Deck Repairs
Steel Repairs
Epoxy Injection
Pavement Overlays
Bridge Overlays
Superstructure Replacement
Bridge Replacement
Cost st Estim timate ate & S & Sch chedu dule le
GE GEC Evaluation luation Cri riter teria ia
- Proposal Responses
85%
- Experience of Personnel
- Experience of Firm
- Organizational Approach & Managerial Capability
- Qualifications of PM
- Diversity & Inclusion Plan
- Interview
15%
- Written questions due – May 15th
- Question responses addendum – May 19th
- Proposals due – May 30th at 3:00 PM (local time)
- Interviews – June 19th (week of)
- Board recommendation – July 11th
- Final agreement – Anticipated by end of July 2017