Public Works Standard Drawings Subcommit ittee Meetin ing Monday, August 10, 2020 UberConference Wel elcome an and In Introductio ions th Mee July 6 th Jul eetin ing Sum ummary ry Table of Contents 4040 4090 Add a detail for


slide-1
SLIDE 1

Public Works Standard Drawings Subcommit ittee Meetin ing

Monday, August 10, 2020 UberConference

slide-2
SLIDE 2

Wel elcome an and In Introductio ions

slide-3
SLIDE 3

Jul July 6th

th Mee

eetin ing Sum ummary ry

Table of Contents

  • Add a detail for blow off to the division
  • Add curb markings as a general note, The

City of Coppell’s drawing 4220 is a good example 4010A

  • Show the restraint joint graphically
  • Add note, “All fittings require a megalug

joint restraint in concert with thrust blocking

  • r in reference to Standard Drawing 4040 for

General Notes.” 4020

  • Show the restraint joint graphically

4030

  • Revisit when the Subcommittee looks at

pipe lowering 4040

  • Add a comment about sacrificial anodes

if the soil is a certain chemistry. Mathew will send Olivia the exact wording.

  • Add a note about joint restraints.

Mathew will send Olivia the exact wording.

  • Add a note about using a zinc pad or cap.

The City of Coppell’s drawing 4050 points to the zinc cap and joint restraint. 4050

  • Polywrap the gate valve
  • Include the mechanical joint restraint
  • Include tracer wire
  • Include the zinc nut/pad
  • This should be the standard for 4”-16”,
  • ver 16” the city can choose to go

horizontal or butterfly. 4060

  • Manhole frame and cover should be 30”

instead of 24” 4090

  • Add note, “Copper or other

approved material”

  • Show concrete pad from the note
  • Increase the manhole to 30”
  • Remove table

4100A

  • Add note, “Copper or other

approved material”

  • Show concrete pad from the note
  • Increase the manhole to 30”

4100B

  • Rename to “Air Vent Standard

Dimension and Detail”

  • The Subcommittee discussed if

there was an instance where the air valve is type 1 installation or type 2 and if 4090 needs its own detail for the vent.

slide-4
SLIDE 4

Division 4000: Water Distribution

slide-5
SLIDE 5

Add a detail for blow off and a detail for curb markings as a general note

slide-6
SLIDE 6
slide-7
SLIDE 7

Show the restraint joint graphically Add note, “All fittings require a megalug joint restraint in concert with thrust blocking or in reference to Standard Drawing 4040 for General Notes.”

slide-8
SLIDE 8
slide-9
SLIDE 9
slide-10
SLIDE 10

Show the restraint joint graphically

slide-11
SLIDE 11

Revisit when the Subcommittee looks at pipe lowering

slide-12
SLIDE 12

Add a comment about sacrificial anodes if the soil is a certain chemistry. Mathew will send Olivia the exact wording. Add a note about joint

  • restraints. Mathew will send

Olivia the exact wording. Add a note about using a zinc pad or cap. The City of Coppell’s drawing 4050 points to the zinc cap and joint restraint.

slide-13
SLIDE 13

Polywrap the gate valve Include the mechanical joint restraint Include tracer wire Include the zinc nut/pad This should be the standard for 4”-16”, over 16” the city can choose to go horizontal or butterfly.

slide-14
SLIDE 14

Manhole frame and cover should be 30” instead of 24”

slide-15
SLIDE 15
slide-16
SLIDE 16
slide-17
SLIDE 17
slide-18
SLIDE 18
slide-19
SLIDE 19
slide-20
SLIDE 20

Add note, “Copper or other approved material” Show concrete pad from the note Increase the manhole to 30” Remove table

slide-21
SLIDE 21

Add note, “Copper

  • r other approved

material” Show concrete pad from the note Increase the manhole to 30”

slide-22
SLIDE 22

Rename to “Air Vent Standard Dimension and Detail” The Subcommittee discussed if there was an instance where the air valve is type 1 installation or type 2 and if 4090 needs its own detail for the vent.

slide-23
SLIDE 23
slide-24
SLIDE 24
slide-25
SLIDE 25
slide-26
SLIDE 26
slide-27
SLIDE 27
slide-28
SLIDE 28
slide-29
SLIDE 29
slide-30
SLIDE 30
slide-31
SLIDE 31
slide-32
SLIDE 32
slide-33
SLIDE 33
slide-34
SLIDE 34

Next xt Steps

  • Determine action items for Subcommittee Members and NCTCOG

staff

slide-35
SLIDE 35

Next Standard Drawings Meetings September 21, 2020 10am-11:30am

UberConference